Dextra Group | Reliable Connections

DEXTRA
Search
Close this search box.
My Dextra
Search
Close this search box.

Madrid Chamartín Clara Campoamor Railway Station Expansion

Madrid Chamartín Clara Campoamor Railway Station Expansion

Madrid Chamartín Clara Campoamor Railway Station Expansion is one of the largest infrastructure projects in Spain. The expansion project aimed to increase the capacity of the railway station and improve the overall passenger experience. Dextra supplied 60,000 linear meters of Sonitec, a crosshole sonic logging testing tube, for the piling work of the project.

The Madrid Chamartín Clara Campoamor Railway Station is one of the busiest railway stations in Spain, serving more than 60 million passengers each year. The expansion project was necessary to meet the growing demand for train services in the city. The project involved the construction of new platforms, tracks, and passenger facilities.

Dextra, a leading supplier of construction solutions, was chosen to supply the Sonitec crosshole sonic logging testing tube for the piling work of the project. The Sonitec tube is a highly advanced system that enables precise and accurate measurements of pile integrity. The system uses crosshole sonic logging technology to assess the condition of the piles, ensuring that they are strong enough to support the weight of the railway station.

The use of the Sonitec crosshole sonic logging testing tube allowed the construction team to carry out the piling work with confidence and ensured the structural integrity of the piles. The system provided real-time data on the pile condition, enabling the construction team to make informed decisions and make any necessary adjustments during the construction process.

Banner image credit: UNStudio, b720 Arquitectura and Esteyco

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.