Dextra Group | Reliable Connections

Taishan EPRs 1&2

Taishan EPRs 1&2

Taishan EPRs are two nuclear reactors of the EPR type, each with a capacity of 1,750 MW, built by Areva and located near Taishan in Guangdong province, China.

Dextra was present on-site from the beginning of construction in 2009 until 2016. Reactor operations were planned to start in 2017.

For this challenging project, Dextra supplied its Griptec rebar splicing solution, which was used in the concrete structure of the reactor.

The Bartec rebar coupler solution, as well as Headed Bars, was also used in other buildings of the project.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.