กลุ่มเด็กพิเศษ | การเชื่อมต่อที่เชื่อถือได้

ค้นหา
ปิดช่องค้นหานี้
ค้นหา
ปิดช่องค้นหานี้

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory, Thailand

 

Nestlé LEO Factory’s reliance on precast elements necessitated a reliable, efficient method for joining the precast structure of the building. The construction utilized Groutec F, a well-known splicing system engineered by Dextra, to meet the exacting demands of the precast building. Groutec F allows for the connection of rebars without the need for bar end preparation and was used for the precast joint connection of beam and column in this project.

Groutec F is a fully grouted connection solution, ensuring robustness and durability in the face of dynamic operational environments. Engineered and manufactured in compliance with industry-leading standards such as Eurocode 2, BS 8110, ACI 318, IBC, and AASHTO, Groutec F guarantees adherence to rigorous structural specifications. It is compatible with major non-shrink grout brands readily available on the market, reducing logistical complexities and procurement lead times.

 

กรุณากรอกข้อมูลของคุณ

ติดต่อเรา

   แบ่งปันข้อมูลของคุณกับเรา แล้วเราจะติดต่อกลับโดยเร็วที่สุด