德克斯达集团|可靠的连接

搜索
关闭此搜索框。

San’ao Nuclear Power Plant 1&2, China

 

San’ao Nuclear Power Plant 1&2, China

 
 

右旋糖苷 has successfully supplied 340,000 格瑞普泰克 couplers for the anti-aircraft impact shell construction of the San’ao Nuclear Power Plant units 1 and 2, featuring the advanced HPR1000 Hualong reactors.

格瑞普泰克, recognized as the only 100% proofed splicing system, has gained the trust of over ten nuclear reactors globally, cementing its reputation for reliability and safety in high-stakes environments. The system’s stringent quality assurance processes ensure that each coupler meets the demanding standards required for nuclear applications, providing unparalleled performance and durability.

One of the standout features of 格瑞普泰克 is its high-productivity bar end preparation equipment. This state-of-the-art machinery boasts an impressive processing speed of 30 to 45 seconds per bar end, significantly enhancing construction efficiency. Additionally, the equipment is designed for operation by a single operator, optimizing workforce utilization.

Moreover, 右旋糖苷 is the first manufacturer of products for civil works construction whose quality management system is ISO 19443 certified for nuclear safety. This certification underscores 右旋糖苷‘s commitment to the highest standards of safety and quality in the nuclear industry, reflecting the company’s dedication to excellence and reliability.

The San’ao Nuclear Power Plant project is a key component of China’s strategic initiative to expand its nuclear power capacity, which is vital for meeting the country’s growing energy needs while reducing carbon emissions. By supplying 格瑞普泰克 couplers, 右旋糖苷 is playing a crucial role in ensuring the safety and efficiency of this project.

 

弗拉芒维尔 EPR

弗拉芒维尔 EPR

弗拉芒维尔是继中国设计的100%之后,第一座采用新一代EPR设计(欧洲加压反应堆)建造的反应堆。 2019年投入使用时容量将为1.3GWe。

自 2008 年施工开始直至 2015 年,Dextra 一直在现场。

对于这个具有挑战性的项目,Dextra 一直通过其当地制造商合作伙伴提供 Griptec 钢筋拼接解决方案。现场放置的另一台机器支持钢筋准备。

Griptec 因其独特的性能水平和自动测试流程而成为核工业的首选钢筋拼接解决方案,该流程可系统地测试作为其标准周期一部分生产的所有连接:保证 100% 的连接性能高于项目要求。

该项目使用了超过 800,000 个 Griptec 连接件,其中包括 400,000 个位置组件,无需旋转即可连接大直径钢筋。 Griptec 连接器已安装在反应堆厂房和 APC 外壳以及辅助建筑物上。

特别是,Griptec 已用于大型预制板的连接。

 

Four sided panels with Griptec female sleeves and bridging studs

四个侧板带有 Griptec 母袖和桥接螺柱

 

由于其桥接组件,方形面板可以在四个侧面重新连接,同时应对提升笼子时可能发生的错位。

阿库尤核电站

阿库尤核电站

阿库尤核电站是土耳其梅尔辛省布于克切利阿库尤的一座正在建设中的核电站。这将是该国第一座核电站。

四台 1,200 MW VVER +3 机组,总容量为 4800 MW,是由 Rosatom 子公司 Akkuyu NGS Elektrik Uretim AS(Akkuyu 项目)按照 BOO(建设-拥有-运营)原则实施的世界上第一个核电站项目公司)。

第一套机组的主体建设于 2018 年 3 月开始,预计于 2023 年投入运营。

第二号机组于两年后开始建设,预计将于 2024 年完工,第三号机组和第四号机组将分别于 2025 年和 2026 年竣工。

迄今为止,Dextra 提供了超过 700,000 个 Fortec+ 耦合器和锁紧螺母,以及杆端准备设备,供所有 4 个反应器和辅助区域使用。

Fortec+ 是一款平行螺纹机械拼接系统,专为核项目设计,用于连接 Ø12 至 50 mm(ASTM #4 至 #18)的混凝土钢筋,符合欧洲规范 2、ASME Sec III Div 2。

添加锁紧螺母后,它完全啮合到连接杆的延伸螺纹上,有助于消除接头的残余变形。

现场还交付了10套棒材端部制备系统机器。钢筋端部准备可以通过 3 个步骤来实现:切割钢筋端部、冷锻以扩大钢筋锯切端部以及螺纹加工。

Fortec+ 系统增加了第四步,包括在钢筋准备过程结束时进行质量测试。螺纹钢筋端部在钢筋屈服强度 90% 下进行拉伸测试,以保证其性能。

图片来源:https://www.dailysabah.com/business/energy/construction-starts-on-2nd-unit-of-turkeys-1st-nuclear-power-plant-akkuyu?gallery_image=undefined# big(由 Energya 和 Natural 提供)资源部)

欣克利角C核电站

欣克利角C核电站


欣克利角 C (HPC) 核电站是欧洲最大、技术最复杂的项目之一。

HPC 是英国一代人以来建造的第一座核电站,其建设需要高技能的劳动力以及最好的建筑和工程解决方案。

The HPC Project is located in Somerset, South West England, and will consist of two nuclear reactors capable of generating 3.2GW of low-carbon electricity.

The new power station is being constructed in the same area as the existing Hinkley Point A and B stations. The former has ceased operation for quite some time, while the latter is decommissioning in 2022.

Dextra 受托为 HPC 部件(特别是反应堆的飞机冲击保护壳)提供混凝土钢筋的机械接头。

More than 2.5 million Griptec couplers are supplied for the construction of HPC.

Griptec is designed to comply with the most stringent project specifications, and has proven to be a popular system of choice for EPR nuclear power stations, having been used for the construction of the Flamanville 3, Taishan 1, and Taishan 2 power stations.

The Griptec mechanical splice consists of two steel sleeves which are swaged onto the end of the reinforcing bars by a specific machine that was designed and patented by Dextra.

该型锻机采用了系统的非破坏性拉力测试。 Griptec 是唯一能够对每个加工棒材进行自动质量控制的连接器系统。

Besides Griptec couplers, Dextra is also supplying 3 million headed bars to the project. These are reinforcing bars that are bent on one side and fitted with an anchorage head on the other side and are used for the transverse reinforcement of concrete slabs, rafts, and walls. They allow a much faster and safer site installation than conventional double-bend bars.

When complete, HPC will provide low-carbon electricity for around six million homes.


福清5号和6号反应堆

福清5号和6号反应堆

福清5号和6号反应堆是华龙一号的第一批反应堆,基于中国100%设计。反应堆容量为 1,000 兆瓦,计划于 2019 年和 2022 年开始运行。

自 2015 年 5 号反应堆建设开始以来,Dextra 就一直在现场,现在也参与了 6 号反应堆的建设。

对于这个具有挑战性的项目,Dextra 一直提供其 Griptec 钢筋拼接解决方案,该解决方案用于将钢筋拼接到 APC 外壳中。

Griptec 因其独特的性能水平和自动测试流程而成为核工业的首选钢筋拼接解决方案,该流程可系统地测试作为其标准周期一部分生产的所有连接:保证 100% 的连接性能高于项目要求。

多年来,这两个项目将使用超过一百万个 Griptec 连接,并由现场安装的两台 Griptec 设备提供支持。

Dextra 还为现场承包商团队提供支持,两名 Dextra 工程师轮流确保操作员培训、设置和预防性维护服务,以确保在生产高峰时段实现日夜最佳生产。

台山EPR 1&2

台山EPR 1&2

台山 EPR 是由阿海珐建造的两座 EPR 型核反应堆,容量为 1750 兆瓦,位于中国广东省台山附近。

自 2009 年施工开始一直到 2016 年,Dextra 一直在现场。反应堆计划于 2017 年开始运行。

对于这个具有挑战性的项目,Dextra 一直提供其 Griptec 钢筋拼接解决方案,用于反应堆的混凝土结构。

Bartec 钢筋连接器解决方案以及带头钢筋也用于该项目的其他建筑。

库丹库拉姆核电站 (KKNPP) 3 和 4

库丹库拉姆核电站 (KKNPP) 3 和 4

库丹库拉姆核电站(或KKNPP)是印度最大的核电站,位于印度南部泰米尔纳德邦蒂鲁内尔维利地区的库丹库拉姆。

两座反应堆(KKNPP-1 和 2)分别自 2013 年和 2016 年开始运行,另外两座反应堆(KKNPP-3 和 4)在 2016 年 2 月举行的奠基仪式后目前正在建设中。

KKNPP-3和4是俄罗斯设计的压水堆(型号VVER-1000/V-412)。这些反应堆是KKNPP-1和2的重复设计,并根据调试和运行经验反馈进行了进一步改进。

为了建造这两个装置,Dextra 提供了 350,000 个 Bartec 连接器,用于连接反应堆厂房、辅助厂房和乏燃料储存结构中的钢筋。

Bartec 是值得信赖的拼接系统,以其在拉伸、压缩和疲劳方面的高性能而闻名。它广泛应用于建筑物、桥梁、地铁、核反应堆等的建设。

3 号机组计划于 2023 年 3 月竣工,4 号机组将于次年竣工。

建成后,这两座反应堆将为现有机组增加2000兆瓦的电力,使现场总发电量达到每年4000兆瓦。

图片来源:https://twitter.com/daeindia/status/881395402171404288,https://www.deccanherald.com/content/619873/building-units-3-4-kudankulam.html

防城港核电站3、4号

防城港核电站3、4号

中国是世界上最大的核电生产国之一,并不断通过新反应堆扩大核电产能。

防城港核电站1、2号机组已于2016年投入运行,3、4号机组目前正在建设中。

防城港基地预计将有六座反应堆投入运行。 1号和2号机组均为CPR-1000反应堆,3-4号机组为华龙一号反应堆,预计5-6号机组也计划为华龙一号反应堆。

3 号机组于 2015 年 12 月开始建设,4 号机组于一年后开始建设。 Dextra 已供应超过 500,000 个 Griptec 耦合器套筒,用于加固 APC 结构。

Griptec 以其在拉伸、压缩和疲劳方面的可靠性和性能而闻名,这得益于产品的独特设计,符合世界上最严格的项目规范,尤其是核反应堆建筑施工规范。

拉贾斯坦邦原子能项目 (RAPP) 7&8

拉贾斯坦邦原子能项目 (RAPP) 7&8

拉贾斯坦邦原子能发电项目(RAPP)是位于印度拉贾斯坦邦拉瓦特巴塔的一座核电站,拥有6座加压重水堆(PHWR)机组,总装机容量为1,180兆瓦。

该核电站的所有者和运营商印度核电公司 (NPCIL) 正在通过建造另外 2 座反应堆(7 号和 8 号机组)来扩大该核电站的产能。

2011年7月,700MW容量的7号反应堆首次混凝土浇筑(FPC)完成。该装置的启动变压器(SUT)也已投入运行。

第 8 号反应堆的容量同样为 700 兆瓦,计划于 2021 年 12 月完工。

Dextra 已供应近 500,000 个 Bartec 耦合器,用于加固反应堆建筑、辅助建筑和乏燃料储存库。

2座重水堆反应堆将使该工厂的现有产能增加1,400兆瓦,其中700兆瓦将分配给拉贾斯坦邦。

卡克拉帕尔原子电站 3 号和 4 号

卡克拉帕尔原子电站 3 号和 4 号

卡克拉帕尔原子电站是印度一座核电站,位于古吉拉特邦苏拉特河和塔皮河附近。

3 号和 4 号机组是印度第一对自行设计的 700 MW 加压重水反应堆 (PHWR),位于古吉拉特邦的卡克拉帕尔,其中两台 220 MW PHWR 机组已投入运行。

经原子能监管委员会 (AERB) 批准后,Kakrapar 3 和 4 号核电站的第一批混凝土分别于 2010 年 11 月和 2011 年 3 月浇筑。

从那时起,Dextra 已供应了 540,000 个 Bartec 钢筋连接器,用于连接反应堆和控制建筑物的板和柱。

此外,安装了 Unitec 螺栓连接器来连接钢筋,无需任何螺纹准备。

最后,将带头钢筋安装到钢筋端部,大大减少了钢筋堵塞。

3 号机组预计将于 2021 年 3 月投入商业运营,而其双胞胎机组 4 号机组预计将于一年后投入商业运营。

图片来源:https://en.wikipedia.org/wiki/Kakrapar_Atomic_Power_Station,https://www.nucnet.org/news/kakrapar-3-indigenous-phwr-achieves-first-riticity-7-3-2020, https://www.asiavillenews.com/article/a-look-at-the-kakrapar-3-reactor-54367

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。