Декстра Групп | Надежные соединения

Метро Лакхнау – Фаза 1

Метро Лакхнау – Фаза 1

The Lucknow Metro project is built to serve the growing population of Uttar Pradesh, North India, as well as to serve the areas that are not connected by the existing rail system. The 35km rail system comprises 22 stations, of which 19 will be elevated.

The first phase of the project consists construction of 2 rail lines (North- South and East-West corridor), connecting the four corners of Lucknow by running through the heart of the city. Being implemented by Lucknow Metro Rail Corporation (LMRC), the Phase 1 comprises the construction of 22.8km long North-South corridor.

The priority section is the 8.5 kilometers linking Transport Nagar to Charbagh.
Once operational, the Lucknow Metro will help ease the traffic in the city, and will also reduce commuters’ travel time.

Транзитная линия легкорельсового транспорта 3

Транзитная линия легкорельсового транспорта 3

The 37km-long Light Rail Transit Line 3 (LRT3) is a light rail line under development in Malaysia. It includes a 35km viaduct and a 2km underground tunnel which will link Bandar Utama with Johan Setia in Klang.

Developed in line with the Greater Kuala Lumpur/Klang Valley (GKL/KV) Land Public Transport Masterplan, LRT3 will play a strategic part in extending rail connectivity to the Western Corridor of GKL/KV.

Dextra provided cuttable Glass Fiber Reinforced Polymer (GFRP) soft-eye solutions, installed in diaphragm walls of escape shafts, in order to facilitate the underground tunnel breakthrough by the Tunnel Boring Machines (TBM).

The LRT3 project is expected to serve 2-million people across the alignment by improving connectivity, alleviating traffic congestion and stimulating economic growth along the Western Corridor of Klang Valley, from Klang to Petaling Jaya.

The construction is scheduled for completion by February 2024.

Панама, линия метро 3

Панама, линия метро 3

Панамская линия метро 3 — это монорельсовая линия длиной 34 км, разрабатываемая в рамках проекта метро Панамы. Это будет крупнейший проект в стране со времени расширения Панамского канала.

Линия свяжет провинцию Панама-Оэсте с провинцией Панама, сократив среднее время в пути вдвое — с 90 минут до 45 минут. Монорельсовая система станет первой в Америке, в которой будет использоваться японская технология.

Dextra supplied 260,000 Бартек couplers for the elevated monorail structure’s piling column and precast beam connection.

Сонитек tubes were also used to examine the concrete integrity of bore-piles using the crosshole sonic logging testing method.

Ожидается, что линия начнет работу в середине 2025 года. Линия принесет пользу более чем 500 000 жителям провинции Панама-Оэсте.

Изображение предоставлено: Канал YouTube Linea 3 del Metro de Panamá, www.elmetrodepanama.com

Метро Лимы

Метро Лимы

Метро Лимы — это система скоростного транспорта в Перу, которая в настоящее время соединяет район Вилла-Сальвадор на юге Лимы с Сан-Хуан-де-Луриганчо в северо-восточной части города. Линия метро 1 начала свою работу в 2011 году с 26 станциями общей протяженностью 34,6 км, это самая длинная линия метро в Америке.

Декстра гордится тем, что вносит свой вклад в строительство линии метро 2 и начального этапа линии 4, которые были начаты одновременно в 2016 году. Линия 2, 27-километровый полностью подземный транзитный маршрут, беспрепятственно соединит район Ате в Лиме с регионом Кальяо. Между тем, первый 8-километровый сегмент линии 4 будет служить важнейшим связующим звеном между линией 2 и станцией международного аэропорта имени Хорхе Чавеса, улучшая связь как для пассажиров, так и для путешественников.

Более 160 000 Роллтек На строительную площадку метрополитена были доставлены арматурные муфты, позволяющие избежать затора арматуры при традиционном методе нахлеста.

Несколько типов Роллтек В различных частях конструкций станций были установлены сцепные устройства, в том числе стандартные сцепные устройства типоразмера #8, #11 и #14, а также переходные сцепные устройства типоразмера #8 и #11.

Полная линия будет введена в эксплуатацию в 2024 году.

Этихад Рейл

Этихад Рейл

Etihad Rail is a 1,200-kilometer railway project that will be the first national freight and passenger railway network in the United Arab Emirates (UAE), connecting the seven emirates and promoting trade and social development in the country and across the GCC countries.

Ожидается, что железнодорожный проект станет устойчивой альтернативой грузовым и пассажирским перевозкам в городских и сельских районах Эмирата. Ожидается, что он будет перевозить около 16 миллионов пассажиров и 50 миллионов тонн грузов. Это внесет значительный вклад в снижение выбросов от дорожного движения.

Сеть Etihad Rail достигает границ Катара и Саудовской Аравии на западе. Западный участок соединяется с Саудовской Аравией через Гвейфат, а восточный участок соединяется с Оманом через Аль-Айн. Железнодорожная линия соединяет Абу-Даби, Шарджу и Дубай и проходит через территорию Эмирата. Затем он направляется в северные эмираты и Фуджейру.

Железнодорожная сеть будет построена в 3 этапа. Первая очередь железнодорожной сети, открывшаяся в 2016 году, представляет собой западный участок длиной 266 километров между Аль-Рувайсом и Шахом. Он соединяет Рувайс и Хабшан, а затем Хабшан и Шах.

Второй этап соединяет Абу-Даби с Дубаем. Он также связан с портами Джебель-Али, Мусаффа и Халифа. Третий этап предполагает подключение северных Эмиратов. Второй и третий этапы планируется завершить в 2024 году.

В настоящее время Dextra поставляет различные инженерные решения для второго этапа строительства железнодорожной сети, который включает строительство 200-километровой главной линии в Абу-Даби и 40-километровой ветки до порта Халифа, 78-километровой главной линии в Дубае и 20-километровой ветки до Джебела. Порт Али, 98-километровая магистральная линия от Шарджи до Фуджейры и 29-километровая ветка до Тавиина, а также сопутствующие объекты.

Эти решения были доставлены на площадку строительства железнодорожного тоннеля.

Источник верхнего изображения: https://filipinotimes.net/news/2019/12/19/coming-soon-rail-network-linking-dubai-fujairah-khorffakan-ports/

Перенос очистных сооружений Ша Тин в пещеры

Перенос очистных сооружений Ша Тин в пещеры

The Sha Tin Sewage Treatment Works Relocation project was aimed to relocate the Sha Tin Sewage Treatment Works (STW) in Sha Tin, Hong Kong, which is currently located at the mouth of the Shing Mun River, to the cavern site at Nui Po Shan of A Kung Kok on the opposite bank, freeing up the existing site for uses beneficial to people’s livelihood and improving the local living environment.

The future Sha Tin Cavern STW will be the largest of its kind in Hong Kong, occupying 14 hectares of land. It will have the same treatment capacity as the current site, but will use advanced sewage treatment technology to meet local population demands and improve services for residents.

For the tunneling works, Dextra has supplied around 800 pieces of GEOTEC™ GFRP rock-bolts for the tunnel’s temporary supporting.

GEOTEC™ GFRP rock-bolts are made of cut-able glass fiber reinforced polymers, making them perfect for face bolting or any other tunneling and mining application where further excavation is required.

Источник изображений: https://ststwincaverns.hk/

Сингапурская кольцевая линия (CCL) – этап 6

Сингапурская кольцевая линия (CCL) – этап 6

The Circle Line (CCL) is an underground Mass Rapid Transit (MRT) line in Singapore. The 35km, 30-station line runs from Dhoby Ghaut to Marina Bay in the Central Area to HarbourFront.

Это одна из самых длинных в мире линий скоростного транспорта без водителя.

In 2013, the Circle Line stage 6 was announced, a 4km extension to finally close the circle of the CCL by connecting HarbourFront station to Marina Bay station.

Еще три станции находятся в стадии строительства и, как ожидается, будут введены в эксплуатацию в 2025 году.

Well-known expertise and quality in concrete reinforcement solutions were necessary to tackle this project, and Dextra’s Бартек couplers were chosen for several parts of the Circle Line structure, including starter bars, slabs, and column joints.

К концу проекта на объект будет доставлено около 200 000 муфт.

Более того, Декстра provided 3,000m of Glass Fiber Reinforced Polymer (GFRP) rebars, that can boast some key benefits with respect to metal rebars: a lighter weight, no risk of corrosion, and a lower susceptibility to attract lightning strikes.

On top of that, Декстра was entrusted with the reinforcement of the concrete structure of the tunnels: 8 Astec Soft-Eyes were used to facilitate the penetration of the Tunnel Boring Machines (TBM) through diaphragm walls, thanks to their innovative cuttable GFRP structure.

Лесной город Джохор (森林城市)

Лесной город Джохор (森林城市)

Форест-Сити — это массивный городской комплекс смешанного назначения, расположенный на юге Малайзии, в регионе Искандар, штат Джохор. Строительство ведется на мелиорированных землях прямо через Джохор-Стрит, недалеко от Сингапура.

Проект, который будет продолжаться в течение следующего десятилетия, направлен в конечном итоге на создание 300 000 жилых единиц, в которых проживут до 700 000 человек, а также многочисленных коммерческих зданий.

The Forest City project is expected to fuel the region’s economy, as well as Singapore, as light rail and road links will ultimately make the connection across the island state.

Декстра has been involved since the early phases of the project for the supply of its Гроутек С precast solution. Гроутек allow the swift connection of precast columns and panels, without the need of in situ joints, speeding up the construction project. For the Forest City Project, Гроутек С Для соединения панелей, образующих несущие стены жилых башен, использовались муфты (компактные модели).

The Forest City project is supported by the installation at site of several sets of Бартек threading equipment, which prepare the bars with threads in order to perform the connection with the top part of the Гроутек С sleeve. The Dextra aftersales team also provided training and support in order to guarantee high production output during the project duration.

For more information about Декстра solutions in Asia, please contact our Офис в Бангкоке

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm, UAE

Emirates’ Bustanica Vertical Farm is the world’s largest vertical farm, a sprawling indoor farming facility spanning an impressive 330,000 square feet. This state-of-the-art facility plays a crucial role in providing fresh, locally sourced in-flight food for Emirates and several other airlines operating at Dubai International Airport. At the core of this groundbreaking project lies meticulous engineering, and one crucial component that contributes to its success is the use of Dextra Гроутек couplers for the precast shear wall module connections.

This vertical farm employs cutting-edge technology to cultivate a diverse range of crops in a controlled environment. By stacking layers of crops vertically, the facility maximizes space utilization while minimizing resource consumption. The result is a sustainable and efficient system that produces fresh, high-quality produce year-round, regardless of external climatic conditions.

The Role of Dextra Groutec Couplers

In any construction project, the choice of materials and components is critical to ensuring structural integrity and long-term durability. In the case of the world’s largest vertical farm, the engineers faced the challenge of connecting precast shear wall modules securely. The solution came in the form of Гроутек Л couplers with a diameter of 25mm.

Гроутек couplers are renowned for their reliability and strength in connecting precast concrete elements. These couplers provide a robust and efficient means of joining precast concrete components, ensuring the structural stability of the entire facility. The 25mm diameter was carefully selected to meet the specific requirements of the shear wall modules, offering a seamless connection that enhances the overall resilience of the vertical farm.

The Groutec couplers not only facilitate the structural integrity of the vertical farm but also align with the project’s commitment to sustainability. The durability and reliability of these couplers ensure that the connections withstand the test of time, supporting the longevity of the facility and its contribution to sustainable agriculture.

Пакет 1 AVE Palencia-Santander HSR (Паленсия – Паленсия Норте) и пакет 2 (Паленсия Норте – Амуско)

AVE Palencia-Santander high-speed rail project is a significant infrastructure undertaking aimed at connecting Palencia and Santander in Spain. This project involves the construction of extensive railway networks, viaducts, and bridges, underscoring the need for a strong and resilient foundation. Recognising the critical importance of ensuring the structural integrity of the concrete piles, the project management sought advanced testing methodologies.

Декстра played a pivotal role in ensuring the robustness of the project’s foundation by supplying Сонитек Crosshole Sonic Logging (CSL) testing tubes. These tubes were instrumental in conducting comprehensive structural integrity tests on the concrete piles of AVE Palencia-Santander USR Package 1 (Palencia – Palencia Norte) and Package 2 (Palencia Norte – Amusco).

Межскважинный ультразвуковой каротаж — это метод неразрушающего контроля, широко используемый для оценки качества и целостности бетонных свай. Он предполагает использование звуковых волн, передаваемых через бетон между двумя трубками доступа, что позволяет инженерам оценить свойства материала и выявить потенциальные дефекты.

Сонитек tubes are specially designed for Crosshole Sonic Logging, ensuring precise and reliable data collection during structural integrity tests. These tubes are embedded in the concrete piles during construction, providing access points for the sonic wave transmission.