กลุ่มเด็กพิเศษ | การเชื่อมต่อที่เชื่อถือได้

สนามคริกเก็ตปูเน่

สนามคริกเก็ตปูเน่

The Pune Cricket Stadium is a cricket venue located near the city of Pune in the state of Maharashtra, India.

Designed by the British firm Hopkins Architects, the stadium was built between 2010 and 2011.

With a seating capacity of 37,400, the stadium offers spectacular views of the surrounding mountains.

For this project, Dextra engineered and supplied the แท่งแรงดึง suspending the roof of the building in 2012.

The long architectural bar systems are anchored to steel pylons and support the roof structure.

ระบบ แท่งแรงดึง sets were supplied in steel grade 460. Each tendon consists of several bar segments spliced together using either couplers (for fixed lengths) or turnbuckles (for length adjustment and tensioning).

รวมแล้วกว่า 50 ตัน แท่งแรงดึง anchor the roof structure of the Pune Cricket Stadium.

เขื่อนไซยะบุรี

เขื่อนไซยะบุรี

ระบบ เขื่อนไซยะบุรี is a hydroelectric dam located in northern Laos. Planned to begin operations in 2019/2020, it is the first of 11 dams planned in the lower Mekong region. The dam is expected to generate 1,285 MW of electrical capacity.

For this remote construction site, a Bartec rebar preparation equipment set was delivered in its container. A total of 120,000 rebar couplers were used on the project over a two-year period.

Mumbai Chhatrapati Shivaji Airport

Mumbai Chhatrapati Shivaji Airport

Mumbai Chhatrapati Shivaji International Airport is the primary airport serving international airports to Mumbai. It is the second airport in India in term of passenger traffic.

Dextra มีส่วนร่วมในการก่อสร้างอาคารผู้โดยสาร 2 และโครงสร้างที่เกี่ยวข้อง ซึ่งเกิดขึ้นระหว่างปี 2552 ถึง 2556

For Mumbai Airport, Dextra delivered its popular บาร์เทค rebar coupler solution, which is the primary rebar coupler used on large projects in India.

Dextra operates its own threading yard in Mumbai and took responsibility for the rebar preparation for this project.

ในสถานที่ก่อสร้าง บาร์เทค was used extensively for vertical connections (bar-to-bar vertical column connections) as well as horizontal applications (column-to-beam), typically for reinforcement of ⌀32mm. บาร์เทค offers an exceptional level of performance, ensuring “bar break” performance on the rebar used at Mumbai Airport.

For the contractor (Larsen & Toubro on this project), บาร์เทค เสนอวิธีที่ง่ายและคุ้มค่าในการเชื่อมต่อเหล็กเส้น

Thanks to its parallel thread technology and rebar prepared with various thread lengths, it requires the same coupler for both standard applications (when one bar can be rotated inside the coupler) and positional applications (when no bar can be rotated). This is a convenient feature that simplifies stock management and prevents product mismatches on site.

การขยายสถานีรถไฟ Madrid Chamartín Clara Campoamor

การขยายสถานีรถไฟ Madrid Chamartín Clara Campoamor

The Madrid Chamartín Clara Campoamor Railway Station expansion is one of the largest infrastructure projects in Spain. The expansion project aims to increase the capacity of the railway station and improve the overall passenger experience. Dextra supplied 60,000 linear meters of โซนิเทค, a crosshole sonic logging (CSL) testing tube, for the piling work of the project.

Madrid Chamartín Clara Campoamor Railway Station is one of Spain’s busiest railway stations, serving more than 60 million passengers each year. The expansion project was necessary to accommodate the increasing demand for train services in the city. The project involved the construction of new platforms, tracks, and passenger facilities.

Dextra, a leading supplier of construction solutions, was chosen to supply the โซนิเทค crosshole sonic logging (CSL) testing tube for the piling work of the project. The Sonitec tube is a highly advanced system that enables precise and accurate measurements of pile integrity. The system employs crosshole sonic logging technology to assess pile conditions, ensuring they are strong enough to support the weight of the railway station.

Using the โซนิเทค crosshole sonic logging testing tube enabled the construction team to carry out the piling work with confidence and ensured the structural integrity of the piles. The system provided real-time data on pile conditions, enabling the construction team to make informed decisions and implement any necessary adjustments during the construction process.



เครดิตรูปภาพแบนเนอร์: UNStudio, b720 Arquitectura และ Esteyco

การขยายโรงกลั่นน้ำมันจัมนาการ์

Jamnagar Refinery Expansion: The World’s Largest Refinery by Production Capacity

Located in Gujarat, western India, the Jamnagar Refinery is the largest refinery in the world by production capacity. Owned by Reliance Industries, it was commissioned in 1998 and spans a vast 50 km² area.

For Phase 3 alone, more than 305,000 tons of steel การเสริมแรง were used in a 36-month project, involving over 100,000 engineers and construction workers.
Dextra has been involved in Jamnagar since the early phases, supplying rebar splicing solutions for Phases 1, 2, and 3 of the project.

Dextra’s Rebar Splicing Solutions for Phase 3:

Three rebar coupler solutions were used in Phase 3:

  • Bartec Solution
    Used for cast-in-situ applications, including bar-to-bar connections in foundations, pile cages, and column cages.
    Also utilized in heavily congested rafts and pile caps to facilitate efficient การต่อทาบเหล็ก.
  • Groutec Couplers
    Applied to pipe racks, which were constructed from คอนกรีตหล่อสำเร็จ elements in a dedicated คอนกรีตหล่อสำเร็จ factory within the project.
    Positioned in the bottom elements and filled with grout, eliminating the need for in-situ wet จุดต่อ and ensuring fast, secure connections between beams and columns.
  • Unitec Couplers
    Used in applications where rebar length was too short to allow traditional overlap connections.

image06

โอลิมปิกเวโลโดรม

โอลิมปิกเวโลโดรม

The Olympic Velodrome, now renamed Lee Valley VeloPark, is a multipurpose sports facility located in East London. The facility was initially built to host the 2012 London Olympics and Paralympics. It still features road courses and BMX tracks and hosts international cycling competitions.

For this project, Dextra delivered the กริปเทค rebar splicing solution to contractors Sir Robert McAlpine and Byrne Construction.

ระบบ กริปเทค splices were mostly used to provide vertical rebar connections in the velodrome columns.

Our กริปเทค solution was supported by Dextra’s local distributor in London, which houses the Dextra กริปเทค equipment required for the extrusion of the กริปเทค sleeves onto the rebar.

กริปเทค is a CARES TA1-A, TA1-B, and TA1-C approved solution, making it suitable for even the most advanced rebar splicing applications and stringent project requirements.

ช่องทางบรรเทาอุทกภัยจิซาน

ช่องทางบรรเทาอุทกภัยจิซาน

ระบบ ช่องทางบรรเทาอุทกภัยจิซาน is an ongoing infrastructure project in Jizan Economic City, Saudi Arabia.

Located along the coastline, the city is at risk of flooding due to frequent torrential rainfall. The flood channel plays a crucial role in protecting downstream areas from major flood damage.

As the channel will be exposed to seawater and environmental contaminants that can accelerate steel corrosion, Dextra ASTEC glass fiber-reinforced polymer (GFRP) rebar was chosen as the ideal solution for the project. Nearly 2 million meters of GFRP rebar were supplied.

ASTEC GFRP rebar is a corrosion-free, non-metallic reinforcing bar that offers higher tensile strength than steel while being significantly lighter in weight.

Upon completion, this project will be the world’s largest construction using GFRP rebars as concrete reinforcement.

สนามบินนานาชาติฮ่องกง อาคาร 2

 

สนามบินนานาชาติฮ่องกง อาคาร 2

Hong Kong International Airport (HKIA) stands as a global aviation hub, ranking among the world’s busiest airports for both cargo and passenger traffic. As part of its commitment to excellence and efficiency, the recent Terminal 2 Expansion project aimed to enhance the airport’s capacity and infrastructure. Dextra’s contribution played a pivotal role in ensuring the project’s success.

With the continuous growth in air travel and cargo shipments, HKIA recognized the need to expand and upgrade its facilities to accommodate the increasing demand. Terminal 2, a vital component of the airport’s infrastructure, became the focus of an extensive expansion project. This redevelopment aimed not only to increase passenger capacity but also to improve operational efficiency and provide a seamless experience for travelers.

Dextra, a leading provider of engineered construction products, played a crucial role in the success of the Terminal 2 Expansion project. The company supplied an impressive 200 tons of post-tensioning bars, specifically the M78 and M88 sizes, Grade 1080. These post-tensioning bars were instrumental in several key aspects of the construction process.

การเชื่อมต่อของ Jacking Towers:

โครงการขยายนี้เกี่ยวข้องกับวิศวกรรมที่ซับซ้อน ซึ่งจำเป็นต้องมีการเชื่อมต่อที่แม่นยำของเสาแม่แรงเพื่อให้แน่ใจว่าโครงสร้างของอาคารผู้โดยสารแห่งใหม่มีความสมบูรณ์ คานรับแรงตึงของ Dextra ช่วยเสริมแรงที่จำเป็น ช่วยให้สามารถเชื่อมต่อระหว่างหอคอยได้อย่างปลอดภัยและเชื่อถือได้

การยกโครงสร้างหลังคาหนัก:

Terminal 2’s redevelopment included the installation of a robust and aesthetically pleasing roof structure. The weight and complexity of the roof required a sophisticated lifting mechanism. Dextra’s Grade 1080 post-tensioning bars played a key role in the heavy lifting process, ensuring that the roof structure was securely and efficiently positioned.

As HKIA continues to uphold its status as a global aviation leader, the Terminal 2 Expansion project, along with Dextra’s significant contribution, stands as a remarkable example of innovation and excellence in airport infrastructure development.

รถไฟใต้ดินเมลเบิร์น

Melbourne Metro: สถานีรถไฟใต้ดินใหม่ 5 แห่ง

Melbourne’s metropolitan rail service operates 226 six-carriage trains across 998 km of tracks. The metro has 15 lines and 222 stations, serving more than 400,000 passengers a day across the city.

In 2017, the construction of a 9 km-long tunnel and five new underground stations was announced to increase capacity and expand coverage in the city’s suburban area.

Construction began in 2018. Dextra was involved in the project by supplying rebar connectors with fully automated rebar preparation equipment for the station’s structural การเสริมแรง works.

Griptec couplers were chosen for their unrivaled performance in tension, compression, and fatigue, with 400,000 units delivered.

In addition, Dextra supplied:

  • 5,300 พอลิเมอร์เสริมเส้นใยแก้ว Astec Combination Bolts — These were used at the CBD cavern location. The 19m width of the cavern allowed for the construction of two conventional 7m tunnels, built in parallel with the middle segments secured by พอลิเมอร์เสริมเส้นใยแก้ว CB Bolts, which can be cut to widen the gallery.
  • 2,400 พอลิเมอร์เสริมเส้นใยแก้ว Geotec GR45 – 25mm dowels — Each measuring 11.8 meters, these dowels were used to secure the excavation face.
  • 900 พอลิเมอร์เสริมเส้นใยแก้ว Astec Soil Nails ST50 – 41 — These were applied to secure several stations under construction. Some of them extend beyond the project boundary since พอลิเมอร์เสริมเส้นใยแก้ว can remain in the ground and be easily cut later.
  • 16 Soft-Eyes — Installed in the D-Wall and bored pile of five stations.

Dextra provided support and shared its expertise on พอลิเมอร์เสริมเส้นใยแก้ว during the design stage, producing custom-shaped พอลิเมอร์เสริมเส้นใยแก้ว solutions to meet the owner’s expectations. Due to the cuttability of พอลิเมอร์เสริมเส้นใยแก้ว, the TBM can pass through the D-Wall in minimal time without causing damage.

The metro tunnel and its new stations are due to open in 2025 and are predicted to become a new landmark for the city.

(เครดิตภาพ: ฮิวจ์ เลเวลิน จาก https://bit.ly/2S0kbAG)

สนามกีฬาแห่งชาติเขาสง

สนามกีฬาแห่งชาติเขาสง

The National Stadium of Kaohsiung is a large open-air stadium located in the Zuoying District of Kaohsiung, Taiwan. It was formerly known as the World Games Stadium or Takao Stadium. This is a multi-purpose stadium and currently the largest sports facility in Taiwan in terms of capacity, with 55,000 seats.

The arena was built in 2007 in anticipation of the 2009 World Games. Its main purpose now is to host football/soccer events, although its distinctive non-circular shape also makes it a suitable venue for baseball events.

สำหรับโครงการนี้ Dextra จัดหาเหล็กกล้าคาร์บอน แท่งแรงดึง used as cross-bracing, incorporated into the secondary trusses of this complex steel structure, revealing the stadium’s “nest-shaped” architecture.