德克斯达集团|可靠的连接

香港仔海港扩建工程

香港仔海港扩建工程

Aberdeen Harbour, one of the UK’s oldest and busiest ports, serves as a key hub for the oil and gas industry in north-west Europe, with connections to 40 countries.

The expansion of the South Harbour aims to enhance and diversify the port’s capabilities, making it the largest port in Scotland in terms of berthage. The project includes dredging Nigg Bay, constructing two breakwaters, and developing new quays on the north and west sides of the bay.

Dextra provided a practical solution for concrete integrity testing of the 35-45m deep bored piles supporting the harbour structure. The contractor, Dragados, used Sonitec 声波管 (50mm and 100mm) for inclinometrics and coring purposes.

Sonitec system, equipped with enlarged bell-mouth ends, facilitates the easy connection of long tubes for reinforcement cages. Once lowered into the hole and filled with concrete, the tubes were used for ultrasonic cross-hole testing, complying with ASTM D6760 standards.

This expansion enhances opportunities for existing customers and opens doors to new markets, future-proofing the port’s ability to support economic growth in Aberdeen and the surrounding region.

相关解决方案

专业知识

在客户旅程的每一个时刻,Dextra 团队都致力于生产智能施工解决方案,使我们的客户在其施工现场达到更高的生产力和安全水平。

Dextra 在几大洲拥有实物库存,并通过我们经销商的当地库存在每个国家进行补充。凭借这个扩展的网络,Dextra 确保无论我们的合作伙伴身在何处,我们的产品始终触手可及。

对于需要定制的解决方案,Dextra 还可以超越我们的标准交付时间,提供加速交付方案。请咨询我们以获取更多信息。

Dextra 完全拥有位于曼谷(泰国)、广州(中国)和浦那(印度)的 3 个主要工业基地的制造设施和工艺。这使我们能够完全控制我们的运营时间和所产生的解决方案的质量。

Dextra 的曼谷主工厂设有一个独立认可的材料测试实验室,已通过 ISO-IEC17025 认证,可以对材料和产品进行测试。

Dextra 旨在提供超越最严格的国际技术认证的产品,我们的目标是通过满足客户的需求和指定要求来创造最大的客户满意度。