Zuari Bridge, India

Zuari Bridge, India

A Major Cable-Stayed Bridge in Goa, West India

The Zuari Bridge, a remarkable 640-meter-long, 8-lane cable-stayed bridge, spans the mighty Zuari River in Goa, West India. The project also includes 450 meters of elevated approach roads supported by just two pillars, along with a 12-kilometer detour. The total estimated value of the project is $227 million.

This new bridge will significantly reduce long commute times between the two banks of the river. With a wider span compared to its 30-year-old predecessor, it will also accommodate the increasing vehicular traffic in the region.

The Public Works Department (PWD) aims to enhance road safety and streamline traffic flow with the new structure. In addition to the bridge, two towers with viewing galleries will be incorporated for tourism purposes. The project, which began in 2016, is slated for completion in 2019.

Parallel-Threaded Rebar Couplers for Piles and Pylons

Dextra has played a pivotal role in this landmark project by supplying its renowned 巴特克 parallel-threaded rebar couplers for Fe 500 and Fe 600 Grade steel. Over 110,000 巴特克 couplers are being used in the bridge’s pile cages and pile caps. This iconic project features Fe 600 grade steel in the pile caps and Fe 500 grade steel in piles that extend up to 48 meters deep. The bridge’s 103-meter-high pylons are also designed with Fe 600 grade steel.

巴特克 couplers are a high-performance mechanical solution, ensuring no reduction in the cross-sectional area of the bars due to their parallel threads. This characteristic strengthens the rebar connections and simplifies project inventory management—one type of coupler is used for both standard and position applications.

The preparation of each rebar end is efficiently handled by three high-productivity machines, which cut, cold forge, and thread the bars in sequence.

Post-Tensioning Bars for Precast Elements and Segment Castings

In addition to the 巴特克 couplers, Dextra supplied 后张拉杆系统 for the bridge’s precast segments. These PT棒 are crucial for ensuring timely and high-quality erection of precast segments and casting operations.

As of November 2018, over 500 sets of PT棒 had been delivered for the project. Dextra supplied these bars to Dilip Buildcon for yard applications and launching operations.

For Phase III of the project, Dextra provided PT棒 and accessories to NRS.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。