Dextra Group | Reliable Connections

Search
Close this search box.

Al-Zour LNG Import Terminal

Al-Zour LNG Import Terminal

The Al-Zour LNG Import Terminal is the world’s largest liquefied natural gas (LNG) import terminal, located 90 kilometers southeast of Kuwait’s capital. The project included the construction of a re-gasification facility, eight LNG storage tanks with a capacity of 225,000m³ each, marine facilities including two marine jetties, and berthing facilities for loading, and other components such as 14 HP pumps, boil-off gas (BOG) and flare facilities.

The facility was expected to produce approximately 22 million metric tonnes (MMT) of natural gas a year and would have a storage capacity of 1.8 million m³ of LNG. The liquefaction capacity of the terminal would be 30 billion cubic metres a day (bcm/d).

Dextra supplied 202 tons of grade 700 marine tie bars and 166 tons of wailing beams for the construction of marine facilities of this project. Tie bars were used as anchors between sheet piles or concrete walls.

The import terminal was completed in November 2021 and it reached full operations in February 2022. The LNG terminal is providing the Middle East country with a stable gas network in the long run, allowing it to respond to the rising call for energy diversification and sustainable energy.

Image credit: Hyundai Engineering Co.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.