Dextra Group | Reliable Connections

Cochin Shipyard – New Dry Dock, India

 

Cochin Shipyard – New Dry Dock, India

Dextra Supplied 550 Tons of Marine Tie Bars to the New Dry Dock at Cochin Shipyard

India’s maritime sector is making a significant leap forward with the New Dry Dock Project at Cochin Shipyard, a vital infrastructure development aimed at enhancing shipbuilding and repair capabilities in the region. Dextra is proud to contribute to this landmark project by supplying 550 tons of Grade 500 Marine Tie Bars, reinforcing the dry dock’s structural integrity.

Project Overview

The Cochin Shipyard – New Dry Dock Project is a major expansion designed to accommodate the construction of larger vessels and enhance India’s shipbuilding capabilities. Spearheaded by L&T (Larsen & Toubro) Construction, this world-class facility will meet the growing demands of the maritime industry, providing advanced solutions for ship maintenance, repairs, and construction.

The 310-meter-long dry dock boasts a width of 75/60 meters and a depth of 13 meters, equipped with a 600-ton gantry crane, making it one of the largest marine infrastructures in the region. The dock floor is designed to handle a load of 600 tons per meter, allowing it to support the construction of even larger aircraft carriers with a 70,000-ton displacement. The dry dock will serve both ship construction and repair needs, cementing its role as a crucial asset in India’s maritime sector.

Why Dextra?

Dextra was chosen as a key supplier for this project due to our competitive pricing and outstanding service. With decades of experience in delivering high-performance reinforcement solutions for marine infrastructure, our Grade 500 Marine Tie Bars ensure:

✅ High Strength & Durability – Designed to withstand extreme loads and harsh marine environments.

✅ Precision Engineering – Manufactured to the highest standards for reliability and performance.

✅ Seamless Project Execution – Timely delivery and expert support to ensure smooth installation.

Advancing Shipbuilding in India

As India strengthens its position as a global shipbuilding hub, the New Dry Dock at Cochin Shipyard marks a significant milestone. This project will play a crucial role in enhancing the country’s maritime infrastructure, enabling the construction and maintenance of larger vessels, including naval ships and commercial carriers.

With a strong commitment to innovation and excellence, Dextra is proud to support this transformational project, reinforcing the foundation of India’s shipbuilding future. Our high-performance solutions continue to contribute to the growth and development of the country’s maritime capabilities, ensuring a robust and sustainable industry for years to come.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2,” is set to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is poised to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2) to provide high-performance solutions for this vital infrastructure. We are supplying 7,800 tons of Marine Tie Bars in various sizes, all in Grade 500. These tie bars, paired with specialized accessories, are engineered for maximum durability and performance, essential for ensuring the 7.5 km long quay wall’s stability and longevity in the challenging marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, enabling vessel docking, cargo handling, and long-term maritime operations. Marine tie bars are critical to the structural integrity of this massive structure.

Dextra’s Marine Tie Bars, manufactured to the highest standards, are key to ensuring the required lifetime of the marine structure, offering long-lasting support and resilience.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underscores our commitment to delivering cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia progresses toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.