德克斯达集团|可靠的连接

搜索
关闭此搜索框。

Rail Baltica Bridge Over Neris River, Lithuania

 

Rail Baltica Bridge over the Neris River, Lithuania

 

The construction of the Rail Baltica Bridge over the Neris River near Jonava marks a significant milestone in the region’s railway infrastructure. Stretching 1.5 kilometers, this bridge will not only be the longest in Lithuania but also the entire Baltic States. Designed with a variety of spans—including cast-in-place from traveler, cast-in-place supported on falsework, and span-by-span cantilever—the project showcases advanced engineering techniques and a commitment to environmental protection.

Dextra plays a vital role in ensuring the structural integrity of the bridge by supplying 索尼泰克 crosshole sonic logging (CSL) testing tubes for the testing of piles. CSL testing is a crucial procedure that provides real-time insights into the quality and integrity of concrete in the piles, ensuring they meet stringent safety standards. This advanced technology enables engineers to detect anomalies and assess the quality of the concrete, ensuring the long-term durability of the bridge.

指某东西的用途 索尼泰克 is particularly important given the bridge’s engineering complexity and the environmental considerations surrounding its construction. By integrating this technology, Dextra helps to uphold the highest standards of construction and environmental stewardship.

The Rail Baltica project represents the largest railway infrastructure development in the history of the Baltic States. Once completed, it will provide an electrified double-track European gauge railway line connecting major cities such as Warsaw, Kaunas, Riga, and Tallinn. This ambitious project will span a total of 870 kilometers, with 392 kilometers in Lithuania alone.

With the Rail Baltica Bridge over the Neris River, Dextra is proud to contribute to a landmark project that promises to enhance regional connectivity, promote sustainable transport solutions, and respect the delicate balance between development and environmental conservation. As construction progresses, the bridge will stand as a testament to innovative engineering and collaboration, paving the way for a brighter, more connected future in the Baltics.

Industrial Bridge, Chile

 

Industrial Bridge, Chile

 

Dextra’s engineering expertise and innovative products played a pivotal role in the construction of the Industrial Bridge in Chile. As part of the project, Dextra supplied its 罗尔泰克 mechanical splice system, ensuring robust and reliable rebar connections. Additionally, 有头条 were provided to enhance anchorage performance, a critical requirement for the bridge’s structural integrity.

The project also utilized 索尼泰克 crosshole sonic logging (CSL) testing tubes, facilitating thorough integrity testing of concrete piles, ensuring long-term safety and performance. These advanced solutions reflect Dextra’s commitment to supporting complex infrastructure projects with high-quality, tailored products.

The Industrial Bridge stands as a testament to modern engineering and showcases the critical role Dextra’s solutions play in shaping resilient and efficient infrastructure worldwide.

Grand Paris Express – Line 16-18, France

 

Grand Paris Express – Line 16-18, France

 

Dextra has proudly supplied its high-performance 福泰克 钢筋连接器和 索尼泰克 crosshole sonic logging (CSL) tubes for the construction of the Grand Paris Express Line 16-18 in France, one of Europe’s most ambitious infrastructure projects. This metro expansion aims to improve connectivity between the suburbs and the city center, providing a more efficient transportation network for millions of commuters.

Dextra’s 福泰克 couplers were utilized for reliable and durable rebar connections, ensuring the structural integrity of the extensive underground tunnels and stations. In addition, the 索尼泰克 CSL tubes were supplied for concrete pile integrity testing, essential for assessing the quality of deep foundations. These innovative solutions have contributed to the project’s success in meeting high safety and performance standards, underscoring Dextra’s commitment to delivering top-quality materials for large-scale infrastructure developments.

With the Grand Paris Express set to transform the city’s transportation landscape, Dextra’s involvement highlights its role in shaping resilient and sustainable urban infrastructure.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of 铬棒1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

索尼泰克, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ 钢筋连接器

✅ GFRP Rebars

✅ 船用拉杆

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

无法显示 PDF 文件。 下载 反而。

滨海湾金沙

滨海湾金沙

滨海湾金沙 (Marina Bay Sands) 是一座壮观的度假胜地,拥有 2,500 多间客房、赌场、许多餐厅,顶部还有一个独特的空中花园。该项目于2010年竣工并向公众开放。

对于该项目,Dextra 在 2007 年至 2008 年间提供了加固拼接解决方案以及 Sonitec 管。

Bartec 钢筋连接器用于连续墙的基础,应对了双重挑战。

第一个钢筋连接器可垂直用于将 D-Wall 笼连接在一起,从而实现更长的笼长度。

然后,耦合器也可以水平地用作板的悬而未决的连接。在这种情况下,耦合器通常安装在钩杆上并用混凝土浇筑。在稍后阶段,连接器可以与第二阶段钢筋重新连接以开始板加固。

耦合器还用于地下隧道和通风建筑。

对于地基,Dextra 还提供了超过 100,000 延米的 Sonitec 管,这些管很容易安装在钢筋笼中并重新连接,从而提高了生产率并消除了繁琐且不可靠的焊接操作。安装后,管子牢固就位,支撑笼子的提升和搬运不会出现问题。

迪拜机场

迪拜机场

迪拜机场是阿拉伯联合酋长国的主要机场。这座著名的机场位于迪拜市以北几公里处,是著名的阿联酋航空公司的所在地。就国际旅客吞吐量而言,迪拜国际机场是全球#1机场。

同样位于迪拜的 Dextra Middle-East 参与了迪拜机场的众多建设项目,特别是在 2003 年至 2005 年期间,用于 3 号航站楼和相关大厅的建设。

对于迪拜内部项目,Dextra 提供了其广受欢迎的
巴特克 耦合器解决方案,阿联酋的 #1 钢筋耦合器解决方案。迪拜国际机场已使用 150 万个耦合器。

上层建筑

Bartec耦合器提供了一种技术解决方案,允许柱与梁之间、墙与梁之间的二期钢筋重新连接。

钢筋连接器还用于在钢筋上创建临时开口,以便人员和设备通过。

基础

Bartec 耦合器用于基础桩。对于该应用,连接器成为高度集成和自动化的笼式制造工艺的一部分,允许在最短的时间内将大直径钢筋连接在一起,并最大限度地提高笼式产量。

作为 Bartec 钢筋耦合器解决方案的补充,Dextra Sonitec 管用于确保沿笼子长度方向快速安装和重新连接声波管。由于其推入式橡胶嘴,Sonitec 管特别易于安装,并且由于其焊接头,易于安装在笼子中。多年来,迪拜国际机场已安装超过 1,800,000 米的 Sonitec 管道!

曼谷轻轨

曼谷轻轨

曼谷公共交通系统 (BTS) 是一个横跨泰国首都曼谷的大型城市轻轨系统。该系统于1999年启用。

截至 2017 年,该系统由 24 个高架车站和 37 公里长的高架铁路组成,两条主线在暹罗中央车站相互交叉。

BTS 系统正在对其两条主线进行扩建,线路和车站预计将于 2019 年和 2020 年投入运营。

基础

多年来,Dextra 为各种封装提供了 Sonitec 管,用于测试车站和铁路下方的混凝土桩基础。

Dextra 总共提供了大约 40,000 延米的 Sonitec 管,这个距离实际上相当于 BTS 系统本身的长度。

塔架

对于塔架垂直杆连接,Dextra 提供了其
巴特克 联系。
巴特克 允许使用简单的钢筋连接器方便地拼接预制钢筋笼,与重叠相比可以节省钢材并加速现场操作。

在泰国,螺纹加工由 Dextra 工厂提供支持,该工厂位于 Bankgok 东北部,交通便利。承包商收到已经准备好的钢筋并用钢筋连接器安装。

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。