Mumbai Metro Line 2B, India

 
 

Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of 铬棒1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。