Grupo Dextra | Conexões confiáveis

Procurar
Feche esta caixa de pesquisa.
Procurar
Feche esta caixa de pesquisa.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Chennai Metro Phase 2, India

 

Chennai Metro Phase 2, India

 
 

The Chennai Metro Phase 2 project is set to redefine urban transportation in one of India’s largest cities, promising enhanced connectivity and efficiency. Playing a pivotal role in the success of this ambitious project, Dextra has supplied an array of cutting-edge construction solutions to meet the project’s demanding structural and safety requirements.

Ensuring Robust Connections with Bartec Rebar Couplers

Dextra supplied nearly 2 million Bartec rebar couplers, essential for creating secure connections across various structural components. These couplers have been utilized extensively in the connections for diaphragm wall (d-wall) caging and slabs, pile cages, piers, and pier caps. By ensuring high-strength rebar connections, Bartec couplers contribute to the overall durability and resilience of the metro structure, particularly important in a densely populated and busy urban environment like Chennai.

Precision Testing with Sonitec CSL Testing Tubes

To ensure the highest standards of concrete integrity, Dextra provided over 80,000 Sonitec crosshole sonic logging (CSL) testing tubes. These tubes facilitate rigorous testing of piles and d-walls, helping to identify potential flaws within the concrete structure. This meticulous testing process enables project engineers to detect and address any irregularities, safeguarding the integrity and longevity of the metro’s foundations.

Supporting Complex Structures with CR Bar 1080 Post-Tensioning Bars

For the support of double-decker piers and the pre-tensioning of U-girders, Dextra supplied 68 CR Bar 1080 post-tensioning bars. These high-strength, fully threaded bars are critical in handling the complex loads and stresses that the elevated sections of the metro will endure. The inclusion of these bars ensures that the metro can withstand heavy traffic and operational demands over time, contributing to the long-term safety and functionality of the infrastructure.

Facilitating Tunnel Boring with GFRP Soft-Eyes

In the tunneling phase, Dextra also provided 42 GFRP soft-eyes, specifically designed for tunnel boring machine (TBM) operations. These soft-eyes allow TBMs to pass through concrete walls smoothly, ensuring safe and efficient tunneling while reducing the risk of structural damage. GFRP’s non-corrosive properties make it an ideal choice for underground construction, where durability and performance are paramount.

Building a Safer, Stronger Future

Dextra’s commitment to supplying top-tier construction materials and solutions underscores its dedication to the Chennai Metro Phase 2 project. As the metro takes shape, Dextra’s innovations contribute not only to the project’s success but also to the future of Chennai’s urban infrastructure, setting new standards in construction excellence and sustainability.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

O Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of Barra CR 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Sonitec EPD Report Published

Sonitec, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ Acopladores de vergalhão

✅ GFRP Rebars

✅ Barras de gravata marítima

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

Não é possível exibir o arquivo PDF. Download em vez de.

Areias da Marina Bay

Areias da Marina Bay

Marina Bay Sands é um resort espetacular com mais de 2.500 quartos, um cassino, muitos restaurantes e um jardim panorâmico exclusivo. O projeto foi concluído e aberto ao público em 2010.

Para este projeto, a Dextra forneceu entre 2007 e 2008 soluções para emendas de reforço, além de tubos Sonitec.

Os acopladores de vergalhões Bartec foram utilizados nas fundações das Paredes Diafragma, respondendo a um duplo desafio.

Os primeiros acopladores de vergalhão podem ser usados verticalmente para conectar as gaiolas D-Wall, permitindo obter maior comprimento da gaiola.

Então os acopladores também podem ser usados horizontalmente como conexões pendentes para lajes. Nesse caso, o acoplador geralmente é instalado em barras de gancho e moldado em concreto. Numa fase posterior, o acoplador pode ser reconectado com a armadura da segunda fase para iniciar o reforço da laje.

Acopladores também foram usados para túneis subterrâneos e edifícios de ventilação.

Para as fundações, a Dextra também forneceu mais de 100.000 metros lineares de tubos Sonitec, que são fáceis de montar em gaiolas de reforço e reconectar, aumentando a produtividade e eliminando a necessidade de operações de soldagem tediosas e pouco confiáveis. Depois de instalados, os tubos ficam firmemente no lugar, suportando sem problemas o levantamento e o manuseio da gaiola.

Aeroporto de Dubai

Aeroporto de Dubai

O Aeroporto de Dubai é o principal aeroporto dos Emirados Árabes Unidos. O famoso aeroporto, localizado a poucos quilômetros ao norte da cidade de Dubai, abriga a famosa companhia aérea Emirates. O Aeroporto Internacional de Dubai é o aeroporto #1 do mundo em termos de tráfego internacional de passageiros.

A Dextra Middle-East, também localizada em Dubai, esteve envolvida em vários pacotes de construção do Aeroporto de Dubai, especialmente entre 2003 e 2005, para a construção do Terminal 3 e saguões associados.

Para o Projeto Interno de Dubai, a Dextra forneceu seu popular
Bartec solução de acoplador, solução de acoplador de vergalhão #1 nos Emirados Árabes Unidos. 1,5 milhão de acopladores foram usados no Aeroporto Internacional de Dubai.

Superestrutura

Os acopladores Bartec forneceram uma solução técnica para permitir a reconexão da armadura da segunda fase entre pilares e vigas, e entre paredes e vigas.

Também foram utilizados acopladores de vergalhão para criar aberturas temporárias na armadura, permitindo a passagem de pessoas e equipamentos.

Fundações

Foram utilizados acopladores Bartec para as estacas de fundação. Para essa aplicação, os acopladores passaram a fazer parte de um processo de fabricação de gaiolas muito integrado e automatizado, permitindo conectar vergalhões de grande diâmetro em um tempo mínimo e maximizando o rendimento da produção de gaiolas.

Como complemento à solução de acoplador de vergalhão Bartec, foram utilizados tubos Dextra Sonitec para garantir rápida instalação e reconexão dos tubos sônicos ao longo de todo o comprimento da gaiola. Os tubos Sonitec são especialmente fáceis de instalar, graças à sua boca de borracha Push-Fit, e fáceis de montar na gaiola graças às suas cabeças soldadas. Mais de 1.800.000 metros de tubos Sonitec foram instalados no Aeroporto Internacional de Dubai ao longo dos anos!

Banguecoque BTS

Banguecoque BTS

O Sistema de Transporte de Massa de Bangkok (BTS) é um grande sistema urbano de skytrain localizado em Bangkok, capital da Tailândia. O sistema foi inaugurado em 1999.

A partir de 2017, o sistema consiste em 24 estações elevadas e 37 km de trilhos elevados organizados em duas linhas principais que se cruzam na estação central do Sião.

O sistema BTS está passando por uma extensão de suas duas linhas principais, com segmentos de linha e estações previstas para entrar em operação em 2019 e 2020.

Fundações

Para vários pacotes ao longo dos anos, a Dextra forneceu tubos Sonitec, que são usados para testar as fundações de estacas de concreto abaixo das estações e dos trilhos.

No total, a Dextra forneceu aproximadamente 40 mil metros lineares de tubos Sonitec, distância na verdade equivalente ao comprimento do próprio sistema BTS.

Pilões

Para conexões de barras verticais em postes, a Dextra ofereceu seus
Bartec conexão.
Bartec permite emendar convenientemente gaiolas de vergalhões pré-fabricadas usando um simples acoplador de vergalhões, permitindo economia de aço em comparação com a sobreposição e acelerando as operações no local.

Na Tailândia, a operação de rosqueamento é suportada pela fábrica da Dextra, convenientemente localizada no Nordeste de Bankgok. Os empreiteiros recebem o vergalhão já preparado e montado com seu acoplador de vergalhão.

AVE Palencia-Santander HSR Pacote 1 (Palencia – Palencia Norte) & Pacote 2 (Palencia Norte – Amusco)

O projeto ferroviário de alta velocidade AVE Palencia-Santander é um importante empreendimento de infraestrutura que visa conectar Palencia e Santander na Espanha. Este projecto envolve a construção de extensas redes ferroviárias, viadutos e pontes, sublinhando a necessidade de uma base forte e resiliente. Reconhecendo a importância crítica de garantir a integridade estrutural das estacas de concreto, a gestão do projeto buscou metodologias de teste avançadas.

A Dextra desempenhou um papel fundamental para garantir a robustez da base do projeto, fornecendo tubos de teste Sonitec Crosshole Sonic Logging (CSL). Estes tubos foram fundamentais para a realização de testes integrais de integridade estrutural nas estacas de concreto do AVE Palencia-Santander USR Pacote 1 (Palencia – Palencia Norte) e Pacote 2 (Palencia Norte – Amusco).

Crosshole Sonic Logging é um método de teste não destrutivo amplamente empregado para avaliar a qualidade e integridade de estacas de concreto. Envolve a utilização de ondas sônicas transmitidas através do concreto entre dois tubos de acesso, permitindo aos engenheiros avaliar as propriedades do material e identificar potenciais defeitos.

Os tubos Sonitec são especialmente projetados para Crosshole Sonic Logging, garantindo coleta de dados precisa e confiável durante testes de integridade estrutural. Esses tubos são embutidos nas estacas de concreto durante a construção, proporcionando pontos de acesso para a transmissão das ondas sônicas.

Por favor insira suas informações

Contate-nos

   Compartilhe suas informações conosco e entraremos em contato com você o mais breve possível.