The Zuari bridge is a 640-meter long 8-lane cable-stayed bridge laying across the massive river Zuari in Goa. The project also includes 450-meter long elevated approaches with only 2 pillars, along with a 12-kilometer detour. The total value of the project is estimated at $227M.

This new bridge will solve the long commute problems across the two banks of the river. Additionally, with the wider span than the old one, this shall also take care of the growing vehicular traffic which its predecessor built some 30 years back.

With the new bridge, the Public Work Department (PWD) aims to improve road safety and ease traffic flow. Two towers and viewing galleries will also be added for tourism purposes. Being started in 2016, the project is planned to be finished in 2019.

Parallel-threaded rebar couplers for the bridge’s pile cages and pylons

For this massive project in Goa, Dextra has been supplying its popular parallel-threaded rebar splicing solutions Bartec for Fe 500 and Fe 600 Grade steel. More than 110K Bartec couplers are getting installed in Pile cages and Pile caps. This is one of the iconic bridge project, may be one of its kind, with Fe 600 grade steel to be a part of Pile caps and Fe 500 grade steel in piles up to 48 meter deep. Pylon is 103 meter in height and designed with Fe 600 grade steel as well.

Bartec is a full performance mechanical rebar couplers, with no reduction of cross-section area of the bar thanks to their parallel-threads. This characteristic makes the rebar connections a strong point of the structure, and can also simplify the project’s inventory: one type of coupler for both standard and position applications.

The bar-end preparation is also supported by 3 high-productivity machines which prepare each bar in sequence: cutting, cold forging and threading.

Dextra post-tensioning bars for precast elements and segment castings

In addition to Bartec couplers, for the bridge’s precast segments, the contractors also opted for Dextra post-tensioning bar systems. PT bars helps the project’s stakeholders carry out the erection of precast segments and the casting of the segments in time, and in a quality controlled manner.

More than 500 sets of pt bars were delivered to the project as of November 2018. Dextra has made supplies to Dilip Buildcon for Yard applications and Launching.

Also, for phase III of the project, Dextra has made supplies to NRS for PT bars and accessories.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。