The Santo Antônio Dam is a hydroelectric dam built on the Madeira River in the state of Rondônia, Brazil. It is powered by 50 turbines, with a total capacity of 3,580 MW.

For this major dam project, Dextra supplied its Rolltec rebar coupler solution to contractors Odebrecht & Andrade Gutierrez.

Rolltec is the most popular rebar splicing solution in Brazil, providing a competitive alternative to lap splices. The rebar preparation is supported by a unique, lightweight machine operated by a single worker. The Rolltec machine is relatively easy to transport and convenient to install, even in remote locations such as dam construction sites.

At the Santo Antônio Dam, rebar couplers were used to reconnect bent rebar. To achieve this, a straight bar is first threaded (A/B/C thread length) and then bent according to project requirements.

If needed, a coupler can be temporarily set up on the rebar to protect the thread.

For more technical information about coupler applications on bent bars, please contact us.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。