The condominium, which is located near the Chaopraya river on Rama 3 road in Bangkok, Thailand, contains 484 units.
Grouted mechanical sleeves were used to join the precast elements, and Groutec couplers, which were inserted inside the shear wall and bearing wall, played an essential role to ensure the reinforcement continuity with dry joints.
The half-grouted mechanism of Groutec L and S sleeves, which feature a threaded end on one side, ensured accuracy and reduced mistakes throughout the grouting process,” stated Mr. Janeboon Leepipatnavit, Project Director of Taveeporn Technology Co., Ltd., the project’s contractor.
The Key Rama 3 – precast wall installation
The Key Rama 3 – precast walls
The construction required fewer workers and supplies such as rebars and concrete, resulting in a shorter construction period and less noise and waste.
Groutec F IAPMO certified!
Groutec F precast couplers have been successfully certified with IAPMO (International Association of Plumbing and Mechanical Officials) Standards, following the previous certification of Groutec L.
Groutec F is a new fully-grouted precast connection solution that is developed to complement the existing half-grouted systems: Groutec L and Groutec S. Unlike the previous two models, it is designed for the connection of precast elements without the need for any rebar preparation.
More about our latest projects
HCMC Metro Line 1: Ba Son Shipyard Station, Vietnam
Bartec headed bars were used in shear link reinforcement as an alternative to bends to minimize steel congestion in heavily reinforced areas.
Mahatma Gandhi Setu Rehabilitation, India
Dextra high-tensile fully threaded bars were provided, along with RepairGrip couplers for the connection of old and new pier caps.
Nanyang Technological University Lab, Singapore
GFRP (Glass Fiber Reinforced Polymer) rebars were installed in base slabs and floating slabs as a replacement for steel rebars.
Dextra is proud to be the first manufacturer of products
for civil works construction whose quality management system is
ISO 19443 certified!
This new standard covers « Specific requirements for the application of the ISO 9001 standard by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety. »
Having supplied concrete reinforcing bar couplers for the construction in over 50 nuclear reactors during the past 20 years, quality and nuclear safety remain Dextra’s priority.
Dextra’s solutions for port building and expansion projects, such as marine tie bars, rebar couplers and fiber reinforced polymer (FRP) rebars, were on display at the 19th ASEAN Ports and Shipping Exhibition and Conference in Kuala Lumpur in March 2022.