Doha Link (Jaber Causeway)
Doha Link is a marine bridge project currently being built West of Kuwait City. It will ultimately be connected to Main Causeway Across Kuwait Bay, another sea link project North of Kuwait City, which connected make together the Jaber Causeway sea link, one of the largest civil engineering project ever built in the Middle East.
The Doha Link stretches West of Kuwait City, It will ultimately solve traffic congestion and offer a direct itinerary thanks to a 7.7km bridge structure built on shallow waters across the Kuwait Bay.
Rebar splicing solution
Dextra has been involved in the early stage of the construction project to provide a technical solution for the splicing of the very large rebar cages making the onshore and offshore foundation piles.
Rolltec® couplers for large diameter rebar (32, 36 and 40mm) were used for the connection of cages and piers. Two grades of rebar are used across the project: ASTM Grade 60 and Grade 80. Rolltec being compatible by design with the higher ASTM Grade 80, same couplers may be used on all applications, simplifying stock keeping.
In addition, smaller diameters couplers for rebar 12mm and 16mm were used for the superstructure and the footing of light poles
One of the main advantages of Rolltec for remote projects its very light machine set up. Rolltec is supported by a single one-man machine, offering a high level of productivity. Because the equipment is relatively small and the rebar preparation efforts were taking place simultaneously on both sides of the sea link construction, Dextra dispatched up to 4 machines on each side of the project to support the piling efforts.
Sonitec tube solution
With large piles of 2.5m diameter and 60m depth in average, it was compulsory for GS E&C to conduct sonic logging tests to examine the integrity of concrete piles, requiring to install 8 tubes in each cage.
To achieve very long tube length and optimize cage preparation output, Dextra Sonitec was the preferred choice of the contractor. Thanks to its light weight and unique Push-Fit® connection feature. Sonitec provides enough flexibility during the cage construction, lifting and assembly of the cage, and remove needs for additional time-consuming welding operations.