德克斯达集团|可靠的连接

Ciel Tower Dubai, UAE

Ciel Tower Dubai, UAE

Ciel Tower is an 82-storey high-rise building under development in Dubai Marina. With a total height of 365 meters, it is set to become the world’s tallest hotel-only building upon its completion, scheduled for 2025.

Located in the heart of Dubai Marina, the tower is near popular attractions such as Marina Walk and Marina Mall, a major shopping and entertainment complex. It will feature 1,042 luxury suites, along with a rooftop hosting a pool bar, a restaurant, and an observation deck.

The architectural design is heavily inspired by the concept of vertical living, maximizing panoramic views of Palm Jumeirah, Bluewaters Island, Dubai Harbour, and the Arabian Gulf.

Dextra has supplied 180,000 巴特克 couplers for critical structural connections, including rafts, columns to beams, slabs to core walls, core walls, and starter bars, enhancing the building’s strength and stability.

Ciel Tower is set to become an iconic landmark, further solidifying Dubai’s reputation as one of the world’s premier tourist destinations.

图片来源:https://www.archdaily.com/931860/ciel-the-worlds-tallest-hotel-is-under-construction-in-dubai-marina,https://propsearch.ae/dubai/ciel-塔

Orbit by Auro Realty, Hyderabad, India

Orbit by Auro Realty, Hyderabad, India

采用预制技术建造的印度最高商业建筑

Orbit is a 25-storey office building strategically located in the heart of Hyderabad’s IT Hub, constructed using precast technology. It is one of the tallest commercial buildings in India built with this method.

Constructed by Aurobindo Realty, the Orbit building was honored with the “Best Office Architecture India” award by the International Property Awards – Asia Pacific Property Awards 2018.

Designed with precast technology, the building is also proposed for LEED v4 Gold Certification from USGBC, demonstrating its commitment to environmental sustainability and energy efficiency.

Dextra’s 格鲁泰克 couplers played a key role in precast element connections. Approximately 60,000 couplers were installed in precast elements at the precast factory before being transported to the construction site for grout connections.

With the growing demand for modular buildings worldwide—especially during the COVID-19 pandemic, where healthcare and quarantine facilities were urgently needed—格鲁泰克 couplers have become a widely adopted solution. They are designed and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO standards.

图片来源:https://www.aurobindorealty.com/portfolio/orbit/

Two IFC (International Finance Centre), Hong Kong

Two IFC (International Finance Centre), Hong Kong

Two IFC is a landmark skyscraper in Hong Kong, located in West Kowloon. The 412-meter-high commercial building features 88 floors and is the second tallest building in Hong Kong, following the ICC Tower.

Vertical reinforcement is a crucial structural feature for buildings of this height. Consultant ARUP and contractors E-Man-Sanfield JV selected Dextra for the splicing of reinforcement throughout the building.

For this project, Dextra supplied more than 200,000 巴特克 rebar couplers, which were primarily used for vertical connections, especially in all columns.

Additionally, rebar couplers provided connection points for second-phase rebar reconnection, typically between columns and slabs and columns and beams. To achieve this, rebar couplers were aligned horizontally and cast in concrete, allowing for reconnection at a later stage by screwing in the second-phase rebar.

巴特克 is the preferred reinforcement splicing solution for contractors in Hong Kong, as it is recommended in the Hong Kong Building Material List. Dextra also operates its own rebar threading workshop in Hong Kong, providing rebar preparation services for its customers.

King Abdullah Financial District, Saudi Arabia

King Abdullah Financial District, Saudi Arabia

The King Abdullah Financial District (KAFD) is a multipurpose business and residential complex located in Riyadh, Saudi Arabia. The district consists of more than 50 towers and is expected to accommodate a working population of around 12,000 people.

Dextra Middle East, based in Dubai, has been involved since 2009 in supplying several building packages to Saudi Bin Ladin Group, the main contractor for the project.

Foundation Piles

To provide vertical connections in foundation piles, Dextra supplied its popular 巴特克 rebar coupler solution—the #1 rebar 连接方案 in the Middle East—through its fabrication partners.

In addition to 巴特克 couplers, Dextra also supplied 联合技术公司 couplers, which were used for the continuation of bars protruding from the foundation piles. 联合技术公司 offers a flexible solution for contractors, as it does not require prior bar-end preparation. It only requires an impact wrench, making it easy to operate, especially on remote construction sites.

筏和柱

巴特克 couplers were also used for horizontal connections in the thick foundation rafts and vertical connections in the protruding columns.

Core Wall-to-Beam 应用领域

In the building superstructure, Dextra 巴特克 couplers were used to provide horizontal connections from the 心墙, enabling the insertion of second-phase starter bars needed to create the beam 钢筋/增强筋.

My Home GRAVA Hyderabad, India

My Home GRAVA Hyderabad, India

 

在印度海得拉巴的中心地带,一个卓越建筑和工程创新的宏伟见证——My Home GRAVA 项目正在形成。这个大型项目由八座 43 层高的塔楼组成,是现代生活和建筑行业技术进步的象征。 Dextra 是这一大型企业成功的关键贡献者之一,它是为建筑行业提供创新解决方案的全球领导者。

优化设计和施工:

GRAVA 背后的富有远见的开发商 My Home Construction 不遗余力地确保设计和施工方法的优化。从规划的早期阶段开始,我们的重点就是交付一个不仅重新定义奢华生活,而且为建筑效率和可持续性设定新基准的项目。

Dextra 耦合器:结构革命:

At the core of GRAVA’s construction success is the implementation of 570,000 格鲁泰克 couplers and more than 70,000 巴特克 couplers for all structural connections within the concrete frame. These couplers play a pivotal role in ensuring the structural integrity of the buildings, providing a secure and efficient connection between the precast elements.

格鲁泰克巴特克 couplers are known for their high-performance capabilities, making them ideal for large-scale and complex projects like GRAVA. These couplers eliminate the need for traditional lapped splicing, offering a faster and more reliable alternative for connecting and reinforcing concrete structures and precast concrete elements. This not only accelerates the construction process but also enhances the overall durability and safety of the structure.

As the My Home GRAVA project continues to rise and reshape the skyline of Hyderabad, it stands as a testament to the successful collaboration between visionary developers and innovative construction solution providers. 格鲁泰克巴特克 couplers have played a crucial role in the seamless construction of the eight 43-storey towers, contributing to the project’s efficiency, strength, and durability.

该项目不仅承诺提供奢华的生活体验,还为印度卓越建筑树立了新标准,Dextra 的贡献为其成功留下了不可磨灭的印记。

 

CCTV Headquarters, China

CCTV Headquarters, China

The CCTV Headquarters building is a landmark tower located in the Central Business District of Beijing. The tower houses the operations of China Central Television (CCTV) and has been one of the architectural landmarks of the Chinese capital since its completion in 2012.

For this project, Dextra was involved in providing China State Construction Engineering Corporation with an anchoring solution for the columns that ultimately support the building’s bridge-like complex architecture.

Anchoring the structure was particularly challenging due to the building’s height (234 meters) and its distinctive, complex shape. Additionally, since the building is located in a seismic zone, it needed to be constructed to withstand additional loads.

Dextra supplied high-tensile post-tensioning bar systems in large diameters. The post-tensioned system was designed to lock the metallic structure at the base of the mega columns and anchor them into a heavily reinforced mat.

The large PT systems (bars and plates) were equipped with additional corrosion protection accessories, including tubes and injection ports, allowing for grout sealing.

Jumeirah Beach Residence, UAE

Jumeirah Beach Residence, UAE

Jumeirah Beach Residence is a large waterfront residential complex located along the Persian Gulf in Dubai Marina, United Arab Emirates.

The residential area comprises more than 40 towers, many of which reach 40 stories. In total, Jumeirah Beach Residence can accommodate over 15,000 residents.

Dextra Middle East, also based in Dubai, was involved in numerous tower packages between 2003 and 2005.

Foundation Piles

To provide vertical connections in foundation piles, Dextra supplied its popular 巴特克 rebar coupler solution—the most trusted rebar 连接方案 in the Middle East—through its fabrication partners.

As a complement to the couplers, more than 70,000 meters of 索尼泰克 tubes were supplied to the contractor, offering a practical and safe method for assembling sonic tubes and significantly boosting productivity.

筏和柱

巴特克 couplers were also used for horizontal connections in the thick foundation rafts and vertical connections in the protruding columns.

Core Wall-to-Beam 应用领域

In the superstructure, 巴特克 couplers were used for horizontal connections between the core walls and beams.

For this application, couplers were cast into the 心墙, flush with the formwork. A thread protection cap, supplied by Dextra, prevented concrete leakage into the 巴特克 耦合器。

At a later stage, continuation rebars, pre-threaded with 巴特克 threads, were connected into the pre-installed couplers, creating starter bars.

Mecca Mataf Expansion, Saudi Arabia

Mecca Mataf Expansion, Saudi Arabia

Mataf is the area surrounding the Kaaba, the center of the holiest mosque in Islam, located within the Grand Mosque of Mecca. It is where the Tawaf, the counterclockwise circumambulation around the Kaaba, takes place.

The Mataf expansion is a large-scale project aimed at adding 1,300,000 sqm to the existing 400,000 sqm of space. The renovation will feature a new basement and three additional floors, increasing capacity for hundreds of thousands of additional worshippers.

For this significant project, Dextra Middle East has been involved in supplying rebar couplers and anchor solutions.

Mega Columns

For the mega columns, Dextra provided contractors with a solution to connect cages vertically while accommodating potential misalignment. This was achieved using 巴特克 caging assemblies, which allow for a misalignment adjustment equivalent to one bar diameter.

In addition to enabling reconnection, the 巴特克 caging assemblies were also used to temporarily lock the large column template (visible in red in photos) to ensure the correct setup of column reinforcement.

Mega Column Footing

右旋糖苷 巴特克 钢筋锚固板, which use the same type of threads as the couplers, were also installed at the footing of the mega columns to address reinforcement congestion.

The anchors, compact and easy to install, can be set on bars during the final stage of reinforcement installation. In this project, the anchors were installed from the top of the raft onto the vertical bars. More than 100,000 钢筋锚固板 were used in this type of application, appearing as X-shaped reinforcement at the column footing.

Column-to-Beam Connections

For more standard applications, 巴特克 couplers were also used to create horizontal connections between the columns and beams.

The Broadway London, UK

The Broadway London, UK

The Broadway London project consists of six buildings, ranging between 13 and 19 stories tall. This mixed-use development is located between Westminster and Victoria, directly adjacent to St. James’s Park Station, on a 1.7-acre triangular site.

The development includes 268 luxury apartments. Its ground floor will house 25,000 sq. ft. of high-end retail units, while the 1st to 3rd floors will provide 116,000 sq. ft. of prime commercial space. It also features a colonnade between the east and west buildings, with landscaped residents’ gardens on the roof terraces.

Dextra supplied over 20,000 units of 格鲁特克S couplers, installed in 1,200 square and circular precast columns.

格鲁泰克 is a mechanical splicing system designed for the connection of precast elements in compliance with Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO.

Wasl Tower, UAE

Wasl Tower, UAE

The Wasl Tower is a 302m super-high-rise structure in downtown Dubai, surrounded by the Burj Khalifa, the tallest building in the world, and the new City Walk Development.

The tower will feature the world’s tallest ceramic façade, which will help regulate the internal temperature of the building while also reducing surrounding noise.

Moreover, vertical gardens and several shading and cooling design innovations will further minimize the building’s overall carbon footprint.

The project will comprise offices, residential areas, serviced apartments, and a 5-star Mandarin Oriental hotel, along with bars, restaurants, a spa, and a swimming pool.

其结构概念是三个300m高的核心剪力墙连接到四个大型支腿,需要高性能的钢筋连接器来加固和连接混凝土梁和柱。

More than 280,000 巴特克 standard couplers, weldable couplers, 有头条, and 维修夹具 swaged couplers were delivered for this purpose.

图片来源:https://www.unstudio.com/en/page/11705/wasl-tower,https://www.facebook.com/UNStudioArchitecture/