Plum Condo Bangyai Station is a 38-story condominium project consisting of two towers, located near Bangyai elevated metro station in the northwest of Bangkok. The residential building will house 1,013 apartments.

Phase 1 of the project (the first tower) began in September 2015 and is expected to be completed around March 2018. The fast-paced construction is made possible by the use of fully precast concrete techniques.

The project owner, Pruksa, is operating its own precast plant specifically for this development.

For this project, Pruksa aimed to quickly erect precast panels (serving as shear walls) for all levels above ground. To meet this requirement, Dextra recommended the use of Гроутек couplers.

Groutec couplers were mounted on Ø25mm rebars, which had been pre-threaded using the Бартек system. The couplers, installed at the bottom of each precast element, were then cast as part of the precast wall panel.

After lifting the element to the upper floor on-site, reconnection to the protruding reinforcement was achieved by injecting non-shrink mortar. It is important to note that Dextra does not supply the mortar; instead, it can be sourced locally, generating significant cost savings. Once the grout is injected, bracing around each panel can be removed after three days.

Расширение нефтеперерабатывающего завода в Джамнагаре

Jamnagar Refinery Expansion: The World’s Largest Refinery by Production Capacity

Located in Gujarat, western India, the Jamnagar Refinery is the largest refinery in the world by production capacity. Owned by Reliance Industries, it was commissioned in 1998 and spans a vast 50 km² area.

For Phase 3 alone, more than 305,000 tons of steel reinforcement were used in a 36-month project, involving over 100,000 engineers and construction workers.
Dextra has been involved in Jamnagar since the early phases, supplying rebar splicing solutions for Phases 1, 2, and 3 of the project.

Dextra’s Rebar Splicing Solutions for Phase 3:

Three rebar coupler solutions were used in Phase 3:

  • Bartec Solution
    Used for cast-in-situ applications, including bar-to-bar connections in foundations, pile cages, and column cages.
    Also utilized in heavily congested rafts and pile caps to facilitate efficient стыковка арматуры.
  • Groutec Couplers
    Applied to pipe racks, which were constructed from precast elements in a dedicated precast factory within the project.
    Positioned in the bottom elements and filled with grout, eliminating the need for in-situ wet joints and ensuring fast, secure connections between beams and columns.
  • Unitec Couplers
    Used in applications where rebar length was too short to allow traditional overlap connections.

image06

Лесной город Джохор (森林城市)

Лесной город Джохор (森林城市)

Форест-Сити — это массивный городской комплекс смешанного назначения, расположенный на юге Малайзии, в регионе Искандар, штат Джохор. Строительство ведется на мелиорированных землях прямо через Джохор-Стрит, недалеко от Сингапура.

Проект, который будет продолжаться в течение следующего десятилетия, направлен в конечном итоге на создание 300 000 жилых единиц, в которых проживут до 700 000 человек, а также многочисленных коммерческих зданий.

The Forest City project is expected to fuel the region’s economy, as well as Singapore, as light rail and road links will ultimately make the connection across the island state.

Декстра has been involved since the early phases of the project for the supply of its Гроутек С precast solution. Гроутек allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, Гроутек С Для соединения панелей, образующих несущие стены жилых башен, использовались муфты (компактные модели).

The Forest City project is supported by the installation at site of several sets of Бартек threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the Гроутек С sleeve. The Dextra aftersales team also provided training and support in order to guarantee high production output during the project duration.