德克斯达集团|可靠的连接

搜索
关闭此搜索框。

AVE 帕伦西亚-桑坦德 HSR 套餐 1(帕伦西亚 – 北帕伦西亚)和套餐 2(北帕伦西亚 – 阿穆斯科)

AVE帕伦西亚-桑坦德高铁项目是一项重大基础设施建设项目,旨在连接西班牙帕伦西亚和桑坦德。该项目涉及广泛的铁路网络、高架桥和桥梁的建设,强调需要坚固而有弹性的地基。认识到确保混凝土桩结构完整性的至关重要性,项目管理层寻求先进的测试方法。

Dextra 通过提供 Sonitec 跨孔声波测井 (CSL) 测试管,在确保项目基础的稳健性方面发挥了关键作用。这些管有助于对 AVE 帕伦西亚-桑坦德 USR 包 1(帕伦西亚 - 北帕伦西亚)和包 2(帕伦西亚北 - 阿穆斯科)的混凝土桩进行全面的结构完整性测试。

跨孔声波测井是一种广泛应用于评估混凝土桩质量和完整性的无损检测方法。它涉及使用通过两个接入管之间的混凝土传输的声波,使工程师能够评估材料的特性并识别潜在的缺陷。

Sonitec 管专为跨孔声波测井而设计,确保在结构完整性测试期间收集精确可靠的数据。这些管在施工过程中嵌入混凝土桩中,为声波传输提供接入点。

High-Speed Rail Access Channel in Valencia – Phase 1

High Speed Rail Access Channel in Valencia – Phase 1

The High-Speed Rail Access Channel project in Valencia represents a transformative initiative aimed at enhancing connectivity, bolstering economic growth, and fostering sustainable development within the region and beyond. As such, ensuring the reliability and longevity of its infrastructure components is paramount. This is where Dextra steps in with its cutting-edge solutions.

The utilization of Sonitec tubes for crosshole sonic logging (CSL) testing exemplifies Dextra’s commitment to pioneering technologies that optimize construction processes and elevate industry standards. CSL testing is a non-destructive technique utilized to assess the integrity of deep foundation elements such as drilled shafts and bored piles. By transmitting ultrasonic pulses between pairs of probes embedded within concrete piles, CSL testing enables engineers to detect defects, voids, or anomalies that could compromise structural stability.

In the context of the High-Speed Rail Access Channel project, Dextra’s provision of 60,000 linear meters of Sonitec tubes empowers construction teams with a robust methodology for evaluating the quality and integrity of concrete piles. This comprehensive testing approach not only meets regulatory requirements but also instills confidence in the durability and performance of the infrastructure, safeguarding against potential risks and ensuring compliance with stringent safety standards.

The adoption of innovative solutions like Sonitec tubes underscores the evolution of construction practices towards greater efficiency, accuracy, and sustainability. By enabling early detection of potential issues and facilitating timely remediation measures, Dextra’s technology not only enhances project outcomes but also minimizes disruptions, reduces costs, and enhances overall project resilience.

As the High-Speed Rail Access Channel in Valencia moves forward, Dextra’s contribution serves as a testament to the power of collaboration and innovation in shaping the future of infrastructure. By harnessing the latest technologies and best practices, Dextra and its partners are not only building bridges and tunnels but forging pathways to prosperity, connectivity, and sustainable development for generations to come.

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。