轻轨3号线
The 37km-long Light Rail Transit Line 3 (LRT3) is a light rail line under development in Malaysia. It includes a 35km viaduct and a 2km underground tunnel which will link Bandar Utama with Johan Setia in Klang.
LRT3 是根据大吉隆坡/巴生谷 (GKL/KV) 陆地公共交通总体规划而开发的,将在将铁路连接延伸至 GKL/KV 西部走廊方面发挥战略作用。
Dextra provided cuttable Glass Fiber Reinforced Polymer (GFRP) soft-eye solutions, installed in diaphragm walls of escape shafts, in order to facilitate the underground tunnel breakthrough by the Tunnel Boring Machines (TBM).
LRT3 项目预计将为巴生谷西部走廊(从巴生到八打灵再也)沿线的 200 万人提供服务,改善连通性、缓解交通拥堵并刺激经济增长。
该工程预计于 2024 年 2 月完工。