德克斯达集团|可靠的连接

搜索
关闭此搜索框。

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential 巴特克格鲁特克S systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

 

巴特克, renowned for its mechanical splicing capabilities, and 格鲁特克S, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 

The Foundation for Public Housing Development at Pik Wan Road, Hong Kong

 
 

The Foundation for Public Housing Development at Pik Wan Road stands as a testament to Hong Kong’s commitment to sustainable urban development and infrastructure enhancement. Situated amidst the vibrant cityscape, this construction project embodies a convergence of innovative engineering and community-focused initiatives.

At the heart of this endeavor lies the crucial aspect of slope stabilization—a fundamental requirement in Hong Kong’s hilly terrain, where land development often necessitates meticulous attention to structural integrity. Recognizing the significance of this aspect, the project turned to advanced solutions, seeking to marry effectiveness with environmental responsibility.

Enter 右旋糖苷, a renowned provider of engineering solutions renowned for its commitment to quality and innovation. Dextra’s contribution comprised over a thousand pieces of Glass Fiber Reinforced Polymer (GFRP) Soil Nails — a cutting-edge solution designed to address the specific challenges of slope stabilization. GFRP Soil Nails offer superior corrosion resistance, durability, and ease of installation while minimizing environmental impact.

Dextra’s GFRP solutions have earned the esteemed approval of various authoritative bodies in Hong Kong, including the Buildings Department, a crucial entity overseeing building codes, safety standards, and inspections. Additionally, they have garnered recognition from the Hospital Authority, ensuring their reliability and suitability for healthcare infrastructure. Moreover, recognition from the Housing Department and the Construction Innovation & Technology Fund (CITF) signifies their innovative edge and contribution to advancing construction practices in Hong Kong.

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

One Lake Club, Romania

 

One Lake Club, Romania

 

One Lake Club is a prestigious project promises to redefine luxury living in the Romanian capital. It aims to set new standards in urban living, offering residents an unparalleled blend of elegance, comfort, and functionality. The project encompasses a range of residential and recreational facilities, including luxury apartments, lush green spaces, and state-of-the-art amenities. With its ambitious vision and meticulous attention to detail, One Lake Club represents a beacon of modern architectural excellence in Bucharest.

As construction progresses on this ambitious venture, ensuring the structural integrity of the building is paramount. This is where Dextra’s Bartec couplers come into play. Renowned for their reliability and versatility, Bartec BF couplers provide robust connections between reinforcing bars, enhancing the strength and durability of concrete structures. In the case of the One Lake Club project, these couplers are specifically tailored for temporary opening applications, offering flexibility and efficiency in construction processes.

The 12mm Bartec BF couplers serve as the linchpin in the construction workflow, enabling seamless integration of reinforcing bars within the concrete framework. Their innovative design ensures quick and easy installation, minimizing construction time while maximizing safety and performance. By facilitating temporary openings in the concrete structure, these couplers enable efficient access for maintenance, inspection, and future modifications, thereby streamlining the construction process and ensuring long-term durability.

 

Uniqlo & Hive Indonesia Warehouse

 

Uniqlo & Hive Indonesia Warehouse

 

Indonesia’s building construction has spurred a need for rapid and efficient construction methods capable of meeting the demands of a burgeoning population. Precast construction has emerged as a solution to these challenges as it helps minimize on-site labor requirements, accelerates project timelines, and ensures consistent quality.

At the heart of successful precast construction lies the seamless connection between structural elements. Dextra supplied Groutec precast couplers for projects around the world, including Indonesia. Groutec in size 20mm were used in the Uniqlo & Hive Indonesia warehouse building project for joining precast columns, facilitating rapid and reliable assembly while ensuring structural integrity.

The couplers have minimized on-site labor requirements and accelerated project milestones. This not only translates to cost savings but also ensures timely delivery, allowing the building to fulfill its intended purpose sooner. Additionally, the couplers’ high-strength steel composition and stringent quality control measures guarantee robust connections that withstand the rigors of dynamic structural loads.

 

玛哈那空塔

玛哈那空塔

MahaNakhon 塔是曼谷的一座 77 层摩天大楼。它高314米,于2016年成为泰国最高的建筑。 MahaNakhon 位于曼谷最繁忙的商业区是隆 (Silom),位于 BTS 轻轨站 Chong Nonsi 上方。该项目由开发商 PACE 所有,由 Bouygues-Thai 建造。

基础

在曼谷,基金会始终是一个挑战。这座城市建在沙子和潮湿的土壤上,地基必须很深,大多数项目都设有厚厚的 D 型墙,以防止水渗入。

对于 MahaNakhon 的 D 墙,Dextra 提供了 D 墙中使用的钢筋连接器。耦合器安装在钩杆上,水平安装并用混凝土浇筑。这种典型的应用允许在稍后阶段开始板加固时将钢筋重新连接到 D-Wall。

最后,在厚厚的地基垫上还安装了带头钢筋。有头杆是拥挤区域中挂钩的有利替代品,它们提供高性能锚固并且更易于安装。

上层建筑

该塔围绕核心墙建造,采用滑移模板竖立,周围环绕着 12 根巨型柱。为了将柱子与核心墙连接起来,Dextra 向 Bouygues-Thai 提供了著名的 巴特克 解决方案。 巴特克 耦合器与模板齐平安装并用混凝土浇筑,允许第二阶段重新连接钢筋以桥接柱和核心墙。

在巨型柱中,钢筋连接器也用于执行钢筋到钢筋的垂直连接。

空中酒吧

最后,Dextra 提供了 拉杆系统 在屋顶空中酒吧。 拉杆 可以通过叉端轻松安装,并提供美观的锚固系统。

有关 MahaNakhon 的 Dextra 解决方案的更多信息,还提供带有照片的案例研究。

mahanakhon_tower_case_study

下载手册

迪拜夏尔塔

迪拜夏尔塔

Ciel Tower是迪拜码头正在开发的82层高层建筑。该建筑总高 365 米,预计于 2023 年底竣工,届时将成为世界上最高的酒店。

该塔位于码头中心,靠近滨海步道和滨海购物中心购物和娱乐中心等热门景点。它将设有 1,042 间豪华套房,屋顶设有池畔酒吧、餐厅和观景台。

该结构深受垂直生活概念的启发,最大限度地欣赏朱美拉棕榈岛、蓝水岛、迪拜港和阿拉伯湾的景观。

Dextra 已提供 180,000 个 Bartec 连接器,用于连接和增强筏板、柱与梁、板与核心墙、核心墙和起始杆。

夏尔塔是一个非凡的项目,将成为一个新的地标,并进一步提升迪拜作为世界上最受欢迎的旅游目的地之一的声誉。

图片来源:https://www.archdaily.com/931860/ciel-the-worlds-tallest-hotel-is-under-construction-in-dubai-marina,https://propsearch.ae/dubai/ciel-塔

采用预制技术建造的印度最高商业建筑

采用预制技术建造的印度最高商业建筑

Orbit 是一栋 25 层的办公楼,位于海得拉巴 IT 中心的战略位置,采用预制技术建造。它是印度最高的商业建筑,采用预制技术建造。

Aurobindo Realty 建造的 Orbit 大厦荣获 2018 年国际房地产奖-亚太房地产奖“印度最佳办公建筑”奖。

由于该建筑采用预制技术设计,因此还获得了 USGBC 的 LEED V4 金级认证,该认证保证了我们对环境友好和可持续发展的承诺。

Dextra Groutec 在预制构件连接中发挥了关键作用。大约 60,000 个耦合器在预制工厂的预制构件中安装,然后运到现场进行灌浆连接。

Groutec 连接器被广泛使用,以满足世界各地对模块化建筑不断增长的需求,特别是在 Covid-19 爆发期间,对医疗保健和检疫建筑的要求更高。它们的设计和制造符合 Eurocode 2、BS 8110、ACI 318、IBC 和 AASHTO。

图片来源:https://www.aurobindorealty.com/portfolio/orbit/

IFC(国际金融中心)二期|环球贸易广场

IFC(国际金融中心)二期|环球贸易广场

国际金融中心二期是香港的地标性摩天大楼,位于西九龙。该商务楼高412米,共88层。它是香港第二高的建筑,仅次于环球贸易广场。

根据定义,垂直加固是该高度建筑物的一个关键特征。顾问 ARUP 和承包商 E-Man-Sanfield JV 选择 Dextra 来拼接整个建筑物的钢筋。

对于该项目,Dextra 提供了超过 200,000 个钢筋连接器。这些用于在结构上执行大多数垂直连接,特别是所有柱子。

钢筋连接器还为第二阶段钢筋重新连接提供连接点。通常在柱和板之间以及柱和梁之间。为此,钢筋连接器水平对齐并用混凝土浇筑。仅在稍后阶段通过拧入第二阶段钢筋来进行重新连接。

巴特克 是香港承包商首选的钢筋拼接解决方案,因为该解决方案被列入香港建筑材料清单中推荐的解决方案。Dextra还在香港经营自己的钢筋穿丝车间,为客户提供钢筋准备服务。

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。