德克斯达集团|可靠的连接

搜索
关闭此搜索框。

沙头角污水处理厂扩建工程第一期

沙头角污水处理厂扩建工程第一期

The Sha Tau Kok Sewage Treatment Works Phase 1 Expansion project stands as a testament to Hong Kong’s commitment to environmental sustainability and efficient wastewater management. It aims to increase the treatment capacity, ensuring that the city’s sewage is processed efficiently and in an environmentally responsible manner. A remarkable feature of this expansion is the use of Groutec S couplers to seamlessly link precast columns of the building.

Groutec is designed for the efficient and easy installation of precast concrete elements, reducing construction time and labor costs while providing full structural connection. For this project, Groutec S diameter 32mm precast couplers have been used to connect precast columns in vertical applications. The Groutec coupler is installed in the bottom element, and then grout is poured by gravity directly into the coupler cavity. This process ensures the structural integrity and longevity of the facility.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。