德克斯达集团|可靠的连接

搜索
关闭此搜索框。

Dextra’s Quarterly Newsletter: Connection #31


Visit us at BAUMA on October 24-30, 2022

Dextra is participating to the 33rd edition of BAUMA, the world’s leading trade fair for the construction industry, to be held in Munich, Germany on October 24-30, 2022.

 

Our team of professionals from around the world is delighted to welcome you at stand no. 506, Hall C3.

 

Discover our latest technologies, solutions and iconic projects.

•  混凝土加固

•  酒吧系统

•  地面工程

w660_13108689_hinkleypoint01
w660_13108687_bezonsbridge01
w660_13108688_groundproject01

Dextra offers the most comprehensive range of rebar couplers for cast-in-place, repair and precast applications.

High-performance bar systems for roofs and façade support, bridges tensioning and marine structures anchoring.

Steel and composite (FRP) anchoring solutions, suitable for a variety of geotechnical applications.

Stadium 974 (formerly Ras Abu Aboud Stadium), a football stadium in Doha, Qatar, is a temporary venue made from 974 recycled shipping containers that will host matches during the 2022 FIFA World Cup, after which it will be dismantled. It is the FIFA World Cup’s first temporary venue.

The stadium has a modular design, with 974 recycled shipping containers symbolizing Qatar’s dialing code, removable seats and other modular building blocks.

It will host seven matches during the 2022 FIFA World Cup in November before being entirely dismantled and repurposed after the event.

Dextra is proud to be a part of this iconic project, supplying more than 600 sets of carbon steel tension rods for the cross-bracing of the roofing and bowl structures, as well as the stairway, catwalk, and ramps.

Stadium 974 not only symbolizes the country’s commitment to sustainability, but it also sets a new standard in sustainable construction design.

More about our latest projects

w660_13061756_th_qsncc_slider2
w660_13072176_ae_mugharraqport_slider2
w660_13072200_hk_shatincavern_slider2

Queen Sirikit Convention Center Renovation, Thailand

Bartec couplers were used for the connection of columns, beams, d-walls, and core walls

Mugharraq Port Marine Development, UAE               

407 tons of marine tie bars were used to connect sea walls to anchor walls.

Relocation of Sha Tin STW to Caverns, Hong Kong

Cut-able GEOTEC™ GFRP rock-bolts were supplied for the tunnel’s temporary support.

Benefit from our libraries of CAD and BIM tools!

Dextra always strive to provide you with smart solutions for all construction projects, including digital tools to facilitate the detailing stage.

 

Feel free to contact our team of CAD/BIM specialists for any additional support:

 

[email protected]

Thank you for visiting us at:

World Tunnel Congress 2022, Denmark 2-8 September

Tunnelling Asia’ 2022, India 27-28 June

We would like to thank all our clients and visitors for taking their time to visit our stand.

It was our pleasure and honor and we enjoyed many inspiring conversations.

If you have any queries or need more information, please contact us at [email protected]

We look forward to being of service to you.

请输入您的信息

联系我们

   与我们分享您的信息,我们会尽快回复您。