Декстра Групп | Надежные соединения

Поиск
Закройте это окно поиска.
Поиск
Закройте это окно поиска.

Метро Нагпура, Reach-1 (линия 1)

Метро Нагпура, Reach-1 (линия 1)

Nagpur, the second capital of Maharashtra and one of the fastest developing city in India is witnessing major growth in terms of Infrastructure. The development encompasses primarily the connectivity, of which Metro rail becomes a major part.

Incepted in 2016, the metro project is being a subject of acclaimed discussion for its speed of execution and the quality of construction.

Within the city boundaries, it requires the highest standards of safety considerations including the seismic analysis of structure in service life.

Project Requirement

The fast track project has typical structure for its Line 1 alignment, where the viaducts are supporting 2 levels of pathways, lower one for NH-7 and upper one for the metro rail. As the impact loading is a big concern due to train movement.
Being the stretch of always busy traffic, a solution was required which does not have to revise the existing design. Plus a major concern was the impact on speed of the otherwise fast moving project. The issue was concerning to all the stakeholders especially the GC for the project, who were looking to maintain the agility as well as find a sustainable solution.

Solution

Dextra Introduced Shear Key Bars for the priority section allowing the structure to neutralize the seismic forces. This not only helped the contractor to get the work done faster, but also enabled the client to go for the trial run earlier than expected.

Метро Дохи, золотая линия – станция C-Ring Al Sadd

Метро Дохи, золотая линия – станция C-Ring Al Sadd

The Doha Metro is a rapid transportation system, designed as an integral component to the larger Qatar rail network. This country wide mega-scale infrastructural project consists of 300km of rail and 100 stations. The rail network to reduce traffic congestion, and to connect the people of Qatar with the rest of the GCC region. At the city scale, currently under construction, the metro is projected to be operational by the end of 2019. It will serve Doha and its surrounding suburbs with stations located in all major nodes of the metropolis. Doha Metro will be operating both at grade and below grade, with the majority of the metro project being underground. Complex tunneling and soil retaining solutions by Dextra were utilized in the construction of this project.

Glass Fiber Reinforced Polymers (GFRP) as Tie-back anchors to retain soil

To eliminate concerns of encroachment, and obstacle for future construction projects, the Diaphragm Wall (D-Wall) at Al Sadd C-Ring Station were post-tensioned anchored with ASTEC Active Active Anchor. These high performance, fully cut-able GFRP anchors were chosen by ALSYJ JV contractors and the D-Wall anchors of choice. This innovative solution was chosen because it can be cut by Tunnel Boring Machines (TBM) or standard excavation equipment, it also doesn’t need to be removed from the ground even in temporary applications. For Al Sadd C-Ring Station 7,113 strands for GFRP rebars were used to make approximately 700 ground retaining anchors used in the D-WALL around that station.

2-й HCMC по санитарии окружающей среды

2-й HCMC по санитарии окружающей среды

The Second Ho Chi Minh City Environmental Sanitation Project consists of the construction of interceptor that will convey the wastewater collected from the Nhiêu Lộc-Thị Nghè Canal and District 2 areas of Ho Chi Minh City to the treatment plant.

Dextra has been involved in the construction of the large underground system by supplying 40 Soft-Eyes to assist in the tunnel breakthroughs.

The cuttable Glass Fiber Reinforced Polymer (GFRP) Soft-Eyes were applied to reinforce 21 shafts, allowing the penetration by the Tunnel Boring Machine (TBM) without the need of removing steel reinforcement and without the risk to damage the TBM’s head.

With its completion, planned to be in 2022, the wastewater services in HCMC will have a considerably more sustainable nature, and will be remembered as the first big step toward the alleviation of the environmental and sanitation issues of the Country.

Doha Metro Rail – Phase 1

Doha Metro Rail – Phase 1

Doha Metro Phase 1 is Qatar’s mega infrastructure project of three metro lines with a total length of 164 km. The first phase involves the construction of red, green and gold lines and their major stations. It is a part of a US$36,000 million Doha Metro Rail Network Project, aiming to reduce the city’s road traffic congestion while facilitating the connection between Qatar and other Gulf countries.

The required completion period of this project is extremely short: with excavation starting in mid-2013 and operations expected by 2019. With the timeline of the project being constrained, high innovative solutions are required to complete the building of underground structures in a minimal amount of time.

Dextra’s FRP Active Anchors as temporary tie-backs in retaining walls

Composite materials have been used for over 20 years as temporary reinforcement in concrete structures. In Doha metro phase 1, both Dextra’s post-tensions carbon-FRP (CFRP) Active Anchors and glass-FRP (GFRP) Active Anchors have been used in retaining walls. When used as temporary tie-backs, CFRP material is offering the most advanced technical solution thanks to its superior properties in tensile, creep and durability, while the GFRP Anchors offers a cost-effective solution without technical compromise.

GFRP anchors can advantageously replace steel removable anchors to prevent encroachment of neighboring plots. This is why nowadays, GFRP anchors account for more than 90% of the FRP anchors installed in the region.

For the first phase of the Doha Metro Rail Network project, Dextra has been supplying 150 CFRP Active Anchors and 700 GFRP Active Anchors to date.

ASTEC Soft-Eye for a better penetration of TBMs

Dextra’s ASTEC Soft-Eyes is a unique technology using cut-able GFRP reinforcement as a replacement of conventional steel rebars. Since 1996, this solution has become a standard concept in the design of shafts and subway stations. More than 10 sets of Dextra’s ASTEC Soft-Eyes have been supplied and used in Doha Metro construction project as per May 2018.

Mexico – Toluca Inter-city train (Tren Interurbano México – Toluca)

Mexico – Toluca Inter-city train (Tren Interurbano México – Toluca)

To reduce traffic congestion on Mexico – Toluca highway, as well as to ease connections between both cities, the Secreatariat of Commuciations and Transportaion (SCT) is undergoing the construction of the new Mexico city areas’ 55.7-kilometer rail line. Aiming to be an environment-friendly project, the commuter rail line includes 4.7-kilometer double-tube tunnel in highly complex terrain and natural protected areas.

The new train will connect Toluca Valley to Mexico City, and will provide a service to an estimated 270,000 commuters. The line included 6 stations: 2 terminals (Zinacantepec and Observatorio) and 4 intermediate (Cristobal Colon, Metepec, Lerma, and Santa Fe). It will also be a backbone for Mexico City area’s regional and urban transport.

The construction being initiated in 2015, the railway is scheduled for completion in 2019.

Light and productive rebar coupler solution for the construction project

For the reinforcement of the railways concrete structures, Dextra supplied more than 100,000 Rolltec splices. The system is a practical and economic alternative to laps. Rolltec is also supported by one rebar preparation equipment, and only one man is needed to operate the machine.

Plus, thanks to the performance of our machines, the thread is ready in less than 30 seconds!
Moreover, with Rolltec system, the same type of coupler can be used for both standard and position applications, resulting in an optimized inventory of the project.

For more information about our projects in Latin America, contact our Panama Office.

Cairo Metro – Line 3

Cairo Metro – Line 3

Since the first 29km segment of the Metro Line 1 opened in 1987, the Cairo Metro project has revolutionized the transit system in the capital.
Currently the whole network comprises 3 operational lines numbered from 1 to 3. Line 3 consists of four phases, and the first segment started operation in 2012.

Three new metro stations were opened as part of the fourth phase of the third line on June 15, 2019, a week before the kickoff of the 2019 African Cup of Nations (AFCON) in Cairo.

Dextra has continuously provided construction solutions since the operation of Line 2 in 2000, delivering since then more than:

-1,400,000 rebar couplers

-7,000 sonic tubes

-60 soft-eyes

Bartec rebar couplers are used for rebar reinforcement of tunnel and station structures on both underground and elevated metro lines as a way to reduce steel congestion and improve tensile connection.

Moreover, the integrity test of the metro foundations using the Cross Sonic Logging (CSL) testing method was facilitated by the usage of SONITEC sonic tubes, designed for easy assembly and installation in reinforcement cages.

Dextra’s ASTEC soft-eyes are made of GFRP rebar to reinforce D-Walls in underground tunnels, which can easily be cut by Tunnel Boring Machine (TBM), resulting in time and money savings.

The project is still ongoing and the fourth line of the Cairo Metro is expected to start operation in 2020.

Метро Нагпура, станция метро Zero Mile

Метро Нагпура, станция метро Zero Mile

Станция метро «Нулевая миля Нагпура» в рамках многофункционального транспортного, парковочного и коммерческого проекта, реализуемого в городе Нагпур, штат Махараштра. Он расположен на новой линии метро, пересекающей город с севера на юг. Станция «Нулевая миля» — это станция метро, объединенная с 12-этажным зданием, в котором разместятся коммерческие площади и автостоянка на 430 автомобилей.

В рамках этого проекта в 2017 году компания Dextra участвовала в поставке и установке грунтовых анкеров для стабилизации грунта вокруг зоны раскопок.

Dextra предоставила инновационное решение ASTEC (FRP) Active Anchors (ААА), специальный тип грунтовых анкеров, которые в случае временного применения можно оставить в земле после завершения проекта, даже если они выходят за пределы участка или пересекают будущие туннели.

Действительно, одним из основных преимуществ анкерной планки из стеклопластика является то, что якорь можно полностью разрезать с помощью обычного землеройного оборудования, что делает его лучшей заменой обычным съемным анкерам, которые представляют собой стальные анкеры, которые в конце необходимо удалить из земли грубой силой. проекта.

Активные анкеры Dextra ASTEC легки в транспортировке и могут быть доставлены рабочими к месту назначения. После установки в просверленное отверстие каждый анкер зацементируется, а затем подвергается нагрузке с помощью обычных прядей PT, соединенных с анкером из стеклопластика. После установки анкер может оставаться в земле, в отличие от обычных съемных анкеров, которые требуют дополнительного управления проектом и влекут за собой затраты на удаление анкера по окончании срока службы.

Для получения дополнительной информации о анкерных решениях Dextra в Индии свяжитесь с нашим Офис в Мумбаи.

Метро Хошимина - линия 1 (метро HCMC, Вьетнам)

Метро Хошимина - линия 1 (метро HCMC, Вьетнам)

Метро Хошимина – линия 1 – это первая часть проекта строительства 109-километровой железнодорожной линии мегаполиса, реализуемого Управлением городских железных дорог (MAUR).

Когда это будет достигнуто, система общественного транспорта охватит районы Хошимина 6 линиями метро, что позволит жителям и туристам легко и удобно передвигаться по городу, что приведет к повышению качества городской жизни.

Первый этап проекта заключается в строительстве 19,7-километровой железнодорожной линии, соединяющей рынок Бен Тхань и парк Суой Тьен. Он также включает строительство надземной железной дороги протяженностью 17,1 км с 11 станциями и линии метро длиной 2,6 км с 3 станциями.

Для строительства крупнейшего города Вьетнама Dextra поставляла как арматуру бетона, так и решения для стержневых систем.
Чтобы уменьшить скопление стали в сильно укрепленных зонах, подрядчик Shimizu-Maeda Joint Operation выбрал концевые анкеры Dextra. Стержень с головкой — это простая альтернатива крюкам для арматуры.

Монтаж осуществляется путем привинчивания компактной анкерной пластины к концу арматурного стержня. Решение в конечном итоге упрощает процесс, что приводит к улучшению качества бетонирования.

Grand Paris Express – Line 15

Grand Paris Express – Line 15

The Grand Paris Express is currently the largest transport project in development in Europe.

The new 200-km, 68-station automated railway network consists of a ring route around Paris (line 15) and three additional lines (16, 17 and 18) connecting adjacent neighborhoods.

These 4 new lines will circle the capital and link to 3 airports and many business districts. It will transport 2 million commuters a day. The lines are planned to open in stages, with the full completion of the project scheduled for 2030.

The construction of line 15 started in 2015, with its first section between Pont de Sèvres Métro station and Noisy – Champs RER A station.

Dextra was involved at that stage by providing 100,000 Fortec rebar couplers to connect the columns of the stations’ structure.

Additionally, Dextra supplied 15,000 meters of Sonitec sonic tubes to facilitate the structural integrity testing using the CSL (Cross Sonic Logging) method, thus ensuring the homogeneity of concrete within the deep piles and diaphragm walls that are being constructed for the future underground stations.

The first section of line 15 is scheduled to open in 2020.

Глубокая туннельная канализационная система (DTSS) – Фаза 2

Глубокая туннельная канализационная система (DTSS) – Фаза 2

Глубокая туннельная канализационная система (DTSS) — это проект инфраструктуры использованной воды, разрабатываемый Советом по коммунальным предприятиям (PUB) Сингапура для удовлетворения долгосрочных потребностей страны в чистой воде.

DTSS использует глубокие туннели для транспортировки использованной воды на 3 централизованные водоочистные станции (WRP), расположенные в прибрежных районах.

Использованная вода затем очищается и далее очищается до чистой воды, которая подается под торговой маркой NEWater, а излишки очищенных сточных вод сбрасываются в море через водосточные трубы.

Проект предполагает строительство двух больших туннелей диаметром 6,5 м и общей длиной 80 км, расположенных примерно на 50 м ниже поверхности земли, для подачи сточных вод к 3 централизованным водосборным станциям.

Проект разрабатывается в два этапа. Первый этап был завершен в 2008 году и включает в себя систему глубоких туннелей длиной 48 км для направления потока воды из существующих самотечных канализационных коллекторов в WRP Чанги на востоке и WRP Кранджи на севере.

На втором этапе система туннелей будет расширена на запад через 30-километровый южный туннель, 60-километровые канализационные коллекторы, Туас-РП и 12-километровый глубоководный водосток.

Для второго этапа компания Dextra поставила 1210 анкеров для стабилизации выемок туннеля и 8 стеклопластиковых креплений Soft-Eyes для прорыва ТБМ.

Soft Eye & Rock Bolt

По завершении второго этапа, который ожидается в 2022 году, завод NEWater на заводе Tuas WRP обеспечит 55% общей потребности Сингапура в воде.

Кроме того, Tuas WRP будет очищать 800 000 кубических метров использованной воды в день, что сделает его крупнейшим мембранным биореактором в мире.

Пожалуйста, введите вашу информацию

Связаться с нами

   Поделитесь с нами своей информацией, и мы свяжемся с вами как можно скорее.