Dextra Group | Reliable Connections

Search
Close this search box.

Bangkok BITEC expansion

Bangkok BITEC expansion

BITEC, Bangkok International Trade & Exhibition Centre, is a large exhibition venue locast East of Bangkok in the Bang Na district.

Dextra was involved in the Phase II expansion of the exhibition center, taking place between 2014 and 2016. The expansion project added 3 exhibition halls, more than 32,000 sqm of exhibiting space under a ceiling height of 25 meters.

Dextra worked together with contractor Italian-Thai to engineer and supply long tension bar systemsthat will support the roof structure above the BITEC new exhibition halls.

In total, Dextra delivered 298 assemblies in various diameters, each composed of multiple bars connected with couplers and turnbuckles and anchored to the structure with fork ends, with total assembly lengths in several cases exceeding 50 meters long (average 33 meters).

Delivery took place end of 2015 and installation was completed by mid-2016. Bangkokians can still easily admire the Tension Bars roofing structure when stopping at BTS Bearing station, or driving up the Bang Na Trat highway.

For such large structures, Tension Bars offer a number of advantages compared to other “tensioning” solutions: lower elongation under loads, lower post tensioning forces required, better resistance to corrosion, reduced long terms relaxation and reduced maintenance and surveillance costs.

Moreover, they are easily to install thanks to their fork ends and offer a very aesthetic roofing structure.

New Algiers Grande Mosque

New Algiers Grande Mosque

The new Djamaa El Djazair Mosque of Algiers is a huge construction project located in the eastern part of the capital city of Algeria. It will feature the world’s tallest minaret with a height of 265m. Further to this, the large complex will be able to accommodate as many as 120,000 worshippers.

For the main mosque’s building, Dextra supplied its Tension Bar Systems to China State Construction Engineering Corporation, the main contractor on this project. In total, those are more than 800 structural tension bar assemblies with diameters ranging from M16 to M56 which are being used for the cross-bracing of the roofing structure in the domed prayer room.

Each tension rod is painted in white to match the interior design of the mosque. Bracing discs (top left picture) add to the special architectonic finish of the structure.

For the building and minaret construction, Dextra also supplied its popular Bartec coupler solution, also available in Algeria through our network of distributors. consult our Paris office for more information.

Abu Dhabi International Airport

Abu Dhabi International Airport

Abu Dhabi Airport is the main airport of Abu Dhabi, capital of the United Arab Emirates and located around 15km east of the city. Abu Dhabi is the second busiest airport in the UAE, after Dubai International.

Dextra has been involved in the construction of the new Midfield Terminal (Terminal 3), which will enter in service end of 2017, significantly boosting the airport capacity and allowing offering new gates for large airliners like the A380.

Dextra has been involved in several parts of the new terminal: foundation, concrete structures, roof and façade.

Foundations& Concrete structures

For the foundation piles,
Bartec couplers have been used for the reconnection of prefabricated cages making the foundation piles, as well as other concrete applications. A solution complemented by the use of
Sonitec sonic logging tubes. The tubes, used for Crosshole Sonic Logging integrity testing, are delivered by segments which can be easily reconnected by hand thanks to their bell mouth, saving time upon installation. A total of 650,000 Bartec couplers and more than 110,0000 Sonitec tubes have been installed on Abu Dhabi Midfield Terminal.

Roofing and Façade

For the roofing structure, Dextra engineering team supported to provide two customized structural solutions.

For all applications requiring structural members to work in compression, Dextra supplied its Compression Strut solution. Compression Strut are simple to install thanks to their fork end, and conveniently allow for minor length adjustments at each fork. A total of 529 Compression Struts have been installed on this project.

For trusses where the effort is in tension, Dextra supplied its Tension Bar Systems. Similarly to compression struts, Tension Bars can be installed easily thanks to fork ends, provide adjustment capability at forks and in-line turnbuckles. Dextra Stainless range has been chosen for this application, guaranteeing unmatched aesthetics thanks to its mirror surface finish.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.