Строительство 2-го моста Канчпур, Мегна и Гумти
The Kanchpur, Meghna, and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project (KMG project) includes the construction of three new bridges on National Highway No. 1 (NH-1) across the Kanchpur, Meghna, and Gumti rivers, as well as the rehabilitation and renovation of existing bridges.
The new bridges have four lanes and are built beside older bridges with approach roads.
The objective of the project is to improve traffic conditions and transportation efficiency on the National Highway No.1 between Dhaka and Chittagong, contributing to Bangladesh’s long-term economic growth.
Dextra supplied thousands of Unitec couplers, ranging from diameter 12mm to 28mm to connect top slabs and piers.
Unitec is a bolted splicing system designed for the connection of two rebars which haven’t been previously prepared (no thread). It can be assembled on site with standard impact/pneumatic wrench.