德克斯达集团|可靠的连接

那格浦尔地铁,Reach-1(1 号线)

那格浦尔地铁,Reach-1(1 号线)

Nagpur, the second capital of Maharashtra and one of the fastest developing cities in India, is witnessing major growth in terms of infrastructure. The development primarily focuses on connectivity, with the Metro rail playing a major role.

Launched in 2016, the metro project has been widely praised for its speed of execution and the quality of construction.

Within the city boundaries, the project requires the highest safety standards, including seismic analysis for structural integrity throughout its service life.

Project Requirements

The fast-track project features a typical structure for its Line 1 alignment, where the viaducts support two levels of pathways: the lower one for NH-7 and the upper one for the metro rail.

Impact loading due to train movement was a major concern. Since the stretch is always busy with traffic, a solution was required that would not require revising the existing design. Additionally, minimizing delays to this fast-moving project was critical, a concern shared by all stakeholders, especially the General Consultant (GC), who sought to maintain project agility while ensuring a sustainable solution.

Solution

Dextra introduced Shear Key Bars for the priority section, allowing the structure to neutralize seismic forces. This not only helped the contractor complete the work faster but also enabled the client to conduct the trial run earlier than expected.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。