Декстра Групп | Надежные соединения

DEXTRA
Поиск
Закройте это окно поиска.
Моя Декстра
Поиск
Закройте это окно поиска.

National Bank of Kuwait – New Headquarter

National Bank of Kuwait – New Headquarter

The new headquarters building of the National Bank of Kuwait is a 300m-tall tower that covers a total floor area of 127,000m2 with a design concept inspired by pearl shells and located in the heart of Kuwait City’s financial district.

The main construction comprises composite concrete and steel, while the cladding on the fins and glass façades is predominantly glass-reinforced concrete.

Dextra took part in reinforcing the concrete structure of the building by providing these solutions:

  • 100,000 Bartec couplers were installed for columns reinforcement, construction joints in raft and slab/beam to core wall connections.
  • 35,000 headed bars act as shear studs in raft.
  • 1,500 Unitec bolted couplers were used to extend existing reinforcing bars that were either not threaded or too short for lapping. It is a convenient solution to connect rebars by using a simple pneumatic wrench at the construction site, without the need of any rebar preparation.
  • Кондоминиум Слива | พลัมคอนโด

    Кондоминиум Слива | พลัมคอนโด

    Станция Plum Central — это 38-этажный проект кондоминиума, состоящий из 2 башен и расположенный недалеко от надземной станции метро Bang Yai, на северо-западе Бангкока. В жилом доме разместятся 1013 квартир.

    Фаза 1 проекта (первая башня) началась в сентябре 2015 года и будет завершена примерно в марте 2018 года. Быстрый темп строительства стал возможным благодаря использованию технологии «полностью сборного железобетона».

    Владелец проекта Pruksa управляет собственным заводом по производству сборных железобетонных изделий для этого проекта.

    Целью этого проекта компании Pruksa было быстрое возведение сборных железобетонных панелей (действующих как несущие стены) на всех уровнях над землей. Компания Dextra предложила для этой цели использовать муфты Groutec.

    Соединители Groutec монтируются на арматурный стержень Ø25 мм, предварительно подготовленный с резьбой Bartec. Соединители, установленные внизу каждого сборного железобетонного элемента, затем отливаются как часть сборного элемента стеновой панели.

    После подъема элемента на верхний этаж на объекте повторное соединение с выступающей арматурой достигается путем заливки безусадочного раствора. Следует отметить, что Dextra не поставляет раствор, который вместо этого можно приобрести на месте, что дает значительную экономию. После заливки раствора распорки вокруг каждой панели можно снять через 3 дня.

    Для получения дополнительной информации о The Plum Central Station и приложении Groutec обратитесь к нашему тематическому исследованию.

     

    Акт первый | Акт второй Башня

    Акт первый | Акт второй Башня

    Act One | Act Two Tower is a premium residential project in the Opera District of Downtown Dubai.

    The project consists of two towers called Act One (52 stories) and Act Two (46 stories).

    With their prime location, these residential towers offer views of the Dubai Fountain and the Burj Khalifa and they are few minutes away from Dubai Metro and from major attractions like the Dubai Mall and the Souk al Bahar.

    For this exceptional residential project, Dextra was entrusted with the reinforcement of the buildings’ structures, including raft foundations, columns, slabs and construction joints.

    150,000 Bartec rebar couplers along with rebar preparation machines were delivered to the construction site.

    Bartec rebar couplers help speed up the construction with a faster and more convenient way of connecting rebars than the traditional rebar lapping method.

    The thread on the rebar can be extended from a half-coupler to a full coupler length, allowing to perform the connection without any bar rotation.

    The project is scheduled to be completed in November 2020.

    Розничная торговля в больших коробках

    Розничная торговля в больших коробках

    This new 4-story retail center has been designed to have the smallest carbon footprint possible, with an innovative optimization of the air-condition load.

    It is located in Jebel Ali, Dubai, UAE with an 81,000 sqm floor area and a leasable area for over 100 retail and concept stores.

    Dextra Groutec couplers contained in the precast panels made the assembly on site easy and fast. More than 1,100 units of Groutec L 25 and 32mm were delivered.

    Groutec is a high-performance precast connection solution which is convenient to set up and fast to install on site by grout injection. It supports the connection of precast concrete columns, panels and beams.

    The first phase of the retail center is set for completion in 2019. The second phase will include a residential area to create a new lifestyle hub in Dubai.

    Троицкая башня в Ла-Дефанс

    Троицкая башня в Ла-Дефанс

    Башня Тринити в деловом районе Ла-Дефанс, к западу от Парижа, представляет собой новую 33-этажную офисную башню высотой 140 метров, в которой будет размещено более 52 000 квадратных метров офисных площадей.

    Проект направлен на достижение как социального, так и экологического воздействия на местном уровне за счет добавления больших открытых общественных пространств, вновь соединяющих территории, ранее разъединенные дорогой. Он также будет иметь зеленые зоны, пространство на крыше, открытые фасады и получит сертификат LEEDS.

    Для этого проекта Dextra поставила через своего французского дистрибьютора SNAAM Vernon более 18 000 ФОРТЕК® арматурные соединения.

    Соединители арматуры позволяют ускорить темпы строительства, обеспечивая быстрый и безопасный способ соединения арматурных стержней: по одному стержню, связками или клетками. В случае связки и клетки их можно собрать за пределами площадки и просто повторно соединить с помощью муфт по прибытии в конечное место.

    Троицкую башню планируют завершить в 2019 году.

    Для получения дополнительной информации о наличии решений для сращивания арматуры во Франции, пожалуйста, свяжитесь с нашим Парижский офис Чтобы получить больше информации.

    Floresta Gardens Towers – The Pearl

    Floresta Gardens Towers – The Pearl

    The Floresta Gardens project involves construction of the towers inside The Pearl Qatar.

    The project consists with the construction of mid-rise residential towers and villas within three gated villa communities, including a 2,452-square meter retail center. The precinct has a gross floor space of 267,471 square meters, 145,967 square meters of developable land, and 5,000 residential units.

    In the precast construction of the towers, Dextra Groutec played a significant role. Over 30,000 Groutec L couplers in sizes 20 mm to 40 mm were inserted inside columns for vertical connections on the construction site.

    Groutec precast coupler is an innovative solution for fast and easy connection of precast concrete elements. It is widely used in residential and commercial construction projects around the world.

    Башня Джидды

    Башня Джидды

    Башня Джидды (ранее известная как Башня Королевства) — выдающийся небоскреб, расположенный вдоль Красного моря на севере Джидды, Саудовская Аравия.

    Коммерческое здание спроектировано таким образом, чтобы впервые преодолеть отметку в 1 км при общей ожидаемой высоте 1008 метров, что делает его самым высоким зданием в мире.

    В конечном итоге в Jeddah Tower разместятся отель Four Seasons на 200 номеров, апартаменты с обслуживанием, несколько этажей офисов и обсерватория. Всего 59 лифтов позволят посетителям перемещаться между этажами.

    Конструкция башни была спроектирована консалтинговой фирмой Thornton Tomasetti и построена подрядчиком Saudi Bin Laden, которому Dextra осуществляет поставки при поддержке своего местного партнера Bahra Steel.

    Dextra с гордостью поставляет 100% арматурных соединителей для конструкций, как фундаментов, так и надстроек.

    В конструкции используются два основных типа арматурных стяжек:

    • Для всех фундаментов, колонн и вертикального соединения используются стандартные муфты Bartec. Они позволяют быстро соединить сборные клетки.
    • Для соединений плит также используются специальные перемычки, позволяющие соединить каждую ветвь П-образной арматуры с колонной.

    Башня все еще находится в стадии строительства, ее завершение ожидается примерно в 2019 году.

    Самая высокая сборная башня в Индии

    Самая высокая сборная башня в Индии

    Galaxy Towers, developed by Aurobindo, is a project to construct 24-storey precast office building in Hyderabad, India.

    It will be the tallest office tower in India built with precast technology.

    The building comprises of 4 basement floors and 24 upper stories with 1.9 million sq. ft. leasable area, which will include health clubs, food courts, cafés, a business center, ample car parking and a waiting lounge.

    The project is expected to be built in half the time of a comparable conventional cast-in-situ construction, illustrating how the precast technology has gained ground thanks to its efficiency.

    For this special project, Dextra supplied a critical part of the precast structure: Groutec coupler, a half-grouted sleeve designed for the connection of precast elements and manufactured in compliance with Eurocode 2, BS 8110, ACI 318, IBC, AASHTO & IS 16172.

    By installing Groutec couplers into the precast columns and walls at the precast factory, the fast and safe connection of walls or columns is achieved by injecting cementitious non-shrink grout through the inlet into the sleeves at site. 102,000 Groutec couplers have been delivered for this project.

    The Galaxy Towers is anticipated to be completed in 2020.

    (photo credit: Aurobindo Realty & Infrastructure Private Limited at https://bit.ly/37DW7IT)

    Энергетический парк короля Салмана (ИСПАРК)

    Энергетический парк короля Салмана (ИСПАРК)

    Энергетический парк имени короля Салмана (SPARK) — это новый промышленный город, строящийся и расположенный между Даммамом и Аль-Ахсой в восточной провинции Саудовской Аравии.

    Проект направлен на удовлетворение постоянно растущего спроса на энергетические продукты и услуги страны, включая разведку, добычу, нефтепереработку, нефтехимию, традиционную энергетику, добычу и очистку воды, а также бурение.

    К завершению первого этапа в 2021 году СПАРК будет разделен на 5 основных зон: промышленная зона, зона сухого порта и логистики, деловой район, учебные центры и жилые комплексы, а также зона коммерческой деятельности.

    Компания Dextra поставила около 700 000 арматурных стержней из стеклопластика ASTEC (полимер, армированный стекловолокном), модели GR45P, прямой и изогнутой формы, для зданий и тротуаров.

    Арматура ASTEC GFRP GR45P обеспечивает модуль упругости 45 ГПа и прочность на разрыв согласно ASTM 7205–06. Ее можно использовать в качестве упрочняющего материала как для новых, так и для существующих конструкций.

    После ожидаемого завершения третьего этапа в 2035 году он будет занимать 50 квадратных километров и, как ожидается, создаст 100 000 рабочих мест.

    Один Заабил

    Один Заабил

    One Za'abeel от Ithra Dubai — это культовый проект, который установит новые стандарты и раздвинет границы дизайна и инженерии в Дубае с помощью «The Link», крупнейшей в мире консоли, разделяющей два здания и обеспечивающей 360-градусный вид на город.

    Высотный многофункциональный комплекс включает в себя роскошные резиденции, ультра-роскошный отель, апартаменты с обслуживанием, офисные помещения премиум-класса, торговый подиум и панорамный вестибюль.

    Компания Dextra поставила более 400 000 единиц стандартных арматурных соединителей Bartec для соединения опор, колонн, плит с несущими стенами, а также для временных проемов и стартовых стержней.

    Для соединения бетонных конструкций консоли также устанавливаются сварные муфты Bartec.

    Ithra Dubai ожидает завершения полной облицовки всех башен A, Tower B и The Link к концу 2021 года, тем самым завершая наружные работы на One Za'abeel. Затем возобновятся внутренние работы и обустройство с большим вниманием.

    Источник изображений: https://gulfbusiness.com/work-progresses-on-one-zaabeel-project-in-dubai-with-tower-b-topped-out/, https://www.cbnme.com/news /ithra-dubais-one-zaabeel-the-link-lifted-to-its-final-position-100-meters-above-ground-level/, https://alemco.ae/projects-archive/one-zaabeel/ , https://alec.ae/portfolio-item/one-zaabeel/, https://gulfnews.com/photos/business/another-milestone-with-the-link-now-lifted-at-iconic-one- zaabeel-100-meters-above-level-1.1599134222596 ?slide=1

    Пожалуйста, введите вашу информацию

    Связаться с нами

       Поделитесь с нами своей информацией, и мы свяжемся с вами как можно скорее.