Dextra Group | Reliable Connections

Search
Close this search box.

The Plum condominium | พลัมคอนโด

The Plum condominium | พลัมคอนโด

The Plum Central station is a 38-floors condominium project, made of 2 towers and located near Bang Yai elevated metro station, in the North West of Bangkok. The residential building will host 1,013 appartments.

The Phase 1 of the project (first tower) started in September 2015 and will be completed aroundMarch 2018. The fast pace construction is madepossible by the use of “fully precast” concrete techniques.

The owner of the project Pruksa is operating its own precast plant for this project.

For this project, the objective of Pruksa was to be able to quickly erect precast panels (acting as shear walls) for all levels above ground. Dextra suggested for that purpose the use of Groutec couplers.

Groutec couplers, mounted on rebar Ø25mm previously prepared with Bartec thread. The couplers, installed at the bottom of each precast element, are then cast as part of the precast wall panel element.

After lifting the element to the upper floor at site, reconnection to protruding reinforcement is achieve by injecting non-shrink mortar. It is to be noted that Dextra does not provide the mortar, which instead can be sourced locally, generating significant savings. After injecting grout, bracing around each panel can be removed after 3 days.

For more information about The Plum Central Station and Groutec application, please refer to our case study.

 

Jamnagar refinery expansion

Jamnagar refinery expansion

Located in the Gujarat, in western India, the Jamnagar refinery is the largest in the world in production capacity. Owned by Reliance Industries, it has been commissioned in 1998 and spreads over the 50 km2 surface area.

For the phase 3 alone, more than 305,000 tons of steel reinforcement were used: a 36 months project involving more than 100,000 engineers and construction workers.

Dextra has been involved in Jamnagar since the early days and supplied its rebar splicing solutions on the phases 1, 2 and 3 of the project.

For the phase 3 especially, 3 rebar coupler solutions were used:

Bartec solution was used for cast in situ applications, for bar-to-bar connections in foundations, pile cages, column cages. Bartec couplers were also used as a way to splice bars in heavily congested rafts and pile caps.

For the pipe-racks, which were built from precast elements, from a precast factory part of the project. Groutec couplers have been used to connect beams and columns. Positionned in the bottom elements and filled with grouts, they conveniently avoided the need of in situ wet joint.

image06

 

For other applications where rebar length is too short to allow traditional overlap, Unitec couplers were used.

For more information on Jamnagar, please download our Case Study.

Forest City Johor 森林城市

Forest City Johor 森林城市

Forest City is a massive mixed-use urban development taking place in the Southern tip of Malaysia, in the Iskandar region, Johor. The development is taking place on reclaimed land just across the Johor Straight, in sight of Singapore.

The project, which will continue over the next decade, aims ultimately to create 300,000 residential units, hosting as many as 700,000 people, as well as numerous commercial buildings.

The Forest City project is expected to fuel the region economy, as well as Singapore, as light rail and road links will ultimately make the connection across the strait with the island state.

Dextra has been involved since the early phases of the project for the supply of its Groutec S precast solution. Groutec allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, Groutec S couplers (compact models) were used to connect the panels making the residential towers shear walls.

The Forest City project is supported by the installation at site of several sets of Bartec threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the Groutec sleeve. Dextra aftersales team also provided training and support in order to guarantee high production levels during all the project duration.

For more information about the availability of precast solutions in Asia, please contact our Bangkok office

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.