Порт Дуала

Порт Дуала

The Port of Douala is a large seaport located on the Atlantic Ocean, in the Wouri department of Cameroon. It serves as the main port of Cameroon and is the busiest port in Central Africa. Through agreements, it also serves countries like Chad and the Central African Republic, which lack direct access to the sea.

To support the ambitious development plan of Port Autonome de Douala, Dextra collaborated with contractor BESIX for the engineering and supply of the steel structures supporting Douala Pier 51, a 165-meter-long quay wall.

In 2015, Dextra engineered and supplied Marine Tie Bar systems with a diameter of M100 and in Grade 700, the highest in our range. Higher grades offer an improved performance-to-steel ratio compared to grades 355/510 and 500/660, allowing for smaller diameter bars, which ultimately provide steel savings and facilitate logistics and installation.

The long tendons were spliced with turnbuckles and couplers. The rods were anchored into the combi walls using Captive Nuts accessories, which allow a multidirectional rotation angle of 5°, easing the installation process.

Танжер Мед 2 Порт

Танжер Мед 2 Порт

Tanger Med 2 is the expansion of Tanger Med, a multipurpose deep-water seaport located a few kilometers east of Tangier, Morocco, facing Gibraltar.

The port expansion aims to increase the yearly capacity of the largest port in Africa by 5.2 million containers.

For this large infrastructure project, Dextra supported contractor Bouygues with a rebar splicing solution for the reinforcement of the caissons.

Dextra supplied its Роллтек solution, which is AFCAB-certified, a requirement for this project. Two Rolltec machines were installed to support the threading activities, completing 360,000 threads in total (180,000 Rolltec couplers).

The couplers were used in the reinforcement of the caissons, which were as tall as 20 to 24 meters. The couplers provided:

  • Temporary openings to solve congestion issues in the reinforcement within the caisson, creating safe passages for men and equipment during the installation phase.
  • Horizontal wall-to-slab connections (from the inside of the caisson perimeter to the slab). For this application, couplers were left pending, allowing the slip form to go up.

MA Tanger Med 2 Case Study Rolltec MA Tanger Med 2 Case Study Rolltec1

Автономный порт Пуэнт-Нуар

Автономный порт Пуэнт-Нуар

Автономный порт Пуэнт-Нуар (PAPN) — крупный морской порт, расположенный на Атлантическом океане, часть Республики Конго. Он связан со столицей Браззавилем железнодорожной веткой протяженностью 500 км и играет важную роль в региональном развитии, способствуя торговле с соседними странами, такими как Демократическая Республика Конго, Ангола и Габон. С более чем 600 000 контейнерами, проходящими через порт ежегодно, грузопоток порта продолжает расти.

Для поддержки амбициозных планов развития PAPN компания Dextra сотрудничала с подрядчиком SAIPEM по проектированию и поставке стальных конструкций для нескольких причалов Пуэнт-Нуара глубиной 16 метров.

В период с 2011 по 2012 год компания Dextra поставила около 1000 тонн Морские галстуки в классе 700, самом высоком в нашем ассортименте. Эти более высокие классы обеспечивают лучшее соотношение производительности к стали, позволяя использовать прутки меньшего диаметра, что приводит к экономии на логистике и установке.

Dextra также предоставила балки-перемычки, установленные на Combi Walls. Эти балки служат интерфейсом между стальными стенами и стяжками большого диаметра. Поскольку балки-перемычки поддерживают стержни, их форма, расстояние и установка должны быть адаптированы к конфигурации стяжек. Чтобы обеспечить совместимость и упростить процесс установки, Dextra всегда рекомендует проектировать и поставлять балки-перемычки вместе с узлами стяжек.

С 2015 по 2016 год компания Dextra принимала участие во втором этапе проекта по строительству набережной D.

Контейнерный терминал МультиРио

Контейнерный терминал МультиРио

The MultiRio Container Terminal, located in the Rio de Janeiro Port, specializes in the import/export of finished goods. To increase its shipping capacity by at least 50%, MultiRio launched an expansion project in 2012 to add extra quay length and accommodate more containers.

To support this pier expansion, Dextra partnered with contractor Andrade Gutierrez for the engineering and supply of Marine Tie Bars.

In 2014, Dextra supplied 100 tons of steel rods in medium diameters M56 and M59. The rods were anchored to the wall using swivel plates and nuts, allowing for 5° multidirectional adjustment.

These plates were positioned onto the waler beams, which were also supplied by Dextra. Waler beams are installed onto the sheet piles, and their design is directly influenced by the chosen Marine Tie Bars solution. For example, the spacing of the beams is impacted by the diameter of the bars and the angle of the rods.

tie rods waling

Between the wall, Hinge couplers were installed in line to allow for additional vertical tolerance. This was necessary to counteract ground settlement, which can occur over time due to the heavy cranes operating and the piles of stored containers. The Hinge couplers provided the flexibility needed to accommodate any vertical movement and ensure the stability of the structure.

Международный грузовой терминал Парадип (PICT)

Международный грузовой терминал Парадип (PICT)

Paradip International Cargo Terminal (PICT) is a multipurpose berth located at Paradip Port on India’s eastern coast, designed to handle clean cargo. The berth has a depth of 17.1 meters and a length of 450 meters, allowing it to accommodate cape-sized vessels up to 125,000 DWT. It will handle a range of cargoes including containerized goods, iron and steel products, fertilizer, food grains, and sugar.

Dextra supplied approximately 370 tons of Marine Tie Bar systems, sizes M105 and M76, Grade 500, along with accessories like couplers, turnbuckles, swivel plates, and swivel nuts. These tie bar systems were used to secure the concrete diaphragm walls at both ends of the berth, ensuring the structural integrity of the terminal.

.

Dextra Marine Tie Bars Application

With the new berth becoming operational in 2018, Paradip Port now boasts a total of 18 berths, including 13 cargo berths, 2 oil tanker berths, and 3 crude oil tanker berths with a single-point mooring system for handling crude oil tankers. This expansion significantly enhances the port’s capacity to handle a wide range of cargo and oil shipments.

Источники изображений: Канал JM BAXI GROUP на YouTube: https://www.youtube.com/watch?v=k9-VV3nlT58.

Морское развитие порта Мугаррак

Морское развитие порта Мугаррак

Mugharraq Port, located 240 kilometers from Abu Dhabi, UAE, is undergoing a significant marine development project. The expansion includes extending the quay wall to 480 meters, deepening the facility to 8 meters, and adding six Ro-Ro ramps and additional berths to facilitate heavy lift operations.

Dextra supplied 407 tons of marine tie bars (size M103, grade 700) to connect the sea walls to the anchor walls.

This project aims to enhance the port’s infrastructure and service capabilities, better supporting offshore and mega projects in the oil and gas industry.

Источник изображений: https://wadeadams.com/projects/mugharraq-port-construction/

Порт Альтамира – расширение терминала многократного использования

Порт Альтамира – расширение терминала многократного использования

Altamira Port, located on the Gulf of Mexico in Tamaulipas, Mexico, is a key hub connecting with 125 ports worldwide. It handles a wide range of cargo, including liquid and dry bulk, petrochemicals, LNG, containers, and general cargo, serving an important industrial and economic region.

As part of its expansion to strengthen Mexico’s position as a global logistics platform, Dextra supplied 174 tons of grade 700 marine tie bars to anchor the sea walls during the project.

Additionally, Сонитек, a sonic tube solution, was used for CSL (crosshole sonic logging) testing of foundation piles in the quay. This technique ensures the structural integrity and homogeneity of concrete in the piles by measuring the speed of ultrasonic pulses.

Источник изображений: Справочник порта Альтамира за 2008–2009 годы, подготовленный Land & Marine Publications Ltd по поручению Administración Portuaria Integral de Altamira, SA de CV (API Altamira).

Сет-Порт

Сет-Порт

Порт Сет, расположенный на Средиземном море, является крупнейшим рыболовецким портом на юге Франции, а также обслуживает многочисленные паромные маршруты в Северную Африку, включая Танжер. В рамках своих усилий по увеличению контейнерной мощности порт добавляет новый причал (причал H) глубиной 15 метров, чтобы улучшить как обработку, так и хранение контейнеров.

Для поддержки подрядчика Soletanche-Bachy в строительстве этого нового причала компания Dextra спроектировала и поставила 74 крупных Морской галстук-бар сборки, самые большие в нашем ассортименте на M160. Эти сборки большого диаметра уменьшают количество требуемых наборов за счет увеличения расстояния между каждым стержнем.

Стяжки были закреплены в D-Wall с помощью шариковых сепараторов, которые допускают угол поворота 10° во всех направлениях. После выемки грунта шариковые сепараторы были открыты, чтобы обеспечить повторное соединение резьбовых концов стержней.

King Power Mahanakhon, Thailand

King Power Mahanakhon, Thailand

King Power Mahanakhon is a 77-storey skyscraper in Bangkok. Standing at 314 meters, it became Thailand’s tallest building upon its completion in 2016. Mahanakhon is located in Silom, Bangkok’s busiest business district, directly above the Chong Nonsi BTS Skytrain station. The project was developed by PACE and built by Bouygues-Thai.

Фонды

Building foundations in Bangkok is always a challenge. With the city situated on sandy and humid soils, foundations must be deep, and most projects feature thick мембранные стены (D-Walls) to prevent water infiltration.

For the D-Walls of Mahanakhon, Dextra supplied Бартек rebar couplers that were mounted on hook bars, installed horizontally, and cast in concrete. This application allows for the reconnection of bars to the D-Wall at a later stage when starting slab подкрепление.

Additionally, стержни с головкой were installed in the thick foundation mat. Бары во главе are a superior alternative to крючковые стержни in congested areas, offering high-performance anchorage while being easier to install.

Надстройка

The tower is built around a core wall, constructed using slip-formwork, and is surrounded by 12 mega columns. To connect the columns to the core wall, Dextra supplied Bouygues-Thai with its renowned Бартек решение. Бартек couplers, installed flush with the formwork and cast in concrete, allow for second-phase bar reconnection, bridging the columns and core wall.

In the mega columns, rebar couplers were also used to perform bar-to-bar vertical connections.

Скайбар

For the rooftop skybar, Dextra supplied Tension Rod Systems. These systems, equipped with fork ends, provide aesthetic and efficient anchorage, making installation simple and effective.

Гранд Париж Экспресс – Линия 14

Гранд Париж Экспресс – Линия 14

Grand Paris Express — это крупный городской транспортный проект, реализуемый по всей французской столице. Проект добавит четыре новые линии (линии 15, 16, 17 и 18) и расширит две существующие линии (11 и 14).

Dextra участвовала в нескольких пакетах станций через своих местных партнеров-дистрибьюторов. В частности, на линии 14 Dextra поставила арматурные муфты Fortec на станции Орсэ и Понт-Кардине.

Для станции Банье на севере Парижа, расположенной на пересечении линии метро 4 и будущей линии 15, компания Dextra поставила свое Активные якоря ASTEC.

Активные якоря ASTEC являются предпочтительным решением для работ на станциях метро, поскольку туннелепроходческие машины и землеройное оборудование могут просто перерезать FRP-напрягатели анкеров на любой стадии, устраняя необходимость в ненадежном и дорогостоящем удалении анкеров. Решение было одобрено для этого проекта консалтинговой фирмой SYSTRA.

После многочисленных успешных проектов на Ближнем Востоке, это был первый случай Активные якоря ASTEC (недавняя инновация Dextra) были установлены в Европе.