Grupo Dextra | Conexões confiáveis

Procurar
Feche esta caixa de pesquisa.
Procurar
Feche esta caixa de pesquisa.

Sharing Some Mumbai Office Inauguration Glimpses!

We’re thrilled to announce the relocation of our Mumbai office to a new space at:

📍 501, Satellite Silver Co-op Prem Soc Ltd, M V Road, Village Marol, Marol Naka, Andheri-East, Mumbai – 400059
📞 Tel: +91 022 4503 5611

Our team is excited to keep delivering exceptional service and driving innovation from this new hub. We are deeply grateful for the opportunities and support that have brought us to this milestone.

Our commitment to excellence remains unwavering, and we look forward to serving you better from our new address!

Dextra’s Quarterly Newsletter: Connection #38

The Mumbai Metro Line 2B is a vital infrastructure project designed to enhance public transport in Mumbai. Dextra has contributed to the project by supplying advanced construction solutions to ensure the structure’s durability and strength.

For the elevated section’s U-girders, Dextra provided Barra CR 1080 for both stressing and pre-tensioning. Additionally, fully threaded bars were supplied for temporary stressing, offering flexible and secure connections between precast segments.

Dextra also delivered Unitec couplers, enabling efficient rebar connections without pre-threading, ensuring strong, seamless structural continuity on-site. Moreover, Sonitec CSL testing tubes were provided for concrete pile integrity testing.

By contributing these advanced materials and solutions, Dextra is supporting the development of a reliable metro system that will meet Mumbai’s growing transportation needs for years to come.

More about our latest projects

UK_HS2-ChilternTunnel_Slider3
DE_A66-Salzbachtal-Bridge_Slider5
TH_Neo-Factory_Slider2

High Speed 2 (HS2), UK

Griptec couplers are reinforcing critical rebar connections across multiple key sites in the UK’s new high-speed railway project.

Cairo Monorail Bridge, Egypt

High-strength tension rods were used as hangers for the bowstring monorail bridge to maintain its structural integrity and durability.

Salzbachtal Bridge, Germany

Sonitec CSL tubes were chosen for cross-hole sonic logging to assess deep foundation integrity and ensure the stability of the bridge.

Neo Factory Phase 1, Tailândia

Bartec e Groutec play a key role in the precast column connections, guaranteeing reliable construction.

Introducing Durabar Carpet: the latest breakthrough from Dextra!

Made from Durabar GFRP rebar, this latest patented Durabar Carpet offers unparalleled versatility for construction projects. Designed for efficiency, its ability to be cut effortlessly in any direction ensures maximum material savings.

Key Features:

•   Bar from Ø 6mm to Ø 16mm
•   Standard length: 5.8m
•   Customizable lengths: 2m to 5.8m
•   Flexible spacing: 100mm to 600mm

Watch Now: FibreCraft Insights – Exploring GFRP in Construction

Dextra is excited to present FibreCraft Insights, our brand-new video series dedicated to Glass Fibre Reinforced Polymer (GFRP) rebar in the infrastructure construction industry.

Hosted by our experts in composite solutions, this series offers valuable insights into the growing role of GFRP in modern construction.

The first three episodes are available now, where we delve into an introduction to the material and its advantages, the unique technical features of GFRP, and real-world applications.

Follow our LinkedIn to stay tuned for more episodes!

Recent activities

Our Collaboration with Makin Juta

Watch our latest interview with Makin Juta, one of our esteemed distributors and partners in Malaysia, and discover our collaboration on the iconic KLCC Lot L and M Podium project, where Bartec was selected as the trusted solution. Watch the interview

 

Tension Rods & PT Bars EPD Verified

Dextra’s tension rods and post-tensioning bars are Environmental Product Declaration (EPD) verified and listed on the EPD Hub, joining our previously verified couplers, GFRP rebars, marine tie bars, ground anchors, rock bolts, and Sonitec. Consulte Mais informação

 
 

 

Headed Bars Now CE Marked with ETA

Bartec, Fortec, and Rolltec headed bars are now CE marked with European Technical Assessments (ETA). Tested by Concrefy and certified by Kiwa, these are our first CE-marked products, meeting the essential requirements. Consulte Mais informação

 

Commitment to Community in Thailand

Dextra Thailand donated to the Cerebral Palsy Sports Association of Thailand. Consulte Mais informação. Additionally, we donated unwanted office furniture to a school and hosted environmental stewardship activities for students. Consulte Mais informação

 

Upcoming events

World of Concrete India

16-18 Oct 2024

Port Dev. MEA Forum, United Arab Emirates

21-22 Oct 2024

ASEAN Ports & Logistics, Malaysia

10-11 Sep 2024

Bauma
China

26-29 Nov 2024

CTBUH Asia Conference, Thailand

3-4 Dec 2024

Bartec, Fortec, Rolltec Headed Bars Achieve CE Marking

Dextra’s Bartec, Fortec, and Rolltec Headed Bars Achieve CE Marking—A Milestone in Engineering Excellence

Dextra is proud to announce a significant milestone in our journey of delivering high-quality construction solutions: our Bartec, Fortec, and Rolltec large headed bars, ranging from 16 to 40mm in diameter, have been assessed and granted European Technical Assessments (ETA) and are now officially CE marked. This achievement is based on the stringent regulations under EAD 160012-01-0301, edition April 2021, certified by Kiwa, one of the largest certification bodies in the world.

CE marking signifies our products meet the essential requirements for headed reinforcing steel bar within the European Economic Area. It also reinforces our commitment to providing safe, reliable, and high-performance solutions in the construction industry.

To ensure that our products meet the highest standards, rigorous testing was conducted by Concrefy; the most recognized and experienced laboratory in the Netherlands, in accordance with ISO 15698. These tests verified the mechanical properties, durability, and overall performance of our headed bars, ensuring they comply with stringent European standards.

A First Step Toward a Larger Vision

This achievement marks the beginning of an exciting new chapter for Dextra. These are our first products to receive CE marking, and we are already working on expanding this certification to more of our product range. Our goal is to continue delivering innovative solutions that meet and exceed industry standards globally.

CE marking is not just a badge of compliance; it is a testament to our unwavering dedication to engineering excellence, quality, and customer satisfaction. As we continue to push the boundaries of what is possible in the construction sector, we are committed to setting new benchmarks in product performance and safety.

Stay tuned as we bring more CE-marked innovations to the market, driving the construction industry forward with cutting-edge solutions designed to last.

Sobre Dextra

Dextra is a leading provider of engineered construction products and solutions, specializing in high-performance rebar coupler systems and other advanced engineered construction technologies. With a global presence and a reputation for quality, Dextra continues to lead the industry in innovation and customer satisfaction.

Bartec-Fortec Headed bars - ETA-24-0219

Bartec-Fortec Headed bars - ETA-24-0219

Não é possível exibir o arquivo PDF. Download em vez de.

Rolltec Headed bars - ETA-24-0268

Rolltec Headed bars - ETA-24-0268

Não é possível exibir o arquivo PDF. Download em vez de.

Tension Rods & PT Bars EPD Verified

Dextra’s tension rods e post-tensioning bars are now EPD (Environmental Product Declaration) verified and officially listed on the EPD Hub website! This recognition highlights our commitment to environmental performance and sustainable solutions.

Our previously approved solutions include:

✅ Acopladores de vergalhão

✅ GFRP Rebars

✅ Barras de gravata marítima

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

✅ Sonitec

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Tension Rods

EPD Report for Tension Rods

Não é possível exibir o arquivo PDF. Download em vez de.

EPD Report for Post-Tensioning Bars

EPD Report for Post-Tensioning Bars

Não é possível exibir o arquivo PDF. Download em vez de.

Dextra’s Quarterly Newsletter: Connection #37

O San’ao Nuclear Power Plant units 1 and 2, featuring advanced HPR1000 Hualong reactors, are key components of China’s strategy to expand its nuclear power capacity to meet growing energy needs and reduce carbon emissions.

Dextra has played a crucial role by supplying Griptec couplers for the anti-aircraft impact shell construction. Griptec is a reliable splicing system trusted by over ten nuclear reactors globally, known for its stringent quality standards and exceptional performance.

Griptec was delivered along with high-productivity bar end preparation equipment, which processes each bar end in 30-45 seconds, significantly enhancing efficiency. This equipment requires only a single operator, optimizing workforce utilization.

Additionally, Dextra is the first manufacturer of civil works construction products with an ISO 19443 certified quality management system for nuclear safety, underscoring their commitment to the highest safety and quality standards.

More about our latest projects

HR_Peljesac-Bridge_Slider1
HK_Airport-Terminal-2_Slider3
ES_AVE-Palencia-Santander_Slider7
IN_My-Home-Grava_Slider1

Pelješac Bridge, Croatia

The bridge connects the mainland to the Pelješac Peninsula, replacing ferry services, using Fortec couplers to connect pile cages for stability.

Hong Kong Airport Terminal 2

The terminal expansion relied significantly on post-tensioning bars for the connection of jacking towers and the heavy lifting of roof structures.

AVE Palencia-Santander,
Espanha

Dextra supplied Sonitec for the project, facilitating structural integrity tests on concrete piles, ensuring the project’s robust foundation.

My Home GRAVA Hyderabad, India

The 43-story towers, one of the world’s largest precast developments, use Groutec and Bartec for precast concrete connections.

Precast Overhead Tanks: Revolutionizing Water Storage in India

Jal Jeevan Mission by the Government of India is a flagship initiative aimed at ensuring the availability of quality drinking water to every household in rural areas. This mission emphasizes the importance of water management, infrastructure development, and community participation.

With partnership between Larsen & Toubro (L&T) e Dextra, we are proud to contribute to this noble goal through innovative construction technologies, providing precast construction and the use of Groutec e Bartec couplers, which have proven effective in building overhead water tanks across various regions.

Dextra Leads the Way in Sustainable Solutions: EPD Verified!

We are the first in our industry to independently verify a wide ranges of solutions Environmental Product Declarations (EPDs)

Our rebar couplers, GFRP rebars, marine tie bars, steel ground anchors, steel self-drilling rock-bolts, steel combination bolts, and the most recently verified Sonitec have EPD reports and are officially listed on the EPD International AB and EPD Hub website to ensure minimal life-cycle environmental impact.

Learn more about our ongoing contributions to environmental sustainability by following this link.

Recent activities

Clean and care for elderly in Longjin, China

Dextra team in China, with 15 volunteering team members, successfully renovated two houses and cleaned four homes for the elderly in Longjin Community, Guangzhou, bringing new hope and care to these families.

$23,000 contribution to India’s rural development

Dextra team in India has contributed over $23,000 this year to support community, including healthcare, education, and economic empowerment, making a positive impact in rural areas and government hospitals.

Consulte Mais informação

The newest addition to PT Bars: CR Bar 1080!

Stay tuned for the launch of our newest addition to the fully threaded post-tensioning bar range: Barra CR 1080, a Grade 1080 quenched and tempered bar featuring a cold-rolled thread for pre/post-tensioning of concrete structures.

Upcoming events

CE&CR Annual Awards, India

2 Aug 2024

MBAM OneBuild, Malaysia

28-30 Aug 2024

Port Development Summit, Thailand

10-11 Sep 2024

DFI-India Annual Conference, India

19-21 Sep 2024

Sonitec EPD Report Published

Sonitec, a crosshole sonic logging (CSL) tube for concrete structure integrity testing solution from Dextra, now has an EPD (Environmental Product Declarations) report and officially listed on the EPD Hub website!

Our previously approved solutions include:

✅ Acopladores de vergalhão

✅ GFRP Rebars

✅ Barras de gravata marítima

✅ Steel Ground Anchors

✅ Steel Self-Drilling Rock-Bolts

✅ Steel Combination Bolts

Stay tuned as we work on EPDs for even more of our solutions!

EPD Report for Sonitec

EPD Report for Sonitec

Não é possível exibir o arquivo PDF. Download em vez de.

Dextra and Arkema Forge Partnership to Revolutionize Composite Solutions

Arkema, a titan in specialty materials with a robust focus on sustainable innovations, has joined forces with Dextra Group, a pioneer in the construction industry known for its cutting-edge Glass Fiber Reinforced Polymer (GFRP) solutions, to unleash groundbreaking composite fiber solutions. This collaboration is set to redefine industry standards, leveraging Arkema’s acclaimed Elium thermoplastic resin and Dextra’s innovative FRP rebar to deliver unique, high-performance materials focused on sustainability and efficiency in construction.

The partnership marks a visionary step towards the future of construction materials, positioning both Arkema and Dextra Group at the forefront of technological acceleration in the composites sector. Through this initiative, they aim to drive the adoption of composite material in construction, emphasizing innovative solutions, sustainability, and the superior qualities of Glass Fiber Reinforced Polymer, thus setting a new benchmark for quality and innovation in the industry.

Dextra’s innovative FRP rebar, combined with Arkema’s Elium® resin, presented at JEC World 2024, encapsulates the essence of this partnership, highlighting Dextra’s leadership in GFRP innovation for the construction industry.

Overview of Arkema and Dextra Group’s Collaboration

In a groundbreaking collaboration, Arkema, a global leader in specialty chemicals, has joined forces with Dextra Group, a trailblazer in the construction industry. This partnership is set to revolutionize the construction sector with the introduction of innovative composite solutions. Below are the key aspects of this collaboration:

  • Arkema’s Contribution:
    • Leveraging its expertise in specialty materials, Arkema brings to the table its pioneering Elium® thermoplastic resin, known for its exceptional performance in enhancing the strength and durability of composites.
  • Dextra Group’s Role:
    • Operating in over 55 countries, Dextra Group’s expertise in engineered steel and fibre-reinforced polymer construction products sets a solid foundation for this collaboration. The focus on sustainability is evident through Dextra’s introduction of Environmental Product Declarations (EPDs) for their products, showcasing a shared vision for a greener future.

This collaboration not only underscores the commitment of both organizations to pioneering sustainable, high-performance materials but also sets Dextra apart as a leader in GFRP innovation within the construction sector.

Arkema’s Elium Thermoplastic Resin and Dextra’s FRP Rebars

At the heart of the collaboration between Arkema and Dextra Group lies the integration of Arkema’s Elium® thermoplastic resin with Dextra’s innovative FRP rebars, setting a new standard in the construction industry for composite fiber solutions. This partnership leverages the unique properties of Elium® resin, including:

  • Hot Bending on Site: Elium® resin allows for the hot bending of FRP rebars directly on construction sites, offering unparalleled flexibility and cost-efficiency. This feature is a game-changer, simplifying logistics and enabling more complex architectural designs.
  • Sustainable and High Performance: This new generation of resin can be made with up to 92% recycled material. At the end of the products lifetime (120+ Years), it can be broken down to separate the resin and fiber elements. This allows the resin to be recycled and reused while the fiber can be upcycled to be used as reinforcement in asphalt and concrete.

Arkema’s collaboration with Dextra to develop bendable reinforcements using Elium® resin further underscores the innovative spirit of this partnership. This endeavor not only makes reinforcements more flexible but also enhances their resistance properties, longevity, and aesthetic appeal, mirroring natural stone.

Through this collaboration, Dextra Group is positioned as a leader in GFRP innovation, differentiating itself from other producers by harnessing the unique benefits of Arkema’s Elium® resin and its unique manufacturing process.

 

Fortec+ Hong Kong Buildings Department Approved!

Dextra, the leading provider of construction solutions, has received official approval for Fortec+ from the Buildings Department (BD) of the Government of Hong Kong. This approval marks a significant milestone not only for Dextra but also for the entire construction sector in the region.

The approval granted by the BD signifies the endorsement of Fortec+’s cutting-edge parallel thread mechanical splice system. This innovative solution has been proven to offer unprecedented efficiency, reliability, and safety in structural projects.

As the regulatory authority responsible for overseeing building construction and safety standards in Hong Kong, the BD’s endorsement serves as a testament to the reliability and compliance of Fortec+’s technology with local regulations and industry best practices.

“Bar Break” splicing system

Fortec+ is a complete tensile splice system, ensuring bar-break performance of up to 800MPa under tensile load.

 

Compliant with Hong Kong standards

Fortec+ meets the Buildings Department’s Code of Practice for Structural Use of Concrete 2013 and is listed on the Central Data Bank List of Building Materials.

 

Reliable solution

The Plus (+) entails additional testing of proof load, ensuring the most reliable connections through a single set of thread preparation equipment.

 

Technical support

Our team in Hong Kong are available to accompany you through each step of the design process using readily available CAD/BIM tools and during onsite installation.

Trusted by Various Iconic Projects Across Hong Kong!

Penny’s Bay and Kai Tak Community Isolation Facility

Central Kowloon Route – Central Tunnel

Trunk Road T2

Tseung Kwan O – Lam Tin Tunnel

Dextra Achieves New Milestone for Hinkley Point C Project

Dextra, in conjunction with our esteemed partners EDF, BYLOR and Express Reinforcements Ltd., is thrilled to announce a significant achievement: the successful provision of an astounding 2.5 million Griptec connections and 3 million headed bars for the monumental Hinkley Point C nuclear power plant project in the UK!

This milestone serves as a testament to Dextra’s dedication to quality, excellence, and the capability to execute large-scale, intricate projects.

The commitment and adaptability of the Dextra team have been pivotal in ensuring the seamless operation of the supply chain, facilitating timely progress at every juncture.

Dextra is privileged to contribute significantly to the advancement of sustainable energy and is honored to play a vital role in shaping the future.

Breaking Ground: GEOTEC Joins Sustainability Drive with EPDs!

We are proud to share the latest addition to our sustainability journey: EPDs (Environmental Product Declarations) for GEOTEC are here! Check out our geotechnical products now officially published on the EPD Hub website:

This another accomplishment builds on our commitment to eco-conscious construction, following EPDs for rebar couplers, GFRP rebar, and marine tie bars. Our dedication doesn’t stop there – stay tuned as we work on EPDs for more of our solutions!

EPD Report for GEOTEC Steel Ground Anchor

EPD Report for GEOTEC Steel Ground Anchor

Não é possível exibir o arquivo PDF. Download em vez de.

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

EPD Report for GEOTEC Steel Self-Drilling Rock-Bolt

Não é possível exibir o arquivo PDF. Download em vez de.

EPD Report for GEOTEC Steel Combination Bolt

EPD Report for GEOTEC Steel Combination Bolt

Não é possível exibir o arquivo PDF. Download em vez de.

Por favor insira suas informações

Contate-nos

   Compartilhe suas informações conosco e entraremos em contato com você o mais breve possível.