德克斯达集团|可靠的连接

搜索
关闭此搜索框。

Montenegro viaducts built in seismic environment

The Bar-Boljare Highway is a key infrastructure project in Montenegro led by the Ministry of Transportation and Maritime Affairs and built by China Road and Bridge Corporation (CRBC). The 2×2 lanes highway spans over 40km, in seismic environment.

iNGEROP, the consulting firm on the project, required the rebar couplers to comply with ISO 15835 requirements (cyclic requirements as per class S2). For that reason, CRBC chose Dextra Bartec® solution for reinforcement connection.

Learn more about this project

Soft-Eyes installed at Singapore Marine Terrace Station

Four large diameter soft eyes have been installed in the diaphragm wall cages of the new Singapore MRT Marine Terrace Station during August 2017.

Soft-Eye 由 GFRP 钢筋制成,用于替代施工竖井 D 墙中的钢筋。当隧道掘进机 (TBM) 突破 D 形墙时,它可以轻松切割 GFRP 钢筋,从而节省项目进度时间和设备使用费用。

自 1998 年在曼谷地铁项目首次使用以来,Dextra 一直是该应用的先驱,并且在 Soft-Eye 的内部设计和制造方面拥有丰富的经验。

The D-Walls installed on Terrace Station also feature Bartec® rebar couplers, a common application which allows for the horizontal re-connection of the station slabs.

Left: Part of the Soft Eye with overlap between steel & GFRP
Right: Bartec couplers in the D-Wall will be used for slab reconnection.

Left: Raising the Soft Eye in position
Right: Vertical position. Circular shape of the TMB breakthrough target is visible in light color.

Learn more about Soft eyes

船用拉杆的新设计工具!

船用拉杆解决方案一开始似乎让人不知所措,因为码头墙的类型、锚固类型以及它们与拉杆的连接方式有很多种。

为了指导设计师创建完美的码头结构,Dextra 开发了一个全面的 AutoCAD 工具逐步调色板,以补充我们的 船用拉杆技术指南。这款新工具具有我们完整的直径、材质等级和配件系列。


我们希望这个新的 AutoCAD 工具将加快您对我们系统的理解和您的结构设计。对于所有问题,Dextra Bar Systems 的专业工程团队随时为您提供系统选择和绘图方面的支持。

示范


无法访问 YouTube?下载工具文档以了解其使用方法>> 下载(PDF)

如何开始?

1.下载并安装AutoCAD调色板.zip >> 下载(需要注册)
2.下载并打开Dextra船用拉杆技术指南>> 下载(需要注册)
3. 收集您的项目负载并在我们的技术指南中确定您的项目所需的 M 尺寸和等级。
4. 在 AutoCAD 中,按照应用程序文档中详细说明的分步方法进行操作。该应用程序将帮助您根据项目的墙壁类型选择正确的配件。现在画一个完整的系统。
5. 只需选择您想要指定的块(棒材、螺纹、附件),即可直接在 AutoCAD 中生成并添加规格注释。

曼谷丰富多彩的运动夏季!

我们的曼谷工厂连续举办了两场体育赛事,这是一个多事的夏季体育赛事,各支球队证明了他们的团队精神和获胜的动力!

Suan Luang 2017 “百特慈善跑” – 2017 年版

Awards
Running event at Suan Luang
Running event at Suan Luang
9 月 3 日星期日2017 年,Dextra 泰国团队在距离 Dextra 主工厂不远的大型公园 Suan Luang Rok 9 举行的“Baxter Run for Fund 2017”活动中,排起了 57 名跑步者。所有 Dextra 跑步者都参加了 2 个距离的比赛:5 公里和 10 公里。

跑步感觉很好,但也有好处!本次活动的所有收益(总共 1,800 名跑步者)将捐赠给以下泰国慈善机构:

更多信息: 主办方网站

DMFL 杯 – 2017 年版

Awards

Football event Dextra六月、七月、八月,共有7个Dextra部门和生产队参加了Dextra制造足球联赛“DMFL”的角逐!虽是一场激烈的角逐,但决赛已决出胜负:恭喜“质量认证&车钩生产”联盟团队在本次比赛中夺冠,再次证明质量与生产齐头并进,创造了优异的成绩!

第一名:质量认证和耦合器生产团队

第二名:门店团队

第三名:设备维修组

新的 Groutec“S”系列甚至适合薄的预制元件

Groutec S

Dextra 扩展了 Groutec 的产品范围,其钢筋接头专为快速轻松地连接预制构件而设计。

新型 Groutec S(“Slim”)具有较窄的机身,即使在非常薄的预制板、墙壁或柱子中也适用。由于其紧凑的设计,Groutec S 还可以额外节省灌浆砂浆的费用,使其使用更加经济。

对于需要更大公差的承包商来说,Groutec 标准系列(更名为 Groutec L)仍然可用。

有关 Groutec 以及访问 Tekla、Revit 和 AutoCAD 模型的更多信息,请参阅专用产品页面

关于格鲁泰克

Awarded at Mumbai CIA World Builders & Infra 2017

Awards Dextra has been awarded “Best Company in innovative construction methodology” at the ceremony of the CIA World Builders & Infra 2017. This award acknowledges the technical solutions brought by Dextra to the Indian construction industry in the recent years. Mr. Suniil Desai, General Manager of Dextra India, received the award at the ceremony.

Awards
Dextra has more than 16 years presence in the construction Indian market, offering its full construction range, including Concrete Reinforcement splicing systems (Bartec) and equipment, Tension Bars solutions, Post Tensioning Solutions, and new innovative Ground Anchoring solutions coming in steel and FRP material.

For more information, please contact Dextra India Mumbai office
Dextra India's General Manager receiving the CIA award
Dextra India's General Manager delivering a speech

使用后张拉杆系统加固公路梁

后张法 杆系统是高度可定制的多功能解决方案,可在桥梁/高架桥施工中实现多种应用。

Dextra 最近提供了定制 PT棒 曼谷东北部 Bang Pa In – Saraburi – Nakhon Ratchasima 高速公路上使用的预制梁段加固系统。

后张紧杆系统,由直径 36 毫米的热轧变形高强度钢筋(FT 钢筋)制成,可对预制节段进行垂直加固,每个梁元件最多可配 14 组。

每个杆在地面上时都将从每个元件的顶部顶起并承受所需的张力。之后,梁被提升并安装到最终位置。

通过在杆周围的镀锌管道中填充水泥浆,可以实现永久的腐蚀保护。

有关全螺纹杆系统的更多信息

Tallest tower in Vietnam on the rise!


The tower, whose construction started end of 2014, is expected to reach the height of 461 meters, a new height record in Vietnam. Landmark 81 will the 11th tallest tower building in the world.
对于这个项目,Dextra 提供了其著名的 巴特克 solution to contractor Coteccons. 巴特克 rebar coupler solution has been approved by ARUP, owner’s representative consultant, and MACE International, structural consultant.

Read full project article

Coupler attributes upgraded for Tekla 2017

Dextra recently released an update of all its rebar coupler tools to upgrade to latest version of Tekla.

New Tekla version now allows clear visualization of threaded bar ends, allowing to see the extended threads for first phase rebar for example.

Tekla attributes are available to download from Dextra website.

Download Tekla attributes

Paying respect to King Rama IX

Employee of Dextra prior to the ceremony

Management and employees from all offices of Dextra Group in Thailand attended an official ceremony, Dextra being host of Funeral prayers to “His Majesty The King Bhumibol Adulyadej, King Rama IX’s Royal remain” (who had passed away on the 13th October 2016), at “The Dusit Maha Prasart Throne Hall”, on Thursday the 25th of May 2017 at 17:00 hrs.

This official ceremony was presided by Mr. Jean-Marie Pithon, Group Chairman and CEO, Mr. Frederic Pagniez, Managing Director of Dextra Industry & Transport and Mr. Jean-Jacques Braun, Technical Director of 德克斯特拉制造, accompanied by a delegation of 47 employees from Dextra affiliates in Thailand.

The mourning ceremonies in Bangkok will continue to allow the people of Thailand to pay their respects to His Majesty The Late King at the Royal Palace, until the national cremation takes place on Thursday, the 26th October 2017. This day was proclaimed national holiday in Thailand.

 

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。