Dextra Group | Reliable Connections

Search
Close this search box.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of Marine Tie Bars in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.

Dextra’s Marine Tie Bars, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

Driving Sustainability Forward: Introduces EPDs for Marine Tie Bars

 

We are proud to announce the latest addition to our sustainability journey: EPDs for Marine Tie Bars!

This achievement follows our strides in eco-conscious construction with EPDs (Environmental Product Declarations) for rebar couplers and GFRP rebar. Our commitment continues as we prepare to introduce EPDs for our other engineered bar systems and additional solutions. Stay tuned as we continue to pave the way for a greener, more sustainable future in construction!

 

EPD Report for Dextra Marine Tie Bars

EPD Report for Dextra Marine Tie Bars

Unable to display PDF file. Download instead.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.