Надземный коридор Барапуллы

Надземный коридор Барапуллы

Barapullah Elevated corridor is a major infrastructure project in India. The main purpose of this extension is to ease traffic congestion, as well as to provide a new express connectivity between Indira Gandhi International Airport and east Delhi.

Reinforcing the elevated road with PT bars

For the construction of this flyover, Dextra has been supplying its fully-threaded PT bars, as well as its well-known Bartec rebar splicing solution to the contractor L&T Construction.
The PT bar systems were applied in temporary applications of the construction project. Dextra fully-threaded post-tensioning bars are currently being used for lifting and launching the precast elements of the expressway’s elevated structures.

Атлантический мост в Панаме (Tercer Puente Sobre El Canal De Panamá)

Атлантический мост в Панаме (Tercer Puente Sobre El Canal De Panamá)

The Atlantic Bridge project, also called the Third Bridge Over the Canal, is being developed closed to the Atlantic Ocean entrance of the Panama Canal. This $600M project consists in construction of a 1-kilometer cable-stayed bridge, along with access viaducts on both sides and connections to the existing roads, as well as pedestrian and bicycle lanes. When archived, the bridge will allow vehicles to cross the Panama Canal even when the locks are in operation.

One of the World’s longest concrete cable-stayed bridge with Bartec

With its 530-meter central span and its vertical clearance of 75 meters above sea level allowing the passage of Post-Panamax ships, the four-lane Atlantic Bridge is one of the longest cable-stayed bridges in the World. It is also supported by two delta-shaped main pylons, reaching 212.5 meter height.
Декстра Латинская Америка, with its main office in Panama City, was involved in supplying its rebar splicing solution Bartec for the reinforcement of the bridge’s concrete structure.

More than 350,000 Bartec couplers were delivered to the contractor VINCI Construction Grands Projets for the reinforcement of the bridge’s pile cages, pile caps and pylons for up to #14 (dia. 43 mm.) bars. Plus, three Dextra Bartec machine sets have been used to support the bar-end preparation on site.
Moreover, in order to avoid steel congestion in the heavily reinforced areas, more than 50,000 Dextra end anchors Бары во главе are used in the bridge’s pile caps.

The Atlantic bridge is now in its final construction stage, and is planned to open in early 2019.

Мост Тембуронг

Мост Тембуронг

Мост Тембуронг, также известный как Мост Султана Хаджи Омара Али Сайфуддина, расположен в Брунейском заливе на северо-востоке страны. Имея длину 30 километров и четыре полосы движения, это один из самых длинных морских мостов в мире.

Мост соединяет Сунгай Бесар и Менгкубау. Это позволяет пассажирам путешествовать между двумя территориями, не пересекая Малайзию, минуя четыре иммиграционных контрольно-пропускных пункта на нынешнем маршруте, который часто перегружен.

Компания Dextra приняла участие в этом проекте, поставив 34 000 погонных метров труб Sonitec для проверки целостности свай фундамента с использованием метода испытаний CSL (сквозной акустический каротаж).

Строительство моста началось в 2014 году и официально было открыто для движения в 2020 году.

Источник изображений: https://www.reduper.com/industry/traffic/bridge/sea-bridge/temburong-bridge/

Phuoc Khanh Bridge, Ben Luc – Long Thanh Expressway

Phuoc Khanh Bridge, Ben Luc – Long Thanh Expressway

Phuoc Khanh bridge is a 4.7-kilometer cable-stayed bridge linking Ho Chi Minh City with Dong Nai. The bridge is part of the southern Vietnam’s longest highway, Ben Luc – Long Thanh Expressway, running through Long An province, Ho Chi Minh City and Dong Nai province.
When completed, the highway will connect the south-western region with the south-eastern region of the country, facilitating the transportation between the two parts of the country with improved traffic flow and larger lanes. The project aims to develop the socio-economic activities of this area.

Dextra post-tensioning bars for permanent applications of the bridge

For the construction of the Phuoc Khanh Bridge, Dextra is supplying its post-tensioning bar systems as permanent post-tensioning anchors.
Over 250 high performance fully-threaded post-tensioning bars and over 200 smooth bar systems were delivered to site. Also known as PT bars, they are specifically designed for post-tensioned applications. They can be corrosion-protected as is the case for the equipment supplied in the project. The corrosion protection is done in a controlled facility in Dextra’s factory, before being shipped to site.

To learn more about our products, discover Dextra’s solutions for bridges and viaducts.

Туен Мун – Чек Лап Кок Линк (TM – CLKL)

Туен Мун – Чек Лап Кок Линк (TM – CLKL)

Линия Туэн Мун – Чек Лап Кок (TM – CLKL) – это проект дороги между Северо-Западными Новыми территориями и мостом Гонконг – Чжухай – Макао, аэропортом и Северным Лантау.

Общая длина дороги составляет около 9 км и состоит из двух участков: Северного и Южного.
Northern Connection соединит зону 40 Туен Мун с портом Гонконга через подводный туннель, а Southern Connection свяжет порт Гонконга и остров Северный Лантау с помощью виадуков.

Компания Dextra поставила 100 000 арматурных соединителей Bartec для строительства мембранных стен и туннелей.

Полнофункциональные муфты Bartec являются оптимальной заменой перекрытия арматурных стержней, снижая как стоимость материала, так и скопление арматуры в зоне перехлеста.

Кроме того, чтобы избежать скопления арматуры в вентиляционной конструкции здания, в верхней части колонн было установлено более 50 000 стержней с головками. Грифы с головкой заменяют крючки и длинные разработки с более простым и эффективным креплением.

Southern Connection был открыт в октябре 2018 года. Ожидается, что проект будет полностью сдан в эксплуатацию к 2020 году.

Мост Пумарехо

Мост Пумарехо

Pumarejo Bridge is a 3,200m-long bridge including an 800m-long cable-stayed section and 1,300m of viaducts as well as access roads.

The new cable-stayed bridge is located over the Rio Magdalena river in Barranquilla and the Salamanca Island Road Park in Sitionuevo, Colombia.

It replaces the old Puente Pumarejo: with its two lanes, the old bridge was no longer doing justice to the increased traffic, and it quickly became an obstacle for shipping on the Rio Magdalena due to a clearance below of only 16 meters.

Pumarejo Bridge

View of the new bridge in construction, with the old Pumarejo bridge in the foreground

The new bridge comprises of 6 lanes of traffic (3 lanes each way), 2 side bike paths and a pedestrian path along its side.

Dextra provided rebar connection solutions that were designed to reinforce the concrete structures.

More than 120,000 Rolltec couplers were provided for pier and deck reinforcements.

In addition, over a thousand of Unitec bolted couplers were applied for the connection rebars without the need of threading.

Since its completion, it became the longest road bridge in the country and one of the largest in Latin America.

Source of images: https://www.khl.com/international-construction/colombias-longest-road-bridge/139582.article, https://commons.wikimedia.org/wiki/File:Puente_ pumarejo.jpg

Мост Тейн-Калва-Крик

Мост Тейн-Калва-Крик

Thane-Kalwa Creek Bridge is a nearly 2.4-km long U-shaped road bridge over the Thane creek at Kalwa Naka, India, aiming to ease the traffic congestion between Thane and Navi Mumbai along with congestion in Kalwa and Thane city areas.

Dextra delivered more than 20 sets of Tension Rod system in various lengths (maximum length supplied is ~24m), size M108, grade 700, used as suspenders for basket handle bridge/steel arch bridge.

Tension Rods typically act as bracing or suspension elements and provide the benefits of high strength, length adjustability, ease of installation as well as the ability to be post-tensioned after installation. A wide range of sizes and accessories in various steel grades and in both carbon and stainless steel is available.

The bridge was originally scheduled to be opened in 2020, but the pandemic and the subsequent lockdowns significantly delayed the construction.

Мост Брэила-Тулча

Мост Брэила-Тулча

Мост Брэила-Тулча — строящийся автомобильный подвесной мост через реку Дунай, между Брэилой, крупным городом на востоке Румынии, и противоположным берегом реки в уезде Тулча.

Это будет первый мост через морской сектор реки Дунай, который улучшит транспортную доступность района Галац-Брайла до Констанцы и Тулчи, а также соединит регионы Молдавии и Добруджи.

Подвесной мост будет иметь главный пролет длиной 1974 м, два боковых пролета соответственно по 490 м на берегу реки Брэила и 365 м на берегу реки Тулча, а также два подъездных виадука длиной по 110 м с обеих сторон и соединительный мост. Дорога общей длиной около 23км.

Dextra поставила 280 000 арматурных соединителей Bartec для усиления конструкции подвесного моста.

Соединитель Bartec соответствует требованиям сейсмостойкости по стандарту ISO 15835, категория S2. Он может выдерживать растяжение и сжатие с большой деформацией в случае сильных землетрясений.

Планируется, что строительство моста завершится в 2023 году.

196-километровая междугородная автомагистраль Банг Па-Ин – Накхонратчасима

196-километровая междугородная автомагистраль Банг Па-Ин – Накхонратчасима

Being the new fast-tracks linking the Center to the East of Thailand, the construction of Bang Pa-In – Nakhon Ratchasima Motorway is therefore considered one of the country’s major infrastructure projects.

The main purpose of this project is to stimulate the country’s economy. When completed, it will connect Thailand’s major urban centers within the Greater Mekong Sub-region.
The Intercity Motorway includes two sections: the six-lane 103-kilometer section from Bang Pa-In to Pak Chong, and the 93-kilometer four-lane from Pak Chong to Nakhon Ratchasima. Having been started in 2016, the project is planned to last until 2020.

The project’s required completion period of 4 years being challenging, the construction of the motorway has been divided into approximately 40 contracts to accelerate the project’s schedule.
To minimize potential impacts to local residents, a number of underpasses, overpasses and elevated structures (e.g. large viaducts) are provided throughout the Bang Pa-In – Nakhon Ratchasima Motorway.

Optimize the infrastructure project with Dextra’s rebar couplers

For the construction of the motorway’s elevated structure, the contractors of different packages opted for Dextra’s full performance Bartec rebar couplers to save time and money on the mechanical connection of the diameter 20mm to 32mm reinforcement bars.
Thanks to Bartec’s unique splicing system, all applications (Standard/ Position) can be fulfilled by one and only model of rebar coupler, reducing inventory management of the project to a minimum.
Further to this, Dextra’s Sonitec sonic tubes were also installed for cross-hole sonic logging tests in the foundations of the Bang Pa-In – Nakhon Ratchasima Intercity Motorway structures.

Dextra’s post-tensioning bars for the Motorway’s elevated structures

In addition to Dextra’s splicing and cross hole logging solutions, both smooth and fully-threaded Post-Tensioning bars were also used for both temporary (lifting and launching girder assembly) and permanent applications in segments. Approximately 28,000 sets of both PT bars have been delivered as per June 2018.
For more information about Dextra’s solutions in Thailand, please contact our Bangkok office.

Мост Бинькхань: новейший вантовый мост во Вьетнаме.

Мост Бинькхань: новейший вантовый мост во Вьетнаме.

The construction of Binh Khanh Bridge is a part of Vietnam’s Ben Luc – Long Thanh Expressway project, which will run through Ho Chi Minh City and southern Long An province and involves the construction of 58-kilometer long roads.
Being started in 2016 and scheduled to be in service within 2020, the main purpose of this project is to develop the country’s transport facilities for fast vehicles.
To ease the construction of this 58-km long expressway, the project owner Vietnam Expressway Corporation has divided the project into three phases: the western, the middle, and the eastern sections.

Smooth and Fully-threaded PT bars: post-tensioning solutions for bridges and viaducts

For the construction of the 3-kilometer long Binh Khanh Bridge, which is part of the middle section, Dextra has supplied smooth and fully-threaded post-tensioning bars have been delivered. These have been used in the main structure, the stay cable, as well as the bridge’s western and eastern approaches.

For more information about our solutions in Vietnam, please contact our Офис в Бангкоке.