Dextra Group | Reliable Connections

Mandovi River Cable Stayed Bridge

Mandovi River Cable Stayed Bridge

The third bridge over the Mandovi River in Goa is an iconic structure that connects Panaji in Tiswadi Taluka and Porvorim in Bardez Taluka. Positioned between the two existing bridges, it was designed to ease traffic congestion along this route. The bridge was officially inaugurated on January 27, 2019.

As one of the longest cable-stayed bridges in India, the four-lane, 21m-wide, 620m-long continuous span Mandovi River Cable-Stayed Bridge adds architectural beauty to Panaji. Standing 70m above sea level, its central concrete pylons are spaced at 150m and are supported by 88 cables arranged in a single-plane harp-type configuration.

Dextra supplied 1,170 sets of fully-threaded post-tensioning bar systems in diameters of 25, 32, 40, 50, and 75mm, with a grade of 830/1030, for various applications, including:

  • Hanger bars
  • Vertical prestressing
  • Horizontal prestressing bars
  • Lifting bars
  • Anchoring the pier head segment to the pier cap
  • Anchoring the front support to the pier cap
  • Anchoring the front cantilever support to the pier cap
  • Anchoring the middle, rear, and auxiliary supports

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.