โรงไฟฟ้าพลังความร้อนร่วมพลังงานแสงอาทิตย์แบบบูรณาการ Green Duba
Duba ISCC Green Power Plant 1 is a large power infrastructure project located in the northwest of Saudi Arabia, along the Red Sea. The ISCC (Integrated Solar Combined Cycle) technology adds 50 MW of solar power to the gas and steam turbines, generating a total of 500 MW of electricity.
For this project, Dextra supplied Double Corrosion Protection Ground Anchors, used as a permanent anchoring solution for the excavation work preparing the pumping chamber. A total of 264 anchors (Grade 1080/1230, Ø32 & 40 mm) were supplied and installed across four layers.
ระบบ Double Corrosion Protection anchors supplied for this project were pre-grouted at the Dextra factory, applying the first layer of grout between the steel bar and HDPE sleeve. The pre-grouted segments were reconnected on-site using couplers. Pre-grouted anchors not only save time and reduce costs during on-site operations, but they also enhance overall anchor quality by ensuring that the first grout layer is applied in a factory-controlled environment.
การติดตั้งที่ไซต์งานดำเนินการโดยผู้รับเหมาฐานราก BAUER ซึ่งดำเนินการขุดเจาะ การยก การติดตั้ง การอัดฉีด และการดำเนินการภายหลังการตึง Dextra ให้คำแนะนำในระหว่างขั้นตอนแรกของการติดตั้งโดยส่งทีมผู้เชี่ยวชาญด้านธรณีเทคนิคไปที่ไซต์งาน
ลำดับการติดตั้งโดยทั่วไปมีดังต่อไปนี้ (ดังภาพประกอบด้านล่าง):
- หลังจากแกะบรรจุภัณฑ์ออกจากชั้นวางในการขนส่ง ให้ต่อส่วนต่างๆ ด้วยข้อต่อ หุ้มด้วยปลอกหดด้วยความร้อน
- การขนส่งพุกที่ประกอบแล้วจากการประกอบไปยังไซต์งานไปยังพื้นที่ยก (13 กก. ต่อเมตรเชิงเส้น)
- สายไฟที่หัวพุกเพื่อควบคุมการลง ท่อยาแนวยังติดตั้งไว้ล่วงหน้าพร้อมพุก
- ตอกพุกยาว 30 เมตร ลงในรูเจาะพร้อมท่อยาแนว
- หลังจากอัดฉีดและอัดแรงแล้ว จะมีการติดตั้งฝาครอบหัวที่เต็มไปด้วยจาระบีบนหัวพุก เพื่อรักษาพุกให้แยกออกจากสภาพแวดล้อมภายนอกที่มีฤทธิ์กัดกร่อน
สำหรับข้อมูลเพิ่มเติมเกี่ยวกับโซลูชันการขุดและพื้นดินของเราในตะวันออกกลาง โปรดติดต่อของเรา สำนักงานดูไบ.