Grupo Dextra | Conexões confiáveis

Procurar
Feche esta caixa de pesquisa.
Procurar
Feche esta caixa de pesquisa.

Port of Neom, Oxagon, Saudi Arabia

 

Port of Neom, Oxagon Port Stage 1 & 2, Saudi Arabia

 
 

As part of Saudi Arabia’s ambitious NEOM development, the Port of NEOM project, also known as the “Oxagon Port Stage 1 & Stage 2”, is envisioned to become the world’s largest floating industrial complex. Located on the Red Sea, the Port of NEOM is set to revolutionize the region with its innovative design and focus on sustainable development.

Dextra has been selected by Six Construct Saudi and MBL (Oxagon Stage 1) and Saudi Archirodon (Oxagon Stage 2), to provide high-performance solutions for this vital infrastructure, supplying 7,750 tons of Barras de gravata marítima in various sizes in Grade 500. These tie bars, paired with specialized accessories, are engineered to offer maximum durability and performance, critical to securing the 4-km long quay wall’s stability and longevity in demanding marine conditions.

The Importance of Marine Tie Bars

The quay wall forms the backbone of the new port infrastructure, facilitating vessel docking, cargo handling, and long-term maritime operations. Marine tie bars play an essential role in the integrity of this massive structure.

Dextra’s Barras de gravata marítima, manufactured to the highest standards and key to ensuring the required lifetime of the marine structure.

A Partnership for the Future

Dextra’s involvement in the Port of NEOM project underlines the company’s commitment to providing cutting-edge engineering solutions for large-scale infrastructure developments worldwide. As Saudi Arabia continues to build toward its Vision 2030, Dextra’s expertise and high-performance products are playing a pivotal role in shaping the future of this transformative region.

My Enso Loft, Philippines

 

My Enso Lofts, Philippines

 

Dextra has played a key role in the construction of the My Enso Lofts condominium project in Quezon, Philippines, by supplying cutting-edge reinforcement solutions. For this high-rise development, Dextra provided Bartec rebar splicing systems for the raft foundation, columns, and core walls, ensuring robust structural integrity and efficient load transfer across these critical elements.

Additionally, Dextra supplied Groutec S couplers for the precast shear wall and column connections. These couplers are designed for rapid assembly, which accelerated the construction timeline and enhanced the project’s overall structural stability.

By delivering these innovative solutions, Dextra continues to support the construction of resilient and durable buildings in the Philippines, reinforcing their commitment to excellence in infrastructure projects worldwide.

 

Por favor insira suas informações

Contate-nos

   Compartilhe suas informações conosco e entraremos em contato com você o mais breve possível.