Rajasthan Atomic Power Project (RAPP) 7&8

Rajasthan Atomic Power Project (RAPP) 7&8

The Rajasthan Atomic Power Project (RAPP) is a nuclear power plant in Rawatbhata, Rajasthan, India, with 6 pressurized heavy water reactor (PHWR) units and a total installed capacity of 1,180 MW.

The plant’s owner and operator, the Nuclear Power Corporation of India (NPCIL), is expanding the plant’s capacity by building 2 additional reactors, Units 7 and 8.

In July 2011, the first pour of concrete (FPC) for the 7th reactor, with a capacity of 700MW, was completed. The unit’s start-up transformer (SUT) was also commissioned.

The 8th reactor, which will similarly have a capacity of 700MW, is scheduled to be finished in December 2021.

Dextra has supplied almost 500,000 Bartec couplers for the reinforcement of reactor buildings, auxiliary buildings, and spent fuel storages.

The 2 PHWR reactors will boost the plant’s existing capacity by 1,400MW, 700MW of which will be allotted to the state of Rajasthan.

Related Solutions

Expertise

At every moment of your customer journey, Dextra teams dedicate themselves to the production of smart construction solutions that allow our customers to reach higher productivity and safety levels on their construction sites.

Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra makes sure our products are always at reach no matter where our partners are.

For solutions that require to be customized, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China), and Pune (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

An independently accredited material testing laboratory, accredited to ISO-IEC17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Please enter your information

Contact us

   Share your information with us and we’ll get back to you as soon as possible.