分类: 石油和天然气
祖尔液化天然气进口码头
Al-Zour LNG Import Terminal: The World’s Largest LNG Import Facility
The Al-Zour LNG Import Terminal is the world’s largest liquefied natural gas (LNG) import terminal, located 90 kilometers southeast of Kuwait’s capital.
The project included the construction of:
- A re-gasification facility
- Eight LNG storage tanks, each with a capacity of 225,000 m³
- Marine facilities, including two marine jetties and berthing facilities for loading
- Other components such as 14 HP pumps, boil-off gas (BOG) and flare facilities
The facility was expected to produce approximately 22 million metric tonnes (MMT) of natural gas per year and have a storage capacity of 1.8 million m³ of LNG. The liquefaction capacity of the terminal was estimated at 30 billion cubic meters per day (bcm/d).
Dextra’s Contribution to the Marine Facilities:
For this project, Dextra supplied:
- 202 tons of Grade 700 船用拉杆, used as anchors between sheet piles or concrete walls
- 166 tons of waling beams, essential for reinforcing the marine infrastructure
The Al-Zour LNG Import Terminal was completed in November 2021 and reached full operations in February 2022. The terminal now plays a critical role in Kuwait’s energy infrastructure, providing the country with a stable gas network to support energy diversification and sustainable energy initiatives.
图片来源:现代工程公司
Maitree超级火电项目
Maitree Super Thermal Power Project: A Bangladesh-India Joint Initiative
The Maitree Super Thermal Power Project is a 2×660 MW coal-fired power station being developed by the Bangladesh-India Friendship Power Company (BIFPCL), a 50-50 joint venture between the governments of Bangladesh and India. The power station is located in Rampal, Bangladesh.
For this project, Dextra supplied more than 400 assemblies of Grade 700 Marine Tie Bar systems to connect piles and waling beams for a 1.2 km-long jetty at the coal power plant.
Dextra’s Marine Tie Bar systems consist of steel bars and anchorage accessories, which function as anchorage to tie back seawalls to anchor walls.
Key Features of Dextra’s Marine Tie Bar Systems:
- Available in three carbon steel grades, with yield stress up to 700 MPa.
- Selection of 24 bar diameters, up to M162, ensuring optimal performance for various project requirements.
- Standard range of anchorage components, allowing easy installation and connection to all types of marine walls.
The construction of the Maitree Super Thermal Power Project began in 2017 and was planned for completion by 2022.
吉里蒙庭院
Karimun Yard: A Key Fabrication Facility in Indonesia
The Karimun Yard is located on the small island of Karimun, Indonesia, less than 25 km from Batam and Singapore. Operated by Saipem, the yard offers over 780,000 sqm of fabrication areas with an annual production capacity of 50,000 tons.
Between 2009 and 2010, Dextra manufactured and supplied large 船用拉杆 for Saipem, which were incorporated into the main quay wall. Additionally, in 2008, Dextra supplied Marine Tie Bars and Waling Beams, connecting the sheet pile walls of the service jetty.
Marine Tie Bar Systems: High-Performance Solutions:
For the main yard, Dextra supplied its Grade 700 船用拉杆, the highest grade in the range.
- 更高 tie bar grades allow for high performance while reducing the size and weight of the bars, making transportation and installation easier.
- Grade 700 also enables design optimization, allowing bars to be spaced further apart, thus reducing the total number of bars required for the project.
Connection & Splicing Systems:
To connect the bars to the walls, ball cages were used.
- When used with a bearing plate embedded in the wall, ball cages allow a multidirectional adjustment angle of 10° for greater installation flexibility.
- To splice bar segments, couplers were also used, ensuring a strong and secure connection.
For more information about our marine solutions in Asia Pacific, please consult our 曼谷
*CF Saipem 码表 07.2014
晓星液化石油气洞室
晓星LPG洞穴:大型石化产品储存项目
该多阶段项目由晓星集团开发,包括以下建设:
- 丙烷脱氢(PDH)生产工厂
- 聚丙烯(PP)工厂
- 液化石油气(LPG)储罐
- 液化石油气和石化产品仓库
整个综合体占地 60 公顷,位于越南胡志明市附近巴地头顿的 Cai Mep 工业区内。
Dextra 将为 24 万吨液化石油气地下储存设施的建设提供 3 万单位 玻璃纤维增强聚合物(GFRP)岩栓这些锚杆用于加固150米深开挖区域周围的洞穴岩面。
为了有效防止漏油,海水将被注入周围的岩石,形成水幕。考虑到高腐蚀环境, GFRP岩栓 由于其耐腐蚀性,是理想的解决方案。
Dextra 的优势 GFRP岩石螺栓:
- 基于全螺纹GFRP筋的可切割矿用锚杆
- 有七种直径可供选择(范围从 20 毫米到 40 毫米)
- 随附 GFRP 板和螺母
- 重量轻,易于在隧道内搬运、运输和安装
这些设施预计将于 2020 年开始商业运营。
维萨赫炼油厂现代化
维萨赫炼油厂现代化
维萨赫炼油厂现代化项目是位于印度维沙卡帕特南的维萨赫炼油厂的棕地扩建项目。
该项目将把炼油能力从 8.3MMTPA(每年数百万吨)扩大到 15MMTPA,同时能够生产和分销符合印度政府制定的新排放标准 Bharat Stage-VI 的燃料。
Dextra 通过提供用于预制梁连接的 Unitec 螺栓连接器参与了扩建。
Unitec 是一种螺栓拼接系统,设计用于连接两根无螺纹钢筋:其螺钉将锁定钢筋两端并完成连接。
维萨赫炼油厂现代化项目计划于 2020 年完工。