Dextra Group | Reliable Connections

Search
Close this search box.

Dextra’s Quarterly Newsletter: Connection #39

As the holiday season fills the air with joy and reflection, we at Dextra would like to express our heartfelt gratitude for your continued trust and partnership.

May this Christmas bring warmth, happiness, and cherished moments with your loved ones. As we look ahead to the New Year, we’re excited to continue building stronger connections and achieving new milestones together.

Here’s to a 2025 filled with health, success, and endless possibilities!

Warm wishes from all of us at Dextra.

🎄 Merry Christmas & Happy New Year! 🎉

Our latest projects

One Bangkok: A New Icon of Urban Living Officially Opens

The highly anticipated One Bangkok has officially opened on October 25, 2024, redefining Bangkok’s skyline as the city’s largest integrated mixed-use district. Spanning 1.83 million sq. m., it features premium offices, luxury hotels, residences, retail spaces, and cultural hubs

Dextra played a key role in its construction, supplying 500,000 Bartec standard couplers, transition couplers, and headed bars, enabling vital rebar connections and reducing congestion in the steel reinforcement.

HK_Central-Kowloon-Route_Slider1
LT-Rail-Baltica-Neris-Bridge_Slider1
PH-My-Enso-Lofts-Slider2

Central Kowloon Route, Hong Kong

Dextra supplied Fortec+, rock bolts, friction bolts, umbrella pipes, post-tensioning bars to ensure strong and durable connections.

Port of Neom, Saudi Arabia

Dextra is supplying Grade 500 Marine Tie Bars to Six Construct Saudi and MBL (Stage 1), and Saudi Archirodon (Stage 2) for this project.

Rail Baltica Bridge, Lithuania

Sonitec tubes were used to test the structural integrity of the bridge over the Neris River as part of the Baltic States’ largest railway project.

My Enso Lofts, Philippines

Bartec and Groutec play a key role in the raft foundation, columns, core walls, precast shear wall, column connections.

Recent activities

Dextra Unveils New Mumbai Office

We’re thrilled to announce the relocation of our Mumbai office to a new space in Andheri East, Mumbai. Our team is excited to continue delivering exceptional service and driving innovation from this dynamic new hub. Read more
 

Honoring 20-Year Employees

We are proud to celebrate a significant milestone for eight dedicated employees from India, Thailand, and China, who have been with us for 20 years, reflecting the strength of our team and the values we uphold. Read more
 
 

 

ISO 19443 Audit with Bureau Veritas

Dextra’s Thailand and India plants are undergoing Bureau Veritas audits for ISO 19443 Nuclear Certification, marking a renewal for Thailand and a first for India—reaffirming our commitment to quality and safety. Read more

 

PC Headed Bars AFCAB & CARES

Dextra’s PC (Pressed Connection) Headed Bars 9D model is now certified by AFCAB (France) for general use, while CARES (UK) TA1-B&C certifies both 9D and 9A models for general and nuclear applications. Read more
 

Upcoming events

Rail Baltica Bridge Over Neris River, Lithuania

 

Rail Baltica Bridge over the Neris River, Lithuania

 

The construction of the Rail Baltica Bridge over the Neris River near Jonava marks a significant milestone in the region’s railway infrastructure. Stretching 1.5 kilometers, this bridge will not only be the longest in Lithuania but also the entire Baltic States. Designed with a variety of spans—including cast-in-place from traveler, cast-in-place supported on falsework, and span-by-span cantilever—the project showcases advanced engineering techniques and a commitment to environmental protection.

Dextra plays a vital role in ensuring the structural integrity of the bridge by supplying Sonitec crosshole sonic logging (CSL) testing tubes for the testing of piles. CSL testing is a crucial procedure that provides real-time insights into the quality and integrity of concrete in the piles, ensuring they meet stringent safety standards. This advanced technology enables engineers to detect anomalies and assess the quality of the concrete, ensuring the long-term durability of the bridge.

The use of Sonitec is particularly important given the bridge’s engineering complexity and the environmental considerations surrounding its construction. By integrating this technology, Dextra helps to uphold the highest standards of construction and environmental stewardship.

The Rail Baltica project represents the largest railway infrastructure development in the history of the Baltic States. Once completed, it will provide an electrified double-track European gauge railway line connecting major cities such as Warsaw, Kaunas, Riga, and Tallinn. This ambitious project will span a total of 870 kilometers, with 392 kilometers in Lithuania alone.

With the Rail Baltica Bridge over the Neris River, Dextra is proud to contribute to a landmark project that promises to enhance regional connectivity, promote sustainable transport solutions, and respect the delicate balance between development and environmental conservation. As construction progresses, the bridge will stand as a testament to innovative engineering and collaboration, paving the way for a brighter, more connected future in the Baltics.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of Marine Tie Bars in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.

Dextra’s Marine Tie Bars, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

Grand Paris Express – Line 16-18, France

 

Grand Paris Express – Line 16-18, France

 

Dextra has proudly supplied its high-performance Fortec rebar couplers and Sonitec crosshole sonic logging (CSL) tubes for the construction of the Grand Paris Express Line 16-18 in France, one of Europe’s most ambitious infrastructure projects. This metro expansion aims to improve connectivity between the suburbs and the city center, providing a more efficient transportation network for millions of commuters.

Dextra’s Fortec couplers were utilized for reliable and durable rebar connections, ensuring the structural integrity of the extensive underground tunnels and stations. In addition, the Sonitec CSL tubes were supplied for concrete pile integrity testing, essential for assessing the quality of deep foundations. These innovative solutions have contributed to the project’s success in meeting high safety and performance standards, underscoring Dextra’s commitment to delivering top-quality materials for large-scale infrastructure developments.

With the Grand Paris Express set to transform the city’s transportation landscape, Dextra’s involvement highlights its role in shaping resilient and sustainable urban infrastructure.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Sharing Some Mumbai Office Inauguration Glimpses!

We’re thrilled to announce the relocation of our Mumbai office to a new space at:

📍 501, Satellite Silver Co-op Prem Soc Ltd, M V Road, Village Marol, Marol Naka, Andheri-East, Mumbai – 400059
📞 Tel: +91 022 4503 5611

Our team is excited to keep delivering exceptional service and driving innovation from this new hub. We are deeply grateful for the opportunities and support that have brought us to this milestone.

Our commitment to excellence remains unwavering, and we look forward to serving you better from our new address!

Dextra’s Quarterly Newsletter: Connection #38

The Mumbai Metro Line 2B is a vital infrastructure project designed to enhance public transport in Mumbai. Dextra has contributed to the project by supplying advanced construction solutions to ensure the structure’s durability and strength.

For the elevated section’s U-girders, Dextra provided CR Bar 1080 for both stressing and pre-tensioning. Additionally, fully threaded bars were supplied for temporary stressing, offering flexible and secure connections between precast segments.

Dextra also delivered Unitec couplers, enabling efficient rebar connections without pre-threading, ensuring strong, seamless structural continuity on-site. Moreover, Sonitec CSL testing tubes were provided for concrete pile integrity testing.

By contributing these advanced materials and solutions, Dextra is supporting the development of a reliable metro system that will meet Mumbai’s growing transportation needs for years to come.

More about our latest projects

UK_HS2-ChilternTunnel_Slider3
DE_A66-Salzbachtal-Bridge_Slider5
TH_Neo-Factory_Slider2

High Speed 2 (HS2), UK

Griptec couplers are reinforcing critical rebar connections across multiple key sites in the UK’s new high-speed railway project.

Cairo Monorail Bridge, Egypt

High-strength tension rods were used as hangers for the bowstring monorail bridge to maintain its structural integrity and durability.

Salzbachtal Bridge, Germany

Sonitec CSL tubes were chosen for cross-hole sonic logging to assess deep foundation integrity and ensure the stability of the bridge.

Neo Factory Phase 1, Thailand

Bartec and Groutec play a key role in the precast column connections, guaranteeing reliable construction.

Introducing Durabar Carpet: the latest breakthrough from Dextra!

Made from Durabar GFRP rebar, this latest patented Durabar Carpet offers unparalleled versatility for construction projects. Designed for efficiency, its ability to be cut effortlessly in any direction ensures maximum material savings.

Key Features:

•   Bar from Ø 6mm to Ø 16mm
•   Standard length: 5.8m
•   Customizable lengths: 2m to 5.8m
•   Flexible spacing: 100mm to 600mm

Watch Now: FibreCraft Insights – Exploring GFRP in Construction

Dextra is excited to present FibreCraft Insights, our brand-new video series dedicated to Glass Fibre Reinforced Polymer (GFRP) rebar in the infrastructure construction industry.

Hosted by our experts in composite solutions, this series offers valuable insights into the growing role of GFRP in modern construction.

The first three episodes are available now, where we delve into an introduction to the material and its advantages, the unique technical features of GFRP, and real-world applications.

Follow our LinkedIn to stay tuned for more episodes!

Recent activities

Our Collaboration with Makin Juta

Watch our latest interview with Makin Juta, one of our esteemed distributors and partners in Malaysia, and discover our collaboration on the iconic KLCC Lot L and M Podium project, where Bartec was selected as the trusted solution. Watch the interview

 

Tension Rods & PT Bars EPD Verified

Dextra’s tension rods and post-tensioning bars are Environmental Product Declaration (EPD) verified and listed on the EPD Hub, joining our previously verified couplers, GFRP rebars, marine tie bars, ground anchors, rock bolts, and Sonitec. Read more

 
 

 

Headed Bars Now CE Marked with ETA

Bartec, Fortec, and Rolltec headed bars are now CE marked with European Technical Assessments (ETA). Tested by Concrefy and certified by Kiwa, these are our first CE-marked products, meeting the essential requirements. Read more

 

Commitment to Community in Thailand

Dextra Thailand donated to the Cerebral Palsy Sports Association of Thailand. Read more. Additionally, we donated unwanted office furniture to a school and hosted environmental stewardship activities for students. Read more

 

Upcoming events

World of Concrete India

16-18 Oct 2024

Port Dev. MEA Forum, United Arab Emirates

21-22 Oct 2024

ASEAN Ports & Logistics, Malaysia

10-11 Sep 2024

Bauma
China

26-29 Nov 2024

CTBUH Asia Conference, Thailand

3-4 Dec 2024

Dextra Celebrates Paralympic Success with Thai Boccia Athletes

Dextra had the pleasure of visiting the Cerebral Palsy Sports Association of Thailand (CPSAT) once again, following our initial visit in June. During that visit, we donated funds to support these dedicated athletes in their training and competitions, and we even had the opportunity to play a friendly boccia match together. Since then, these remarkable athletes have achieved outstanding success at the recent Paralympic Games in France, winning a gold medal and two bronze medals in Individual Boccia.

This return visit allowed us to personally congratulate the athletes on their incredible accomplishments. Their perseverance and commitment have not only brought pride to Thailand but also inspired us all at Dextra. We are honored to have supported them on their journey and are excited to continue backing their future endeavors.

Through these ongoing efforts, Dextra reaffirms our dedication to giving back to the community and celebrating the triumphs of individuals who embody the spirit of resilience and determination.

Bartec, Fortec, Rolltec Headed Bars Achieve CE Marking

Dextra’s Bartec, Fortec, and Rolltec Headed Bars Achieve CE Marking—A Milestone in Engineering Excellence

Dextra is proud to announce a significant milestone in our journey of delivering high-quality construction solutions: our Bartec, Fortec, and Rolltec large headed bars, ranging from 16 to 40mm in diameter, have been assessed and granted European Technical Assessments (ETA) and are now officially CE marked. This achievement is based on the stringent regulations under EAD 160012-01-0301, edition April 2021, certified by Kiwa, one of the largest certification bodies in the world.

CE marking signifies our products meet the essential requirements for headed reinforcing steel bar within the European Economic Area. It also reinforces our commitment to providing safe, reliable, and high-performance solutions in the construction industry.

To ensure that our products meet the highest standards, rigorous testing was conducted by Concrefy; the most recognized and experienced laboratory in the Netherlands, in accordance with ISO 15698. These tests verified the mechanical properties, durability, and overall performance of our headed bars, ensuring they comply with stringent European standards.

A First Step Toward a Larger Vision

This achievement marks the beginning of an exciting new chapter for Dextra. These are our first products to receive CE marking, and we are already working on expanding this certification to more of our product range. Our goal is to continue delivering innovative solutions that meet and exceed industry standards globally.

CE marking is not just a badge of compliance; it is a testament to our unwavering dedication to engineering excellence, quality, and customer satisfaction. As we continue to push the boundaries of what is possible in the construction sector, we are committed to setting new benchmarks in product performance and safety.

Stay tuned as we bring more CE-marked innovations to the market, driving the construction industry forward with cutting-edge solutions designed to last.

About Dextra

Dextra is a leading provider of engineered construction products and solutions, specializing in high-performance rebar coupler systems and other advanced engineered construction technologies. With a global presence and a reputation for quality, Dextra continues to lead the industry in innovation and customer satisfaction.

Bartec-Fortec Headed bars - ETA-24-0219

Bartec-Fortec Headed bars - ETA-24-0219

Unable to display PDF file. Download instead.

Rolltec Headed bars - ETA-24-0268

Rolltec Headed bars - ETA-24-0268

Unable to display PDF file. Download instead.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.