Flamanville EPR

Flamanville EPR

Flamanville is the first reactor built after the new generation EPR design (European Pressurized Reactor), after a 100% Chinese design. It will have a capacity of 1.3GWe when entering service in 2019.

Dextra has been present on site since the beginning of the construction works in 2008 and until 2015.

For this challenging project, Dextra has been supplying its Griptec rebar splicing solution through its local fabricator partners. The rebar preparation was supported by an additional machine placed at site.

Griptec is the preferred rebar splicing solution of the nuclear industry thanks to its unique performance level and an automatic testing process which systematically tests all the connections produced as part of its standard cycle: a guarantee that 100% of the connections perform above project requirement.

More than 800,000 Griptec connections have been used on the project, including 400,000 position assemblies, allowing to connect large diameter rebar without rotating them. The Griptec connections have been installed on reactor building and APC shell, as well as auxiliary buildings.

In particular, Griptec have been used for the connections of large prefabricated panels.

 

Four sided panels with Griptec female sleeves and bridging studs

Four sided panels with Griptec female sleeves and bridging studs

 

Thanks to its Bridging Assemblies, square panels could be reconnected on four sides while coping for possible misalignment that occur when lifting the cage.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.