新尚普兰桥

新尚普兰桥

The New Champlain Bridge is a 3 km-long bridge spanning the Saint Lawrence River at the southeastern entrance of Montreal, Quebec, Canada. As one of the busiest bridges in Canada, it plays a crucial economic role for the city, serving as a key route to the United States, located 60 km south.

 

Replacing the Older Champlain Bridge

The New Champlain Bridge is replacing the existing Champlain Bridge, which was commissioned in June 1962. The older structure began showing signs of corrosion in 1994. After several temporary safety measures were implemented to keep the bridge operational, a replacement project was initiated in 2007. For a time, both bridges will stand side by side until the older structure is fully dismantled, with most of its materials planned for recycling.

 

A Focus on Corrosion Resistance

The New Champlain Bridge is designed to last at least 125 years and accommodate 50 million vehicle crossings per year. Given the corrosive environment caused by frequent road de-icing, corrosion resistance was a top priority. Duplex stainless steel rebar was installed in critical areas to enhance durability.

For this project, Dextra recommended using Duplex Stainless Steel Rolltec couplers and anchors. This specialized version of our Rolltec® system replaces standard couplers and anchors with an improved duplex steel alternative, offering superior corrosion resistance.

The Rolltec® solution is well-suited to the Canadian market and is approved by the Quebec Ministry of Transport. With a single-operator threading machine and 30-second threading cycles, it provides high productivity, making it ideal for high-labor-cost markets like Canada.

More than 10,000 Stainless Rolltec® couplers were supplied for this project, primarily for bridge spans. These couplers were used to splice large-diameter reinforcement bars, ranging from 35M (#11) to 55M (#18)—the largest size available in our Rolltec® range.

Additionally, about 10,000 Rolltec® stainless steel end anchors were delivered for sizes up to 55M (#18). Rolltec® Headed Bars use the same threading system as the couplers, simplifying production and installation.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。