New Champlain Bridge

New Champlain Bridge

The New Champlain Bridge is a 3 km-long bridge spanning the Saint Lawrence River at the southeastern entrance of Montreal, Quebec, Canada. As one of the busiest bridges in Canada, it plays a crucial economic role for the city, serving as a key route to the United States, located 60 km south.

 

Replacing the Older Champlain Bridge

The New Champlain Bridge is replacing the existing Champlain Bridge, which was commissioned in June 1962. The older structure began showing signs of corrosion in 1994. After several temporary safety measures were implemented to keep the bridge operational, a replacement project was initiated in 2007. For a time, both bridges will stand side by side until the older structure is fully dismantled, with most of its materials planned for recycling.

 

A Focus on Corrosion Resistance

The New Champlain Bridge is designed to last at least 125 years and accommodate 50 million vehicle crossings per year. Given the corrosive environment caused by frequent road de-icing, corrosion resistance was a top priority. Duplex stainless steel rebar was installed in critical areas to enhance durability.

For this project, Dextra recommended using Duplex Stainless Steel Rolltec couplers and anchors. This specialized version of our Rolltec® system replaces standard couplers and anchors with an improved duplex steel alternative, offering superior corrosion resistance.

The Rolltec® solution is well-suited to the Canadian market and is approved by the Quebec Ministry of Transport. With a single-operator threading machine and 30-second threading cycles, it provides high productivity, making it ideal for high-labor-cost markets like Canada.

More than 10,000 Stainless Rolltec® couplers were supplied for this project, primarily for bridge spans. These couplers were used to splice large-diameter reinforcement bars, ranging from 35M (#11) to 55M (#18)—the largest size available in our Rolltec® range.

Additionally, about 10,000 Rolltec® stainless steel end anchors were delivered for sizes up to 55M (#18). Rolltec® Headed Bars use the same threading system as the couplers, simplifying production and installation.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.