Hong Kong MTR Shatin Central Link

Hong Kong MTR Sha Tin to Central Link is a subway system expansion impacting 5 MTR lines and 11 stations. The project has been sub-divided in two phases, which should respectively be competed in 2019 and 2021.

Dextra has been involved since 2015 in the design, engineering and supply of large FRP Soft Eyes for multiple packages (1103, 1106, 1107 and 1128) and stations to the various contractors involved.

A total of 18 Soft Eyes have been engineered and produced by Dextra for this project. The Soft-Eyes are part of station D-Walls and positioned at station entrance/exit and introduction/extraction shafts.

Prior to D-Wall construction, Dextra engineers the FRP cage design taking into account size of the TBM, margin for error, soil forces and more design parameters.

Thanks to the properties of FRP material, Tunel Boring Machines may cut through the D-Wall in a minimum time, saving time on schedule and ensuring the perfect condition of the TBM’s head.

All ASTEC FRP rebar (straight and L/U Shapes) are manufactured in our Guangzhou production facility, which is located around 3 hours drive from Hong Kong.

Show all projects
  • CountryHong Kong
  • Start year2015
  • End year2015
  • ContractorBachy Soletanche, Sembawang/Leader JV, Chun Wo/Seli JV, Dragages/Bouygues JV
  • Consultant-
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!

Sign in to your account