Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Green Duba Integrated Solar Combined Cycle Power Plant

Green Duba Integrated Solar Combined Cycle Power Plant

Duba ISCC Green Power Plant 1 is a large power infrastructure project taking place in the North West of Saudi Arabia, on the Red Sea. The ISCC (Integretad Solar Combined Cycle) technology is adding 50 MW of solar power to the gas & steam turbine generating 500 MW.

For that project, Dextra supplied Double Corrosion Protection Ground Anchors used as a permanent anchoring solution for the excavation works preparing the pumping chamber. A total of 264 anchors (Grade 1080/1230, Ø32 & 40mm) have been supplied and installed on 4 layers.

The Double Corrosion Protection anchors supplied for this project were pre-grouted at Dextra factory (first layer of grout between steel bar and HDPE sleeve). The pre-grouted segments were reconnected at site thanks to couplers. Pre-grouted anchors not only save time and money on site operations, they also allow an overall better anchor quality by performing the first grout layer in a factory-controlled environment.

 

Installation at site was carried out by foundation contractor BAUER, which performed drilling, lifting, installation, grouting and post-tensioning operations. Dextra offered guidance during the early steps of the installation by sending a team of geotechnical specialists at site.

The general sequence of installation is the following (illustrated in pictures below):

  1. After unpacking from shipping racks, splicing of segments with couplers, covered by heat shrink sleeves.
  2. Transportation of assembled anchor from assembly to site to lifting area (13kg per linear meter).
  3. Wiring cable at the head of anchor to control the descent. Grouting pipe also pre-installed along the anchor.
  4. Inserting the 30 meters anchor into drilled hole together with grouting pipe.
  5. After grouting and stressing, a head cap filled with grease is installed on the anchor head, maintain the anchor fully isolated from the corrosive outside environment.

For more information about our excavation and ground solutions in the Middle East, please contact our Dubai office.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.