Grupo Dextra | Conexões confiáveis

Dextra’s Quarterly Newsletter: Connection #38

The Mumbai Metro Line 2B is a vital infrastructure project designed to enhance public transport in Mumbai. Dextra has contributed to the project by supplying advanced construction solutions to ensure the structure’s durability and strength. For the elevated section’s U-girders, Dextra provided Barra CR 1080 for both stressing and pre-tensioning. Additionally, fully threaded bars were supplied for temporary stressing, offering flexible and secure connections between precast segments. Dextra also delivered Unitec couplers, enabling efficient rebar connections without pre-threading, ensuring strong, seamless structural continuity on-site. Moreover, Sonitec CSL testing tubes were provided for concrete pile integrity testing. By contributing these advanced materials and solutions, Dextra is supporting the development of a reliable metro system that will meet Mumbai’s growing transportation needs for years to come.

More about our latest projects

UK_HS2-ChilternTunnel_Slider3
DE_A66-Salzbachtal-Bridge_Slider5
TH_Neo-Factory_Slider2

High Speed 2 (HS2), UK

Griptec couplers are reinforcing critical rebar connections across multiple key sites in the UK’s new high-speed railway project.

Cairo Monorail Bridge, Egypt

High-strength tension rods were used as hangers for the bowstring monorail bridge to maintain its structural integrity and durability.

Salzbachtal Bridge, Germany
Sonitec CSL tubes were chosen for cross-hole sonic logging to assess deep foundation integrity and ensure the stability of the bridge.
Neo Factory Phase 1, Tailândia
Bartec e Groutec play a key role in the precast column connections, guaranteeing reliable construction.

Introducing Durabar Carpet: the latest breakthrough from Dextra!

Made from Durabar PRFV rebar, this latest patented Durabar Carpet offers unparalleled versatility for construction projects. Designed for efficiency, its ability to be cut effortlessly in any direction ensures maximum material savings. Key Features: •   Bar from Ø 6mm to Ø 16mm •   Standard length: 5.8m •   Customizable lengths: 2m to 5.8m •   Flexible spacing: 100mm to 600mm

Watch Now: FibreCraft Insights – Exploring PRFV in Construction

Dextra is excited to present FibreCraft Insights, our brand-new video series dedicated to Polímero Reforçado com Fibra de Vidro (PRFV) rebar in the infrastructure construction industry. Hosted by our experts in composite solutions, this series offers valuable insights into the growing role of PRFV in modern construction. The first three episodes are available now, where we delve into an introduction to the material and its advantages, the unique technical features of PRFV, and real-world applications. Follow our LinkedIn to stay tuned for more episodes!

Recent activities

Our Collaboration with Makin Juta

Watch our latest interview with Makin Juta, one of our esteemed distributors and partners in Malaysia, and discover our collaboration on the iconic KLCC Lot L and M Podium project, where Bartec was selected as the trusted solution. Watch the interview

 
Tension Rods & PT Bars EPD Verified
Dextra’s tension rods and post-tensioning bars are Environmental Product Declaration (EPD) verified and listed on the EPD Hub, joining our previously verified couplers, PRFV rebars, marine tie bars, ground anchors, rock bolts, and Sonitec. Consulte Mais informação
Barras com cabeça Now CE Marked with ETA
Bartec, Fortec, and Rolltec headed bars are now CE marked with European Technical Assessments (ETA). Tested by Concrefy and certified by Kiwa, these are our first CE-marked products, meeting the essential requirements. Consulte Mais informação

 

Commitment to Community in Thailand

Dextra Thailand donated to the Cerebral Palsy Sports Association of Thailand. Consulte Mais informação. Additionally, we donated unwanted office furniture to a school and hosted environmental stewardship activities for students. Consulte Mais informação

 

Upcoming events

World of Concrete India

16-18 Oct 2024

Port Dev. MEA Forum, United Arab Emirates

21-22 Oct 2024

ASEAN Ports & Logistics, Malaysia

10-11 Sep 2024

Bauma
China

26-29 Nov 2024

CTBUH Asia Conference, Thailand

3-4 Dec 2024

Dextra Celebrates Paralympic Success with Thai Boccia Athletes

Dextra had the pleasure of visiting the Cerebral Palsy Sports Association of Thailand (CPSAT) once again, following our initial visit in June. During that visit, we donated funds to support these dedicated athletes in their training and competitions, and we even had the opportunity to play a friendly boccia match together. Since then, these remarkable athletes have achieved outstanding success at the recent Paralympic Games in France, winning a gold medal and two bronze medals in Individual Boccia.

This return visit allowed us to personally congratulate the athletes on their incredible accomplishments. Their perseverance and commitment have not only brought pride to Thailand but also inspired us all at Dextra. We are honored to have supported them on their journey and are excited to continue backing their future endeavors.

Through these ongoing efforts, Dextra reaffirms our dedication to giving back to the community and celebrating the triumphs of individuals who embody the spirit of resilience and determination.

Bartec, Fortec, Rolltec Headed Bars Achieve CE Marking

Dextra’s Bartec, Fortec, and Rolltec Headed Bars Achieve CE Marking—A Milestone in Engineering Excellence

Dextra is proud to announce a significant milestone in our journey of delivering high-quality construction solutions: our Bartec, Fortec, and Rolltec large headed bars, ranging from 16 to 40mm in diameter, have been assessed and granted European Technical Assessments (ETA) and are now officially CE marked. This achievement is based on the stringent regulations under EAD 160012-01-0301, edition April 2021, certified by Kiwa, one of the largest certification bodies in the world.

CE marking signifies our products meet the essential requirements for headed reinforcing steel bar within the European Economic Area. It also reinforces our commitment to providing safe, reliable, and high-performance solutions in the construction industry.

To ensure that our products meet the highest standards, rigorous testing was conducted by Concrefy; the most recognized and experienced laboratory in the Netherlands, in accordance with ISO 15698. These tests verified the mechanical properties, durability, and overall performance of our headed bars, ensuring they comply with stringent European standards.

A First Step Toward a Larger Vision

This achievement marks the beginning of an exciting new chapter for Dextra. These are our first products to receive CE marking, and we are already working on expanding this certification to more of our product range. Our goal is to continue delivering innovative solutions that meet and exceed industry standards globally.

CE marking is not just a badge of compliance; it is a testament to our unwavering dedication to engineering excellence, quality, and customer satisfaction. As we continue to push the boundaries of what is possible in the construction sector, we are committed to setting new benchmarks in product performance and safety.

Stay tuned as we bring more CE-marked innovations to the market, driving the construction industry forward with cutting-edge solutions designed to last.

Sobre Dextra

Dextra is a leading provider of engineered construction products and solutions, specializing in high-performance rebar coupler systems and other advanced engineered construction technologies. With a global presence and a reputation for quality, Dextra continues to lead the industry in innovation and customer satisfaction.

Bartec-Fortec Headed bars - ETA-24-0219

Bartec-Fortec Headed bars - ETA-24-0219

Não é possível exibir o arquivo PDF. Download em vez de.

Rolltec Headed bars - ETA-24-0268

Rolltec Headed bars - ETA-24-0268

Não é possível exibir o arquivo PDF. Download em vez de.

Mumbai Metro Line 2B, India

 

Mumbai Metro Line 2B, India

 
 

O Mumbai Metro Line 2B, an essential link connecting several key areas of the city, is a significant infrastructure project aimed at alleviating Mumbai’s traffic congestion and providing efficient public transport. As part of this ambitious project, Dextra has made a valuable contribution, supplying engineered construction materials to ensure the durability and reliability of the structure.

CR Bar 1080 for U-Girder Stressing and Pre-Tensioning

One of the critical components of the project is the elevated section of the metro, which relies on U-girders for support. To enhance the strength and resilience of these U-girders, Dextra supplied its innovative CR Bar 1080 cold-rolled fully threaded post-tensioning bars. These bars, with a diameter of 75mm, are specifically designed to withstand high stress during both U-girder stressing and pre-tensioning operations. The hexagonal nuts provided as part of the system allow for secure fastening and easy adjustment, ensuring precise tensioning to meet the structural demands.

 

Fully Threaded (FT) Bar for Segment Stitching and Temporary Stressing

For segment stitching and temporary stressing operations during the construction of the metro viaduct, Dextra supplied its fully threaded (FT) bars. These bars provide secure connections between precast segments and offer flexibility for adjustments during the stitching process, ensuring that the structural alignment is perfect before the segments are permanently joined.

Unitec Couplers for Rebar Connections

In addition, Dextra supplied Unitec couplers, designed for connecting rebars at construction sites without the need for pre-threading. These couplers offer a convenient and robust solution, allowing for seamless connection of two rebars, ensuring structural continuity and strength without delays in the construction process.

Sonitec CSL Testing Tubes for Concrete Pile Integrity

In addition to supplying post-tensioning bars, Dextra also provided Sonitec Crosshole Sonic Logging (CSL) testing tubes for the integrity testing of the concrete piles supporting the metro structures. These tubes enable highly accurate non-destructive testing of the concrete, allowing engineers to detect any potential flaws or weaknesses in the piles. This testing is vital for ensuring the piles meet the necessary strength and quality standards, thereby supporting the entire metro system safely and effectively.

Enhancing Metro Connectivity with Quality Solutions

As the Mumbai Metro Line 2B progresses towards completion, Dextra’s contributions to the project highlight its role in providing advanced engineering solutions for infrastructure development. The combination of Barra CR 1080 for post-tensioning, fully threaded bars for segment stitching, Unitec couplers for rebar connection, and Sonitec CSL testing tubes for pile integrity showcases Dextra’s commitment to quality, innovation, and safety in major construction projects.

By contributing to this key metro line, Dextra is playing a part in shaping the future of urban mobility in Mumbai, ensuring that the metro system will be reliable and capable of supporting the city’s growing transportation needs for years to come.

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 

Central Kowloon Route (CKR) – Central Tunnel, Hong Kong

 
 

Dextra played a pivotal role in the construction of the Central Kowloon Route (CKR) – Central Tunnel project in Hong Kong by supplying Fortec+ couplers, along with steel rock bolts, expandable friction bolts, umbrella pipes, and post-tensioning bars for tunneling works. These mechanical rebar couplers were integral in ensuring strong and reliable connections within the road tunnel structure, meeting the stringent requirements for safety and durability.

The CKR, a major infrastructure project aimed at improving traffic flow across Kowloon, required advanced construction techniques. Dextra’s Fortec+ couplers, used in locations such as precast panels, tunnel access points, and driveways, contributed significantly to the project’s structural integrity and long-term performance. The Fortec+ system includes a rebar preparation process in which the threaded bar end is proof tested with a tensile load, ensuring non-destructive testing within the elastic zone of the reinforcing bar.

 

Image credit: Central Kowloon Route – Highways Department

Neo Factory Phase 1, Thailand

 

Neo Factory Phase 1, Thailand

 
 

Dextra has played a key role in the construction of the Neo Factory Phase 1 in Pathum Thani, Thailand, one of the country’s leading consumer product manufacturers. By supplying essential Bartec e Groutec S. systems for precast column connections, Dextra ensured the structural integrity of this significant industrial facility.

Bartec, renowned for its mechanical splicing capabilities, and Groutec S., designed for secure and easy installation of precast elements, were crucial in making the construction process efficient and reliable. Dextra’s involvement in the Neo Factory project underscores its commitment to providing high-quality, innovative products that support the demands of modern construction, contributing to the continued growth of Thailand’s industrial sector.

 

Pattullo Bridge Replacement, Canada

 

Pattullo Bridge Replacement, Canada

 
 

Dextra has proudly contributed to the construction of the Pattullo Bridge Replacement project in Canada, a vital infrastructure initiative that will enhance connectivity between Surrey and New Westminster. As part of this ambitious endeavor, Dextra supplied 100,000 Bartec® couplers, ensuring robust and reliable rebar connections from the bridge’s foundations to its towering pylons.

The high-performance Bartec® couplers, known for their exceptional strength and ease of installation, were integral in providing the necessary durability required for this long-term infrastructure. Dextra’s involvement in the Pattullo Bridge project underscores the company’s commitment to delivering innovative solutions that support large-scale construction efforts worldwide.

As the new bridge takes shape, it stands as a testament to the critical role of reliable engineering components in building the infrastructure of tomorrow.

Dextra Celebrates HR Excellence Awards 2024

✨ Dextra Group Celebrates Big Wins at the HR Excellence Awards 2024! 🏆🌟

At the HR Excellence Awards 2024 Gala Dinner on August 23, Dextra Group once again distinguished itself, securing two remarkable wins: Best HR Team (SME) – Gold Award e Excellence in HR Change Management – Bronze Award. This event recognized organizations excelling in human resources through innovation and strategic execution.

Dextra’s Best HR Team (SME) gold award honored the team’s synergy and advancements in HR practices across talent acquisition, compensation, employee engagement, development, and organizational processes. The team’s efforts led to reduced turnover, higher employee satisfaction, and enhanced recruitment efficiency, solidifying their reputation for excellence.

O Excellence in HR Change Management award acknowledged Dextra’s transformation of HR operations amidst global challenges. A pivotal two-day workshop created a roadmap focused on adaptability and innovation, with structured project management ensuring alignment with business goals. This approach demonstrated Dextra’s agility in navigating HR transformations.

These awards not only reflect our achievements but also reaffirm our commitment to pushing the boundaries of what is possible in HR. As we celebrate this accomplishment, we are inspired to continue innovating, setting new benchmarks, and delivering lasting impact for our organization and the wider HR community.

Unveiling Durabar Carpet – The Future of Construction Versatility

Dextra is thrilled to announce the launch of the Durabar Carpet, the latest in our line of cutting-edge construction solutions. Crafted from our patented Durabar GFRP rebar, this innovative product is set to revolutionize the construction industry with its unmatched versatility and efficiency.

A New Era in Construction

The Durabar Carpet stands out not only for its robust design but also for its adaptability across various construction projects.

The real game-changer, however, lies in its ability to be effortlessly cut in any direction, allowing for precise adjustments and minimizing material waste. This feature is particularly beneficial in complex projects where customization is key.

Key Features:

  • Bar Diameter: Available in sizes ranging from Ø 6mm to Ø 16mm.
  • Standard Length: 5.8 meters, perfect for most applications.
  • Custom Lengths: Tailor the product to your needs with lengths available from 2 meters to 5.8 meters.
  • Flexible Spacing: Select spacing from 100mm to 600mm, offering maximum design freedom.

Whether you’re working on a large-scale infrastructure project or a bespoke architectural design, the Durabar Carpet offers the flexibility and performance you need.

Why Choose Durabar Carpet?

The advantages of using Durabar Carpet in construction projects are clear. Not only does it simplify logistics and reduce waste, but it also provides engineers and builders with the freedom to customize their approach to reinforcement. The product’s ability to adapt to various requirements makes it an indispensable tool in modern construction.

As the construction industry continues to evolve, Dextra remains at the forefront, delivering innovative solutions that address the needs of today’s builders. The Durabar Carpet is more than just a product – it’s a testament to Dextra’s commitment to pushing the boundaries of what’s possible in construction.

Experience the future of construction with Durabar Carpet.

For more information, learn more about Durabar or contact us today.

Dextra Thailand: Commitment to Community and Sustainability

In a heartfelt gesture of community support and environmental stewardship, Dextra Thailand made significant contributions to a local school near our factory in Bangkok. The day was filled with impactful activities, highlighting our dedication to sustainability and education.

Donation

Dextra Thailand donated unwanted office furniture, still in excellent condition, such as tables and chairs, to a nearby school. This initiative not only provided much-needed resources to enhance the school’s learning environment but also promoted the reuse of materials, aligning with our sustainability goals.

Activities with Green World Foundation

We partnered with the Green World Foundation to engage elementary school students in grades 5-7 in various environmental stewardship activities:

  • Waste Management Best Practices: Through interactive and engaging demonstrations, students learned effective waste management and reduction techniques. This activity promoted a cleaner and healthier environment for all.
  • Environmental Observation: Guided explorations encouraged students to observe and appreciate their natural surroundings. This fostered a deeper connection with nature and a greater understanding of its importance.
  • Creative Engagement: The highlight for many students was the terrarium DIY activity. This hands-on experience allowed children to combine artistic expression with environmental action, creating beautiful and sustainable mini ecosystems.

These activities not only educated the students on important environmental issues but also inspired them to take proactive steps in their daily lives to protect the planet.

Ongoing Commitment to ESG Goals

This dynamic event underscored Dextra Thailand’s ongoing commitment to Environmental, Social, and Governance (ESG) goals. By supporting local communities and promoting environmental education, we continue to lead by example in fostering a sustainable future.

At Dextra Thailand, we believe that our efforts today will inspire the leaders of tomorrow. Together with our partners and community, we are dedicated to making a positive impact on both the environment and society.