My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

The Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of CR Бар 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

Сонитек, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ Арматурные муфты

✅ GFRP Rebars

✅ Морские галстуки

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

Невозможно отобразить PDF-файл. Скачать вместо.

Marina Bay Sands

Marina Bay Sands

Marina Bay Sands — это впечатляющий курорт с более чем 2500 номерами, казино, множеством ресторанов и уникальным небесным садом. Проект был завершен и открыт для публики в 2010 году.

Для этого проекта компания Dextra в период с 2007 по 2008 год поставляла решения для сращивания арматуры, а также трубы Sonitec.

Арматурная муфта Bartec использовалась в фундаменте мембранных стен, отвечая двойной задаче.

Первые соединители арматурных стержней можно использовать вертикально для соединения клеток D-Wall вместе, что позволяет добиться большей длины клетки.

Тогда муфты также можно использовать горизонтально в качестве незавершенных соединений плит. В этом случае муфту обычно устанавливают на крюке и заливают бетоном. На более позднем этапе муфту можно повторно соединить с арматурным стержнем второй фазы, чтобы начать армирование плиты.

Муфты также использовались для подземных тоннелей и вентиляционных зданий.

Для фундаментов Dextra также поставила более 100 000 погонных метров труб Sonitec, которые легко установить в арматурные каркасы и повторно соединить, что повышает производительность и устраняет необходимость в утомительных и ненадежных сварочных операциях. После установки трубки прочно фиксируются на месте, без проблем поддерживая клетку при подъеме и перемещении.

Аэропорт Дубая

Аэропорт Дубая

Аэропорт Дубая – главный аэропорт Объединенных Арабских Эмиратов. Знаменитый аэропорт, расположенный в нескольких километрах к северу от города Дубай, является домом знаменитой авиакомпании Emirates. Международный аэропорт Дубая занимает первое место в мире по пассажиропотоку #1.

Компания Dextra Middle- East, также расположенная в Дубае, участвовала в многочисленных проектах строительства аэропорта Дубая, особенно в период с 2003 по 2005 год, в строительстве Терминала 3 и связанных с ним залов ожидания.

Для внутреннего проекта в Дубае компания Dextra предоставила свою популярную
Бартек решение для муфты, решение для арматуры #1 в ОАЭ. В международном аэропорту Дубая было использовано 1,5 миллиона сцепок.

Надстройка

Соединители Bartec представляют собой техническое решение, позволяющее повторно соединить арматуру второй фазы между колоннами и балками, а также между стенами и балками.

Соединители арматуры также использовались для создания временных проемов в арматуре, позволяющих проходить людям и оборудованию.

Фонды

Для свай фундамента использовались муфты Bartec. В этом случае муфты стали частью очень интегрированного и автоматизированного процесса производства сепараторов, позволяющего соединять арматуру большого диаметра за минимальное время и максимизировать производительность производства сепараторов.

В качестве дополнения к арматурному соединению Bartec использовались трубки Dextra Sonitec, обеспечивающие быструю установку и повторное соединение звуковых трубок по всей длине клеток. Трубки Sonitec особенно просты в установке благодаря резиновой горловине Push-Fit и легко устанавливаются в клетке благодаря приваренным головкам. За прошедшие годы в международном аэропорту Дубая было установлено более 1 800 000 метров трубок Sonitec!

Бангкок БТС

Бангкок БТС

Система общественного транспорта Бангкока (BTS) — это крупная городская система надземного транспорта, расположенная через Бангкок, столицу Таиланда. Система была введена в эксплуатацию в 1999 году.

По состоянию на 2017 год система состоит из 24 надземных станций и 37 км надземных железных дорог, организованных в две основные линии, пересекающиеся друг с другом на центральной станции Сиама.

В системе BTS происходит расширение двух основных линий, при этом линейные сегменты и станции, как ожидается, будут введены в эксплуатацию в 2019 и 2020 годах.

Фонды

На протяжении многих лет для различных установок Dextra поставляла трубки Sonitec, которые используются для испытания бетонных свайных фундаментов под станциями и железнодорожными путями.

В общей сложности Dextra поставила около 40 000 погонных метров трубок Sonitec, что фактически эквивалентно длине самой системы BTS.

Пилоны

Для соединения вертикальных стержней пилонов компания Dextra предложила
Бартек связь.
Бартек позволяет удобно соединять сборные арматурные каркасы с помощью простого соединителя арматуры, что позволяет экономить сталь по сравнению с перекрытием и ускоряет работу на площадке.

В Таиланде нарезание резьбы осуществляется на заводе Dextra, удобно расположенном на северо-востоке Банкгока. Подрядчики получают уже подготовленную арматуру, смонтированную с помощью муфты для арматуры.

Пакет 1 AVE Palencia-Santander HSR (Паленсия – Паленсия Норте) и пакет 2 (Паленсия Норте – Амуско)

Проект высокоскоростной железной дороги AVE Паленсия-Сантандер — это важное инфраструктурное мероприятие, направленное на соединение Паленсии и Сантандера в Испании. Этот проект предполагает строительство обширной железнодорожной сети, виадуков и мостов, что подчеркивает необходимость прочного и устойчивого фундамента. Признавая исключительную важность обеспечения структурной целостности бетонных свай, руководство проекта искало передовые методики испытаний.

Компания Dextra сыграла ключевую роль в обеспечении прочности фундамента проекта, поставив испытательные трубки Sonitec Crosshole Sonic Logging (CSL). Эти трубы сыграли важную роль в проведении комплексных испытаний на структурную целостность бетонных свай AVE Palencia-Santander USR Пакет 1 (Паленсия – Паленсия Норте) и Пакет 2 (Паленсия Норте – Амуско).

Межскважинный ультразвуковой каротаж — это метод неразрушающего контроля, широко используемый для оценки качества и целостности бетонных свай. Он предполагает использование звуковых волн, передаваемых через бетон между двумя трубками доступа, что позволяет инженерам оценить свойства материала и выявить потенциальные дефекты.

Трубки Sonitec специально разработаны для межскважинного акустического каротажа и обеспечивают точный и надежный сбор данных во время испытаний на структурную целостность. Эти трубы встраиваются в бетонные сваи во время строительства, обеспечивая точки доступа для передачи звуковых волн.