กลุ่มเด็กพิเศษ | การเชื่อมต่อที่เชื่อถือได้

ค้นหา
ปิดช่องค้นหานี้
ค้นหา
ปิดช่องค้นหานี้

Dextra Undergoes ISO 19443 Audit with Bureau Veritas

At Dextra, we are committed to maintaining the highest standards of quality and safety in the nuclear industry. Our manufacturing plants in Thailand and India are currently being audited by Bureau Veritas for the prestigious ISO 19443 Nuclear Certification.

This marks a renewal of the certificate for our Thailand factory, reaffirming our long-standing commitment to excellence, and a new milestone for our India factory, as it undergoes this certification process for the first time.

Why Bureau Veritas?

Bureau Veritas is a global leader in testing, inspection, and certification, with nearly 200 years of experience.

Their reputation for technical expertise, high quality, and integrity makes them the ideal partner for our certification process.

Here are a few reasons why we chose to work with Bureau Veritas:

  1. Unmatched Expertise: Bureau Veritas has a long-standing history of providing top-notch services in quality management and certification. Their deep-rooted knowledge and experience in the nuclear sector ensure that we are in capable hands.
  2. Global Reach: With a presence in over 140 countries, Bureau Veritas offers a comprehensive understanding of international standards and practices. This global perspective is crucial for our operations in Thailand and India.
  3. Commitment to Sustainability: Bureau Veritas is dedicated to promoting sustainable practices. Their focus on environmental responsibility aligns with our own commitment to sustainability and quality.

The Audit Process:

The audit by Bureau Veritas involves a three-week, thorough examination of our quality management systems, safety protocols, and operational procedures. This rigorous process ensures that we meet the stringent requirements of the ISO 19443 standard, which is specifically designed for the nuclear industry.

Looking Ahead:

We are confident that this audit will further solidify our position as a leader in the rebar coupler manufacturing industry.

Achieving ISO 19443 certification will not only enhance our credibility but also provide our customers with the assurance that they are receiving products of the highest quality and safety standards.

 

Stay tuned for more updates on our certification journey.

We extend our gratitude to Bureau Veritas for their meticulous audit process and to our dedicated teams for their hard work and commitment.

PC Headed Bars Achieves AFCAB & CARES Certifications

We are thrilled to announce that our new generation of PC (Pressed Connection) Headed Bars has received certification from both AFCAB in France and CARES in the UK!

AFCAB has certified our model 9D (double chamfer) for general applications. Meanwhile, the CARES TA1-B&C certificate no. 5071 has certified both our models 9D and 9A (single chamfer). These CARES certifications cover a wide range of applications, including general and nuclear construction, showcasing the exceptional performance of Dextra’s product solutions.

Dextra PC Headed Bars, ranging from 10mm to 20mm, feature a circular plate forged to the end of the reinforcing bar. The headed bars meet Eurocode requirements with a load-bearing area at least 9 times the cross-section of the reinforcement bar.

Note

  • The previous UK Cares certification is now renamed to CARES.
  • CARES certification does not cover seismic performance. TA1-B is designated for general applications, while TA1-C is for nuclear applications.
  • The headed bars meet Eurocode requirements concerning load-bearing area.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Construction Excellence with Unmatched Tools and After-Sales Support

The Dextra After-Sales Service Advantage: Winning the Battle for Construction Excellence

In the construction industry, achieving excellence requires more than just high-quality tools and components—it demands exceptional support to ensure optimal performance throughout the project lifecycle. Rebar couplers, vital for creating strong and reliable connections between rebars, exemplify this principle when paired with the unmatched after-sales services provided by Dextra.

Why Rebar Couplers Matter

Rebar couplers are safety-critical components that play a crucial role in the structural integrity of construction projects. These components must meet rigorous certification standards to ensure reliable performance. Dextra has earned its reputation as a trusted provider of rebar couplers by adhering to stringent quality control processes and achieving an extensive list of local and international certifications. This commitment to quality ensures that every Dextra coupler contributes to the strength, durability, and safety of the structures they support.

Dextra’s Commitment to Excellence

  • Unparalleled Quality and Reliability

Dextra’s rebar couplers are manufactured under strict quality control standards, incorporating thorough testing and inspection procedures that exceed certification requirements. This dedication to excellence ensures that each coupler is a reliable link in the chain of construction safety.

  • Innovative Equipment for Peace of Mind

Dextra’s CE-marked bar-end preparation equipment is designed with non-destructive proof loading tests (NDT) that verify every connection or thread before it reaches the site. This advanced testing capability provides contractors with the confidence that every connection meets the highest standards of safety and performance.

The Dextra After-Sales Advantage

  • Global Support Network

With a team of 45 engineers managing over 600 equipment sets worldwide, Dextra offers unmatched customer support. Whether through on-site assistance or remote digital solutions, Dextra ensures that clients have access to the resources they need, when and where they need them.

  • Cutting-Edge Digital Tools

Dextra’s embrace of IoT (Internet of things) and real-time digital solutions enhances its after-sales services. The Dextra Monitoring System (DMS) software provides clients with detailed insights into equipment performance, production data, and potential issues. This proactive approach enables Dextra to address problems before they arise, ensuring uninterrupted operations and maximum efficiency.

  • Tailored On-Site Support

Recognizing the importance of minimizing downtime, Dextra’s engineers provide on-site support to keep equipment running at peak performance. This hands-on approach helps contractors avoid project delays and maintain tight schedules.

  • Comprehensive Service Packages

Dextra’s service offerings extend beyond equipment maintenance. From training and analysis to quality assurance, Dextra provides an integrated suite of solutions that optimize every aspect of the rebar coupling process.

  • A True Partnership

Dextra’s holistic approach to rebar coupling and after-sales support sets it apart in the construction industry. By maintaining end-to-end control—from manufacturing to on-site support—Dextra ensures consistency, quality, and reliability at every stage. Furthermore, Dextra’s collaborative approach fosters strong partnerships with clients, enabling them to achieve construction excellence with confidence.

Conclusion

Rebar couplers are integral to the safety and stability of construction projects, and their performance is enhanced by the support of a trusted partner like Dextra. With industry-leading quality standards, innovative equipment, and comprehensive after-sales services, Dextra provides contractors with the tools and support they need to succeed.

When the battle for construction excellence is fought, Dextra stands as the ally that ensures victory—offering not just the best tools, but unmatched support that sets the standard for the industry.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

ระบบ Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of ซีอาร์ บาร์ 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 
 

Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying Fortec+ couplers, along with steel rock bolts, expandable friction bolts, umbrella pipes, and post-tensioning bars for tunneling works. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.

The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques. Dextra’s Fortec+ couplers, used in locations such as precast panels, tunnel access points, and driveways, contributed significantly to the project’s structural integrity and long-term performance. The Fortec+ system includes a rebar preparation process in which the threaded bar end is proof tested with a tensile load, ensuring non-destructive testing within the elastic zone of the reinforcing bar.

 

Image credit: Central Kowloon Route – Highways Department

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential บาร์เทค และ Groutec S systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

 

บาร์เทค, renowned for its mechanical splicing capabilities, and Groutec S, designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Pattullo Bridge Replacement, Canada

 

Pattullo Bridge Replacement, Canada

 
 

Dextra has proudly contributed to the construction of the Pattullo Bridge Replacement project in Canada, a vital infrastructure project that will enhance connectivity between Surrey and New Westminster. As part of this ambitious endeavor, Dextra supplied 100,000 บาร์เทค couplers, ensuring robust and reliable rebar connections from the bridge’s foundations to its towering pylons.

ระบบ บาร์เทค couplers, known for their high performance and ease of installation, were integral in providing the necessary strength and durability required for this long-term infrastructure. Dextra’s involvement in the Pattullo Bridge project underscores the company’s commitment to delivering innovative solutions that support large-scale construction efforts worldwide. As the new bridge takes shape, it stands as a testament to the importance of reliable engineering components in building the infrastructure of tomorrow.

Unveiling Durabar Carpet – The Future of Construction Versatility

Dextra is thrilled to announce the launch of the Durabar Carpet, the latest in our line of cutting-edge construction solutions. Crafted from our patented Durabar GFRP rebar, this innovative product is set to revolutionize the construction industry with its unmatched versatility and efficiency.

A New Era in Construction

The Durabar Carpet stands out not only for its robust design but also for its adaptability across various construction projects.

The real game-changer, however, lies in its ability to be effortlessly cut in any direction, allowing for precise adjustments and minimizing material waste. This feature is particularly beneficial in complex projects where customization is key.

Key Features:

  • Bar Diameter: Available in sizes ranging from Ø 6mm to Ø 16mm.
  • Standard Length: 5.8 meters, perfect for most applications.
  • Custom Lengths: Tailor the product to your needs with lengths available from 2 meters to 5.8 meters.
  • Flexible Spacing: Select spacing from 100mm to 600mm, offering maximum design freedom.

Whether you’re working on a large-scale infrastructure project or a bespoke architectural design, the Durabar Carpet offers the flexibility and performance you need.

Why Choose Durabar Carpet?

The advantages of using Durabar Carpet in construction projects are clear. Not only does it simplify logistics and reduce waste, but it also provides engineers and builders with the freedom to customize their approach to reinforcement. The product’s ability to adapt to various requirements makes it an indispensable tool in modern construction.

As the construction industry continues to evolve, Dextra remains at the forefront, delivering innovative solutions that address the needs of today’s builders. The Durabar Carpet is more than just a product – it’s a testament to Dextra’s commitment to pushing the boundaries of what’s possible in construction.

Experience the future of construction with Durabar Carpet.

For more information, learn more about Durabar or contact us today.

กรุณากรอกข้อมูลของคุณ

ติดต่อเรา

   แบ่งปันข้อมูลของคุณกับเรา แล้วเราจะติดต่อกลับโดยเร็วที่สุด