Декстра Групп | Надежные соединения

Бангкок Арена

Бангкок Арена

The Bangkok Arena is a multisport indoor arena located in the Nong Chok district, east of Bangkok. Originally commissioned to host futsal tournaments, an indoor version of football, the arena now also hosts volleyball and basketball events, as well as concerts. It has a seating capacity of up to 12,000 people.

For this project, Dextra engineered and supplied the Натяжные стержни suspending the roof of the building in 2012.

The long architectural bar systems are anchored to concrete pylons and act as suspenders to support the building’s roofing structure.

For this project, Натяжные стержни were supplied in Grade 700, the highest in our range. The highest grade allows for a better performance-to-steel ratio, enabling the use of smaller diameters. This results in a slimmer structure and overall improved aesthetics. Additionally, smaller-diameter bars and lighter elements facilitate easier handling and installation on-site.

Each bar segment is spliced to the next using either couplers (for fixed lengths) or turnbuckles (for length adjustment and tensioning).

Connection to the concrete structure is achieved through fork ends mounted onto steel gusset plates.

In total, more than 129 tons of Натяжные стержни anchor the roof structure, with tendons exceeding 30 meters in length.

Плотина Чагла

Плотина Чагла

Chaglla Dam is a hydroelectric dam built on the Huallaga River in the Huánuco region of Peru. The dam stands 203 meters high and has a maximum installed capacity of 456 MW.

For this major dam project, Dextra consistently supplied its Rolltec rebar coupler solution to Brazilian contractor Odebrecht from 2012 to 2015.

Rolltec is the most popular rebar splicing solution in Latin America, offering a competitive alternative to lap splices.

Rebar preparation is supported by a unique lightweight machine, which can be operated by a single person. The Rolltec machine is relatively easy to transport and convenient to install, even in remote locations such as dam construction sites.

Beyond just couplers and equipment, Dextra also took charge of machine commissioning and operator training, ensuring the contractor’s team made the most of their rebar coupler solution.

Станция метро Дохи Мшейреб

Станция метро Дохи Мшейреб

Станция Мшейреб — главная пересадочная станция метро Дохи. Расположенный в центре Дохи, он соединяет все три линии (красную, зеленую и золотую) и станет воротами к стадионам чемпионата мира по футболу 2022 года.

Станция Мшейреб станет одной из крупнейших по размеру станций метро в мире.

Мягкие глаза для ТБМ

Для этого крупного проекта компания Dextra спроектировала и поставила в период с 2013 по 2015 год 8 крупных Мягкие глазки ASTEC GFRP, диаметром 8 метров каждая. Мягкие проушины представляют собой каркасы из арматуры GFRP, расположенные в стенах D между стальными сегментами. Мягкие проушины GFRP позволяют проходческим комбайнам (TBM) проходить за минимальное время, поскольку арматура может быть легко раздавлена комбайном.

Анкеры с завязками

Для закрепления массивных стен D и предотвращения смещения грунта во время земляных работ компания Dextra также поставила Активные якоря ASTEC (AAA). Эти инновационные анкеры на основе GFRP с пост-напряжением обладают тем преимуществом, что их можно резать с помощью туннельных буровых машин или стандартного оборудования для земляных работ. Поскольку их можно легко резать, их не нужно извлекать из земли, даже если они используются для временного применения.

В случае со станциями Мшейреб многожильные анкеры (по 10 на якорь в этом проекте) даже были установлены в центре Soft-Eye для закрепления D-стены. Эти якоря также были срезаны во время прорыва туннеля (видно на видео ниже). Всего на станции было установлено 150 якорей.

Терминал 5 аэропорта Хитроу

Терминал 5 аэропорта Хитроу

Heathrow Airport, located approximately 25 km west of central London, is the busiest international airport in the United Kingdom.

Dextra was involved in the construction of Terminal 5 and its associated structures.

For Heathrow Airport, Dextra provided its most advanced rebar решение для сращивания: Griptec, which is distributed in the United Kingdom by local expert fabricators.

Due to its high performance, inherent reliability, systematic proof loading of every connection in factory conditions, and comprehensive certification, Griptec is specified by major consultants worldwide. In the United Kingdom, Griptec holds all three CARES splicing product certificates: TA1-A, TA1-B, and TA1-C.

For our distributors servicing rebar preparation, the Griptec solution is both convenient and productive. It is supported by a smart machine operated by a single operator, offers highly efficient cycle times (approximately 45 seconds per rebar prepared), and includes a test that systematically proof loads each and every bar/sleeve connection.

For contractors, Griptec provides a simple, effective, and reliable way to connect rebar in columns, мембранные стены, and slabs. One application at Heathrow was for the roof of the new underground station. Griptec connections were also used to create temporary openings that allowed workers and equipment to move freely through the rebar structure and could easily be “closed” using single lengths of rebar with Griptec connections at both ends.

Thanks to its parallel-thread technology, Griptec does not require any specific torque wrenching and can be verified through simple visual inspection, offering a significant advantage in simplifying the project schedule and maximizing operational productivity.

Петронас РАПИД

Petronas RAPID: A Strategic Petrochemical Complex in Malaysia

Petronas RAPID (Refinery And Petrochemical Integrated Development) is a large-scale petrochemical complex located in the southernmost part of Johor, Malaysia, across the sea from Singapore.

Commissioned in 2016, the RAPID development aims to increase local production capacity by 300,000 barrels per day, making it a strategic asset for the Malaysian peninsula.

For this project, Dextra supplied its Бартек system for the construction of precast pipe racks across the site. A total of 30,000 Бартек Бары во главе were used to create horizontal anchoring points for pipe rack beams.

To support the project, a Бартек machine was installed directly on-site and commissioned by the Dextra team, ensuring efficient bar preparation and seamless integration into the construction process.

Стадион Рас-Абу-Абуд, место проведения чемпионата мира по футболу 2022 года.

Стадион Рас-Абу-Абуд, место проведения чемпионата мира по футболу 2022 года.

Ras Abu Aboud Stadium is a football stadium under construction in Doha, Qatar, with a capacity of 40,000 spectators.

This project has been specifically designed to host the 2022 FIFA World Cup. The stadium features a modular design, incorporating recycled shipping containers, removable seats, and other modular building blocks. After the tournament, it will be completely dismantled and repurposed.

Dextra supplied more than 600 sets of carbon steel натяжные стержни for the cross-bracing of the roofing and bowl structures, as well as for staircases, catwalks, and ramps. The натяжные стержни range in bar thread size from M20 (diameter 19 mm) to M72 (diameter 70 mm).

Upon its expected completion in 2020, Ras Abu Aboud Stadium will set a new standard in sustainable construction design.

Рекордная установка по очистке сточных вод в Египте

Рекордная установка по очистке сточных вод в Египте

The Bahr El Baqar wastewater treatment plant is located in the northern governorate of Port Said and has a daily output capacity of 5.6 million cubic meters. It is a joint venture between the Arab Contractors Company и Orascom Construction.

The plant is the world’s largest of its kind, holding three Guinness World Records:

  • The largest water treatment facility, processing 64.8 cubic meters per second
  • The largest sludge treatment plant
  • The largest single-operator ozone generating plant

Dextra is proud to contribute to this project by supplying Rolltec rebar couplers for the reinforcement of the plant’s concrete structures.

Rolltec is a CARES-approved, rolled parallel-threaded mechanical splicing system designed for connecting concrete reinforcing bars from Ø12 to 50 mm (ASTM #4 to #18). It offers fast and easy preparation and installation on-site.

Источник изображений: https://www.arabcont.com/english/project-624.

Аэропорт Дубая

Аэропорт Дубая

Dubai Airport is the main airport in the United Arab Emirates. The famous airport, located just a few kilometers north of Dubai city, is home to the renowned Emirates airline. Dubai International Airport is the world’s #1 airport in terms of international passenger traffic.

Dextra Middle East, also based in Dubai, has been involved in numerous projects related to the construction of Dubai Airport, particularly from 2003 to 2005, during the development of Terminal 3 and the associated concourses.

For the Dubai International Project, Dextra supplied its popular Bartec coupler solution, the leading rebar coupler solution in the UAE. A total of 1.5 million couplers were used at Dubai International Airport.

Надстройка

Bartec couplers provided a technical solution for reconnecting second-phase reinforcement between columns and beams, as well as between walls and beams.

Rebar couplers were also used to create temporary openings in the reinforcement, allowing the passage of personnel and equipment.

Фонды

Bartec couplers were utilized for the foundation piles. In this application, the couplers became part of a highly integrated and automated cage manufacturing process, enabling the quick connection of large-diameter rebar and maximizing cage production output.

To complement the Bartec rebar coupler solution, Dextra Sonitec tubes were used to ensure the swift installation and reconnection of the sonic tubes along the entire length of the cages. Sonitec tubes are particularly easy to install due to their Push-Fit rubber mouth and easy to set up in the cage thanks to their welded heads. Over the years, more than 1,800,000 meters of Sonitec tubes have been installed at Dubai International Airport!

Бангкок БТС

Бангкок БТС

Bangkok Mass Transit System (BTS) — крупная городская система надземного метро, расположенная в Бангкоке, столице Таиланда. Система была открыта в 1999 году.

По состоянию на 2017 год система состоит из 24 надземных станций и 37 км надземных железнодорожных путей, организованных в две основные линии, пересекающиеся на центральной станции Сиам.

Система BTS находится в процессе расширения двух основных линий, при этом ожидается, что новые участки линий и станции будут введены в эксплуатацию в 2019 и 2020 годах.

Фонды

На протяжении многих лет компания Dextra поставляла для различных пакетов Сонитек трубки, которые используются для испытания бетонных свайных фундаментов под станциями и путями.

В общей сложности Dextra поставила около 40 000 погонных метров трубок Sonitec, что фактически эквивалентно длине самой системы BTS.

Пилоны

Для соединения вертикальных стержней пилонов компания Dextra предложила Бартек решение.

Bartec позволяет подрядчикам легко соединять готовые арматурные каркасы с помощью простой арматурной муфты, что позволяет экономить сталь по сравнению с соединением внахлест и ускоряет работы на площадке.

В Таиланде операция по нарезке поддерживается заводом Dextra, удобно расположенным на северо-востоке Бангкока. Подрядчики получают арматуру уже подготовленной и смонтированной с помощью арматурной муфты.

Водохранилища Килингас

Cylingas Reservoirs: Industrial Gas Storage in the UAE

The Cylingas gas tanks are part of the industrial complex of Cylingas, located in Al Quoz, United Arab Emirates.

For the installation of new gas tanks, Dextra supplied its tension rods systems, which were used for the cross-bracing of the tank footing structure. Carbon steel rods in Grade 355, with a diameter of 120 mm (thread M123), were selected for this application. The rods were delivered with forks, lock covers, and turnbuckles. A total of 48 sets were installed for this project.

The assemblies were fixed onto the pylons using gusset plates connected to the forks. Turnbuckles were installed in the lower part of the assembly to facilitate installation, allowing for length adjustment and stress control by bringing two bar segments closer together.

For more information on Tension Bars in industrial settings, please download our dedicated introduction brochure.

Для получения дополнительной информации о наличии высокопроизводительных барных систем на Ближнем Востоке, пожалуйста, свяжитесь с нашим Офис в Дубае.

Пожалуйста, введите вашу информацию

Связаться с нами

   Поделитесь с нами своей информацией, и мы свяжемся с вами как можно скорее.